background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

www.arfit.pt 

R. Domingos Ferreira da Costa nº 280 - Z.I. da Maia I, Sector VIII 4475-297 Gemunde Maia 

T 223 797 631 F 223 720 231 E geral@feiocomp.pt

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recovery Units HE EC 

Instructions Manual 

 

ECOEVO

 HE 

EC

 

Quality Management  System certified  according to the Norm  ISO 9001:2008  by TÜV Rheinland Portugal. 
 

Summary of Contents for ECOEVO HE EC

Page 1: ...0 Z I da Maia I Sector VIII 4475 297 Gemunde Maia T 223 797 631 F 223 720 231 E geral feiocomp pt Recovery Units HE EC Instructions Manual ECOEVO HE EC Quality Management System certified according to the Norm ISO 9001 2008 by TÜV Rheinland Portugal ...

Page 2: ...ter in the unit Electric resistances must be interconnected to control devices that should prevent them from working when the ventilator is not functioning stop them if the security thermostat is activated and guarantee a post ventilation period when they are switched off to allow them to cool down Movable parts Before conducting any intervention make sure the ventilator is not functioning Start t...

Page 3: ...r mat Check the state and sludging of the filters clean and replace them if necessary General interior cleaning Maintenance frequency Every month Heat exchanger Operations to carry out Make sure there are no debris inside the section Check if all screws are bolted to avoid unnecessary vibrations Check the state and cleaning of the exchanging element General interior cleaning Maintenance frequency ...

Page 4: ...Possible reparations do not extend the warranty period nor give the right to ask for a compensation Damages and losses suffered by the user as a consequence of a failure Possible reparations do not extend the warranty period nor give the right to ask for a compensation Warranty won t be valid when The type plate is tampered or adulterated False information is provided The equipment does not have a...

Reviews: