background image

 

PLEASE RETAIN THIS GUIDE FOR FUTURE REFERENCE

 

 

BK 768

  Rev 01

 

ISSUE DATE : 24/06/2022 

Chimeneas  

(Deck Open, Deck Closed & Teepee) 

User Guide

 

22 

Summary of Contents for Deck Open Chimeneas

Page 1: ...PLEASE RETAIN THIS GUIDE FOR FUTURE REFERENCE BK 768 Rev 01 ISSUE DATE 24 06 2022 Chimeneas Deck Open Deck Closed Teepee User Guide 22 ...

Page 2: ...nd get the best from your appliance Please ensure that you read these instructions in full and understand them before operating your heater Arada has a policy of continuous product development and therefore we reserve the right to amend specifications without prior notice Due to printing cycles items or options may be described before they are generally available or after they have ceased in produ...

Page 3: ...ontents 1 Identifying your Chimenea 3 2 Warnings 4 3 Preparation for use 5 4 Lighting your Chimenea 6 5 Care of your heater 7 6 Warranty 7 7 Recycling 8 1 Identifying Your Chimenea Closed Deck Chimenea Open Deck Chimenea Teepee Chimenea ...

Page 4: ...table and non recommended fuels or materials or liquid fuels allowed A suitable non flammable level surface would be an ideal location for the heater however the appliance can be used upon wooden decking or grass but caution should be exercised when re fuelling the appliance due to the risk of hot falling ash when refuelling Caution must be exercised during operation of the appliance as both inter...

Page 5: ...ary screws holding the appliance to the base packaging pallet these will need to be removed and the chimenea carefully moved onto the ground Again the wooden pallet can be recycled See Fig 1 Place on to a suitable level location ensure the appliance is stable and secure Ensure the ash pan grate is fitted See Fig 2 In the case of the Open Closed Chimeneas position the 4x vermiculite liners into the...

Page 6: ...er fire lighter on the very top See Fig 6 Light the top fire lighter the structure will start to burn downwards causing the lower combustion products to ignite Leave for approximately 5 10mins to establish an ash bed Reload on to a hot glowing ember bed with fresh logs Fig 5 Fig 6 DO NOT use and flammable liquids for lighting or re lighting this heater During the first lighting an odour may be pre...

Page 7: ...ter long term storage inspect the heater for wear and tear or damage Should external areas need re painting only use Arada high temperature aerosol paint as differing paints may react with the surface finish Replacement parts can be obtained from www aradastovesandspares com or your local retailer PLEASE NOTE Discolouring of the exterior finish and surface oxidation is normal through usage and add...

Page 8: ...Household Waste Recycling Centre PLASTIC Internal Bubble Packing Bags Outer Strapping Some district councils collect plastic packaging in their kerbside collections Alternatively most supermarkets have plastic bag collections The outer strapping should be taken to your local Household Waste Recycling Centre 7 2 End of life product recycling Again like the packaging the majority of the appliance co...

Reviews: