background image

UNB12

www.ABBALightingUSA.com

INSTALLATION GUIDE

Summary of Contents for UNB12

Page 1: ...UNB12 www ABBALightingUSA com INSTALLATION GUIDE ...

Page 2: ...ctions before assembly installation and use By doing so you ll not only guarantee correct function and safety but also optimize the full potential of this exceptional product Thank you for choosing us as your trusted provider of top notch products we truly appreciate your business WARRANTY We stand behind the quality of our product and offer a 2 year warranty from the date of purchase Please note ...

Page 3: ...dth and clearance meet the specified requirements www ABBALightingUSA com 6 Using a suitable main cable connector for direct burial attach the fixture s wires We recommend using WN12 waterproof wire nuts sold separately for optimal connectivity To establish a dependable and enduring electrical connection between fixture wires and the main line in outdoor or underground installations it is essentia...

Page 4: ...lowing it to fill the space between the fixture and the hole c Use a shovel or similar tool to gently pack the pea gravel or sand ensuring it settles evenly and provides stable support Step 4 Verify the completed installation a Inspect the fixture to confirm that it is securely positioned in the hole b Check that the pea gravel or sand fills the extra space adequately providing proper drainage aro...

Page 5: ...www ABBALightingUSA com 3 Gravel 3 Gravel Both sides Below Concrete Main line WN12 Sold separately 3 Gravel 3 Gravel Both sides Below Soil Main line WN12 Sold separately ...

Reviews: