background image

Assembly instruction
Admiral SNAKE cable guide

Code:

Product:

Summary of Contents for SNAKE

Page 1: ...Assembly instruction Admiral SNAKE cable guide Code Product ...

Page 2: ...Product Code SNAKES can have a base of 2 3 and 4 meter ...

Page 3: ...N028Z 5 bend ZEKGSN100 ZEKGSN100Z 6 brass bearing set short per bag of 25 pieces 7 brass bearing set long per bag of 25 pieces 8 SAM draadbeugel vangarm m beugel Detail A NOTE Use lenth profile always in the direction of the arrow Keep the bended part to the base of the arrow Code Product Assembly instructions Admiral Snake code ending with Z means black coated RECOGNIZE the parts ...

Page 4: ...6 6 7 7 6 6 6 6 NOTE Long brass bearings only to be used with connection elements Code Product RECOGNIZE the parts ...

Page 5: ...NOTE Slots faces to outside and bottom Each build starts with the bottom hinge No matter the lenght of the base of the snake START Product Code Building sequence ...

Page 6: ...wanted end product STEP 1 Connect hinge NOTE Insert short brass bearing from the inside out Use metal ring on the outside insert rivit 4 8x8 mm B Detail B Code Product Building sequence ...

Page 7: ...nect the 2e length part NOTE Insert the LONG brass bearing from the inside out Connect the 3e length part NOTE Insert the LONG brass bearing from the inside out Product Code STEP 2 Building sequence STEP 3 ...

Page 8: ...Connect the bend NOTE Insert the short brass bearing from the inside out C TOP Detail C NOTE Bends are inwards and on top Product Code Building sequence STEP 4 ...

Page 9: ...NOTE Slots faces to outside and ceiling Detail D Product Code Building sequence STEP 5 TIP put the current assembly asside And start with the second sequence assembly of all sub assemblys is the last step Connect all sub assemblies acording drawing ...

Reviews: