9
Z886 PERMA-TRENCH
INSTALLATION INSTRUCTIONS
1
Cut joint connector to height. It should fit snug on the
radius portion of the trench to just below the upper lip of
the channel.
1
When job layout calls for female-to-female channel
connection with HD frame, cut female ends to be flush
with end of the HD frame on the ends that will be
connected.
2
Attach to the channels with the hardware provided.
2
Screw the joint connector to the channel with the
hardware provided. This method can also be used if you
have a male-to-male connection. Ends are not cut off, but
ribs will need to be trimmed (See page 7).
Z886 Connecting
the Trench
Z886-HD
Channel Connection
WITH JOINT CONNECTOR
Scrap
Scrap