P314 Broadband Sharing Gateway with 4-Port Switch
Hardware Installation and Setup
2-1
Chapter 2
Hardware Installation & Initial Setup
This chapter shows you how to connect the hardware and perform the initial setup.
2.1 Front Panel LEDs and Back Panel Ports
2.1.1 Front Panel LEDs
The LEDs on the front panel indicate the operational status of the Prestige.
Figure 2-1
Front Panel
The following table describes the LED functions:
Table 2-1
LED Functions
LEDs
Function Indicator
Status
Active
Description
PWR
Power
Green
On
The power adapter is connected to the Prestige.
Off
The system is not ready or failed.
On
The system is ready and running.
SYS
System
Flashing
The system is rebooting.
Green
Off
The 10M LAN is not connected.
On
The Prestige is connected to a 10M LAN.
10M LAN
LAN
Flashing
The 10M LAN is sending/receiving packets.
Off
The 100M LAN is not connected.
On
The Prestige is connected to a 100 Mbps LAN.
100M LAN
Orange
Flashing
The 100M LAN is sending/receiving packets.
WAN
WAN
Green
Off
The WAN Link is not ready, or has failed.