background image

WWW.LYBGA.COM

深圳利洋焊接设备

Shenzhen LiYang welding Equipment Co., Ltd

LY

BGA Rework Station

User Manual

IR6000

1

Summary of Contents for IR6000

Page 1: ...WWW LYBGA COM 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY BGA Rework Station User Manual IR6000 1 ...

Page 2: ...t one time 4 IR6000 can be connected to a computer to be controlled more conveniently with a built in PC RS232 serial port and proprietary Software attached to it programmable 5 IR6000 can easily rework the variety of CPU s seat all kinds of shielding enclosures replacement of various components slot Can easily deal with lead free soldering rework 6 IR6000 sensitive temperature measurement sensor ...

Page 3: ...as been properly connected properly before using the products Installed the equipment in stable work platform to use where the air mobility should be small as possible Avoid it closing to air conditioners fans and the other outlet In case of electrical short circuit avoid the products contacting with water Forbid using this equipment in flammable and explosive substances The operators hands or oth...

Page 4: ...g Products should be kept in the air mobility of a smaller environment under the welding operation 2 Conservation environment of products z z Storage temperature 20 70 Storage humidity 5 to 95 non condensing 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY WWW LYBGA COM 4 ...

Page 5: ...wer 1250W Temperature Control Control mode of Upper Independent temperature control high precision closed loop control precision 0 5 Alarm Control mode of Bottom Independent temperature control high precision closed loop control precision 0 5 NO Alarm Rework Function SMD Suit for welding remove or repair packaged devices such as BGA PBGA CSP multi layer substrates EMI metallic shield product and s...

Page 6: ... Bracket Temperature Control Parts Temperature control Table is control the upper and lower heating Can Simultaneously heated or first preheat then the upper part of heating 1 Highly Sensitive K temperature sensor 2 PCB Table 3 Power Switch 4 Upper Heater 5 X Y Lifting Regulator 6 LED Auxiliary Lighting 7 Bottom Heater Pre Heater 深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY WWW LYBGA COM 6...

Page 7: ...ing Switch 9 Upper fan Switch 10 Start Switch 11 Stop Switch 12 Upper Programmable Temperature Control pc410 13 Bottom Temperature Control CH6 Self help Install PCB Table 1 2 3 Installation side support Installation Slip Installation side support WWW LYBGA COM 7 ...

Page 8: ...深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY Upper Heater WWW LYBGA COM 8 ...

Page 9: ...深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY Cable connector Temperature sensor WWW LYBGA COM 9 ...

Page 10: ...器内部已设置多个常用程序段 不要轻易尝试修改程序参数 请按 PTN 键 选择您所需要的程序段 The programmable controller contains an in built setpoint generator in addition to the controller function This setpoint generator can produce a temperature time profile with 16 segments 0 9 When the program is running the current setpoint from the setpoint generator is fed to the control algorithm The current setpoint is continuously shown on the low...

Page 11: ... lit when the PV is rising During program control is lit when the PV is constant During program control is lit when the PV is falling PTN Pattern number display Indicates the pattern number 0 9 RUN Program control runing indicator The LED indicator is lit during program control PV PV Display Indicates the Process Measured value SV It is lit when the Setting Value SV is being displayed on the lower...

Page 12: ...ll be ended when the program runs to the slope Target Setpoint 1 The target value to which the setpoint ramps when the programmer has been placed into RVN Dwell period 1 In a Dwell period the target setpoint which has been attained remains unchanged for a fixed period All the dwell periods are defined by their duration in minutes with parameters D1 D2 D3 0 9999 When the program is running these pa...

Page 13: ...深圳利洋焊接设备 Shenzhen LiYang welding Equipment Co Ltd LY Program Parameter List WWW LYBGA COM 13 ...

Page 14: ...Y Rework Operation Steps 1 be all set Fixed motherboard shift sensor sensor press close to BGA chip Adjust the height of heating head with adjustment knob Prompt BGA chip in the middle of heating head heating head away from BGA chip 2CM WWW LYBGA COM 14 ...

Page 15: ... the following solder ball BGA chip is completely liquefied BGA chips should be subject to settlement floating state 3 Heating completed and Sensor 1 Close Switch for top and bottom Then Moving Heating head 2 Remove motherboard Clear insulating tape 3 BGA Rework Station Cooled Then close Total Power Warning z If BGA Rework Station NO Cooling Do not close the Total Power z When the temperature is n...

Page 16: ...al of chips so as to avoid pad off chip or motherboard scrap 6 To improve success rate of Rework PCB and chips need drying and processing in principle PCB board or chip moist heat process will occur in the burst phenomenon the Rework process may hear the blasting sound of a minor According to actual situation Please self control 7 PCB board heating time is too long or repeated several times the su...

Page 17: ... al value temperature numeric al value Temperature time S numeric al value S r1 0 5 L1 90 d1 90 r2 0 85 L2 135 d2 45 r3 0 8 L3 170 d3 40 r4 1 L4 185 d4 45 4 Lead free Computer slope S numeric al value temperature numeric al value Temperature time S numeric al value S r1 0 45 L1 90 d1 90 r2 1 L2 145 d2 40 r3 1 L3 180 d3 50 r4 1 L4 220 d4 45 5 For XBOX slope S numeric al value temperature numeric al...

Reviews:

Related manuals for IR6000