P-661HW-D Series Support Notes
11. Using Call Scheduling
•
What is Call Scheduling?
Call scheduling enables the mechanism for the P-661HW-D to run the remote
node connection according to the pre-defined schedule. This feature is just like
the scheduler ina video recorder which records the program according to the
specified time. Users can apply at most 4 schedule sets in Remote Node. The
remote node configured with the schedule set could be "Forced On", "Forced
Down", "Enable Dial-On-Demand", or "Disable Dial-On-Demand" on specified
date and time.
•
How to configure a Call Scheduling?
You can configure a call scheduling in CLI
Suppose we want to edit a call schedule set like this:
Call Schedule Set #=
1
Set name=
Test
Active=
Yes
Start Date(yyyy-mm-dd)=
2005 - 12 - 27
How Often=
Once
Once:
Date(yyyy-mm-dd)=
2005 -12 -27
Start Time(hh:mm)=
12 : 00
Duration(hh:mm)=
16 : 00
Action= Enable
Dial-on-demand
This schedule example permits a demand call on the line on 12:00 a.m.,
2005-12-27. The maximum length of time this connection is allowed is 16
hours.
To implement this, we need to invoke the following command one by one:
wan callsch index
1
(Set call schedule index #= 1. You must apply this command first before you
begin to configure call schedule)
wan callsch name
Test
(Set the schedule name as Test)
wan callsch active
Yes
(Enable schedule)
wan callsch startdate
2005 12 27
(Set schedule start date as 2005-12-27)
84
All contents copyright © 2006 ZyXEL Communications Corporation.