background image

INSTALLATION AND 
OPERATING INSTRUCTIONS

• Ariterm 35+     

Summary of Contents for 35+

Page 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 35 ...

Page 2: ...ns 7 Technical specifications and boiler cross section 8 Operating principle 9 Installation of grate and ceramic parts 10 12 Operation 13 Heating 14 15 Service and maintenance 16 Use of alternative fuels 17 Warranty and removal from use 18 Most common spare parts 18 Declaration of conformity 19 Notes 20 23 ...

Page 3: ...n frame On the bottom is a pallet which can be used to lift the boiler safely It is advisable to open the package as close as possible to the installation locati on The factory insures the boiler against transport damage which includes transport from the factory to the first intermediate storage point It is important that whoever receives the boiler should check its condition before accepting it I...

Page 4: ...st be about the same size as the flue This opening must never be covered Plumbing connections Ariterm 35 is intended for use with an accumulator tank Before installation of the boiler the heating system must be flushed and a water pressure test carried out The tightness of the con nections must be ensured before installation The factory is not responsible for damage caused by leaking connections S...

Page 5: ...ng 4 Heat supply pump underfloor heating 5 Heat supply pump radiator heating 6 Underfloor heating system manifold 7 Radiator heating system 8 Expansion vessel 9 Service shut off valve 10 Safety vent 11 Refill valve 12 Input mixing valve 13 Process water circulation pump 14 Thermal safety device 15 Accumulator switch Laddomat 21 LVI 5012912 16 Warm water accumulator Connection to boiler top Ball ch...

Page 6: ...temperature limit valve for this boiler This does not ho wever replace other safety devices such as a safety vent Installation The temperature limit valve is connected to the cooling spiral or to the fork junction in the warm process water pipe so that when the valve operates it sends hot water down the drain The temperature sensor is installed on the sleeve on the upper part of the boiler using a...

Page 7: ...nvection cleaning hatch 10 Convection ash removal hatch Part Name Unit 11 Fixed hatch for afterburning chamber hinged service hatch an option 12 Safety valve connection DN 20 13 Water accumulator outlet DN 50 14 Water accumulator return DN 50 15 Expansion unit DN 25 outer thread 16 Blow off unit DN 15 17 Cooling spiral units Cu 15 18 Flue connection 168 19 Flue gas fan A35 121D 20 Boiler water tem...

Page 8: ...volume Burning time Size of refill opening Chimney recommendation 800 mm 1109 mm 1300 mm 690 kg 150 L 120 L 37 kg 3 h 550x350 mm 150 mm 4 m Design and adjustment values Boiler operating pressure Permitted operating temperature Suitable size of accumulator Max length of logs 0 5 1 5 bar Max 120 C 1800 3000 L 0 5 m afterburning chamber convection section storage chamber grate direct damper ...

Page 9: ...ommodate about 37 kg of dry firewood Burning time is three hours without having to add more wood and the tem perature in a 2000 litre accumulator will rise by about 50 C if no heat is being used at the same time Afterburning of gases This takes place in a round ceramic chamber into which pre heated secondary is introduced Adjustment of the secondary air is done using the lower damper The key facto...

Page 10: ...alled through the opening at the side in the following order 1 Lower brick 2 Lower parts of side brick 3 Lower part of front brick 4 Lower part of rear brick 5 Upper part of rear brick 6 Upper parts of front brick The upper parts support each other with a suitably sized piece of wood in between for example 7 Upper parts of side brick 2 pcs pay attention to left or right handedness Remove the tempo...

Page 11: ...ck 5 Upper part of rear brick 5 Upper part of rear brick 6 Upper part of front brick The upper parts support each other with a suitably sized piece of wood in between for example 6 Upper part of front brick INSTALLATION OF THE GRATE AND CERAMIC COMPO NENTS ...

Page 12: ...RATE AND CERAMIC COMPO NENTS 6 Upper part of front brick 7 Upper parts of side brick 2 pcs pay atten tion to left or right handedness Remove the temporary support then installation is complete 1 2 3 Installation of base bricks ...

Page 13: ... going for about three hours ensuring that the combustion gas temperature does not exceed 140 C After that you can heat normally Basic adjustments Adjustment of the damper 1 Set the primary air regulators to position 5 2 Set the secondary air regulators to position 3 3 The recommended combustion gas temperature is ca 150 C The combustion gas tempe rature in question shows that the combustion tempe...

Page 14: ...r out into the ignition position 4 Check that the charger cycle is fully functional and double check that the charging pump thermostat is set to 65 degrees 5 Start flue gas fan from control unit 6 Insert the charge through the feed hatch onto the lower edge of the grate all the way to the afterburner opening and light the fire 7 Lay approximately 5 kg an armful of dry firewood of small diameter on...

Page 15: ...Slowly open the refill hatch which will release the burning gases from the storage chamber 3 Fill the storage chamber N B Fuel should only be refilled when the energy created can be stored in the accumulator tank or otherwise consumed Boiling of the accumulator tank and boiler must be avoided Primary air hatch to pos 5 Secondary air hatch to pos 3 ...

Page 16: ...any loose incrustation with an ash scraper 4 Open the firebox hatch clean the grate and empty the ashbox into a fire proof ash bucket N B The surface of the ash must never rise up to touch the grate This prevents cooling of the grate and will rapidly result in damage For this reason too the holes in the grate must be open Ensuring the tightness of the hatches All pitch etc must be removed from the...

Page 17: ...d All hatches and air openings must be tightly closed when using an oil bur ner Use of electricity No electrical resistors can be installed in this boiler They should be fitted in the accumulator tank Pellet use Ariterm 35 is compatible with an KMP PX22 pellet burner Replace the stoking hatch with a hatch with an PX22 pellet stoker If you use a pellet burner close primary and secondary air vents S...

Page 18: ...11 Front brick lower 545x115x109 1 13612 Rear brick lower 545x126x88 1 13613 Lower brick 446x255x50 1 13614 Side bricks lower part 50x150x275 2 13615 Side bricks upper part left 50x131x322 1 13616 Side bricks upper part right 50x131x322 1 13617 Front brick upper 545x104x215 1 13618 Rear brick upper 545x210x137 1 13375 Gas spring 2 5880 Thermometer 1 5883 Combustion gas thermometer 0 500 C 1 5882 P...

Page 19: ...19 DECLARATION OF COMFORMITY ...

Page 20: ...20 NOTES ...

Page 21: ...21 NOTES ...

Page 22: ...NOTES ...

Page 23: ...23 NOTES ...

Page 24: ...ORGANISATION CERTIFIED BY 27 11 2012 All Rights to modifications and corrections reserved ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www ariterm se 0771 442850 ...

Reviews: