Summary of Contents for Parallel

Page 1: ...Parallel Installation Manual Universal Parallel Cable...

Page 2: ......

Page 3: ...AccuBoom system See the Viper Installation and Operators Manual for instructions on setting up the software and using the AccuBoom system You will also need a valid AccuBoom Control Activation Key for...

Page 4: ...AccuBoom Universal Parallel Cable Installation Manual 2 Notes...

Page 5: ...se the following procedure to properly install the Universal Parallel AccuBoom cable 1 Disconnect the existing console cable Note The Universal Parallel AccuBoom cable is compatible with the Raven SCS...

Page 6: ...0171 500 to the back of the Raven console b Connect the other connector on the Universal Parallel AccuBoom cable P N 115 0171 500 to the console cable previously disconnected from the console 3 Route...

Page 7: ...mount the AccuBoom node 4 Mount the AccuBoom node a Identify a location for the Parallel AccuBoom node P N 063 0172 517 that will protect it from the elements as much as possible b Bolt the Parallel A...

Page 8: ...to the AccuBoom node a Connect the red wire to the master power switch Note The combined current of all the boom value control signals will run through this wire If the master switch can not support s...

Page 9: ...on is now complete Install the Activation Key in the Viper system and program the look ahead value in the AccuBoom look ahead setup screen See the Viper Installation and Operators Manual P N 016 0159...

Page 10: ......

Page 11: ...ase to his distributor or to Raven for final approval WHAT WILL RAVEN INDUSTRIES DO When our inspection proves the warranty claim we will at our option repair or replace the defective part and pay for...

Page 12: ...ree 800 243 5435 Flow Controls Division Fax 605 331 0426 P O Box 5107 www ravenprecision com Sioux Falls SD 57117 5107 fcdinfo ravenind com AccuBoom Uniiversal Parallel Cable Installation Manual P N 0...