background image

3M

 No Polish ST Connector SM and MM,

Flat Splice, 250/900 µm

Instructions

3

November 2012

78-0013-6978-0-B

The Network of Networks.

Summary of Contents for 8865-C

Page 1: ...3M No Polish ST Connector SM and MM Flat Splice 250 900 µm Instructions 3 November 2012 78 0013 6978 0 B The Network of Networks ...

Page 2: ...lushing for ten minutes Contact a physician Upon skin contact wash with soap and water Product Information Material Safety Data Sheet or call 3M at 1 800 364 3577 or 651 737 6501 24 hours Bare Fiber Handling CAUTION To reduce the risk associated with handling sharp glass fibers Cleaved glass fibers are sharp and can pierce the skin Use tweezers when handling shards and dispose of them properly per...

Page 3: ... protrude more than 1 mm 04 inches beyond where the 900 µm buffer is stripped away One way to help ensure this is to use the clamp on the fiber holder during the stripping process Here s how Place the fiber holder on the fiber facing backwards clamp closet to cut end and 20 cm 8 inches from the end of the fiber Secure the fiber into the SEMI TIGHT BUFFER groove of the clamp Proceed to strip the fi...

Page 4: ...when using loose tube or semi tight buffered fiber 2 5 With the guide funnel fully forward lay the fiber in the central groove along the length of the fiber holder as shown Position it such that the stripped and cleaved portion extends slightly beyond the tip of the guide funnel If the fiber has a noticeable amount of curvature orient it so the curvature is directed downward toward the fiber holde...

Page 5: ...of 3 mm sec Guide funnel door opened by cam on the assembly base Fiber bow should start when the white line on fiber holder aligns with the BOW START mark on the assembly base 2 8 While slowly sliding the fiber holder toward the connector a bow should start to form in the fiber when the white line on the fiber holder aligns with the white BOW START line on the assembly base If a bow is not seen sl...

Page 6: ...nstall it into the receptacle 2 2 reinsert the fiber holder into the assembly base being careful to avoid damaging the fiber and proceed with step 2 12 To remove the connector from the fiber place it into the cap popper cavity on the assembly base oriented as shown Then press down firmly using equal pressure at each end of the connector This action will pop the element activation cap upward thereb...

Page 7: ...h Connector ST Assembly Tool 1 package RoHS Compliant 2002 95 EC means that the product or part Product does not contain any of the substances in excess of the maximum concentration values in EU Directive 2002 95 EC as amended by Commission Decision 2005 618 EC unless the substance is in an application that is exempt under EU RoHS This information represents 3M s knowledge and belief which may be ...

Page 8: ...y Limited Remedy Limited Liability This product will be free from defects in material and manufacture for a period of one 1 year from the time of purchase 3M MAKES NO OTHER WARRANTIES INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE If this product is defective within the warranty period stated above your exclusive remedy shall be at 3M s opt...

Reviews: