background image

www.boilers-attack.com

ATTACK PELLET 30

AUTOMATIC PLUS

Instructions for use

EN

EN 04/2021

ATTACK PELLET 30

AUTOMATIC PLUS

Instructions for use

EN

Summary of Contents for PELH30Plus

Page 1: ...www boilers attack com ATTACK PELLET 30 AUTOMATIC PLUS Instructions for use EN EN 04 2021 ATTACK PELLET 30 AUTOMATIC PLUS Instructions for use EN ...

Page 2: ......

Page 3: ...f burner 17 Technical data of burner 17 Voltage and energy consumption of burner 17 Description of burner function 18 Usage of pellet burner 18 How to install pellet feeder and container 19 Burner start 20 Burner shut down 20 Emergency shut down 20 Cleaning and maintenance 20 Troubleshooting 21 Accessories 21 Instructions to disposal of product after expiration of its lifetime 21 Disposal of packa...

Page 4: ...ween boiler and chimney have to be airtight Overpressure in combustion chamber should be at least 5 pascal 0 5 mm of water column resp 0 05 hPa The PEL30PLUS appliance is intended for combustion of wood pellets and it cannot be used for combustion of other fuel types The PEL30PLUS appliance for pellet combustion can be installed in a boiler room only in conformity with prescriptions of the local f...

Page 5: ...ns of the correct boiler operation are selection of the correct boiler type and output impeccable commission correct attendance periodical technical maintenance reliable service GENERAL DESCRIPTION The ATTACK PELLET 30 AUTOMATIC Plus boiler for pellet combustion is intended for economical and ecological heating of dwelling houses cottages small plants and similar objects Wood pellets are prescribe...

Page 6: ...lifetime Tubular exchanger is equipped with turbulators ensur ing better heat transpher into heating water They also serve for exchanger cleaning to provide uniform efficiency Combustion takes place in the burner Optimal conditions for burning and output regulation are ensured electronically by controlling fuel and air supply in dependence on the heating parameters required by user Construction of...

Page 7: ...ight mm 1204 Boiler width mm 550 Boiler depth mm 1 234 Dimensions of pellet tank 500 l mm 720 1240 830 Protection of el parts IP IP40 Max el input by ignition W 600 Operating el input W 90 Boiler efficiency 90 6 Boiler class by CO emission under EN 303 5 5 Flue temperature by nominal output C 143 Prescribed fuel Drevné pelety 6 mm l 35 mm max Average consumption kg h 1 2 4 6 9 Volume of water in b...

Page 8: ...announcement DIMENSIONS OF BOILER ATTACK PELLET 30 AUTOMATIC PLUS MAIN PARTS OF BOILER ATTACK PELLET 30 AUTOMATIC PLUS 1 boiler body 7 flue collector with flue exhaust 2 covering 8 flow connection 1 3 detachable ash container 9 return connection 1 4 door of control opening 10 inlet outlet valve 5 burner 6 tubular exchanger ...

Page 9: ...e specific conditions of the heating system The electrical installation associated with the boiler s additional equipment must be carried out by a specialist in accordance with the applicable standards Connection to electricity mains Boiler is connected to el mains 230 V 50 Hz by plug with fork Plug of M type has to be replaced by service technician with the same type of plug Appliance must be pla...

Page 10: ... of constructive materials by the grade of flammability grade of flammability A inflammable brick block ceramic tiles mortar plaster grade of flammability B very difficult to ignite heraclith lignos boards from bazart felt grade of flammability C1 hard flammable beech oak plywood wersalit hardened paper grade of flammability C2 medium flammable pine spruce chipboard solodur grade of flammability C...

Page 11: ...ing requirements of the STN 07 7401 1991 and its callosity cannot exceed 1 mmol l and concentra tion Ca2 0 3 mmol l By unkeeping these conditions warranty for boiler expires Selection and way of connection of regulation and control elements Boiler is delivered with basic regulation and control equipment Connection of these elements is given on connection scheme It is recommended to extended boiler...

Page 12: ...RP room thermostat ecoSTER TOUCH ecoSTER200 BP control panel M1 mixer temperature sensor 1 type CT4 M2 RS mixer temperature sensor 2 type CT4 WS of external sensor type CT6 P HW temperature sensor D H W type CT4 T2 standard room thermostat BT boiler temperature sensor type CT4 FT flue gas temperature sensor type CT2S L N PE connection 230V STB input for emergency temperature thermostat FH pellet s...

Page 13: ...11 BURNER CONNECTION SCHEME 1 Photocell 5 Fan 2 Door end switch 6 Ignition coil 3 Flue gas backflow preventer 7 Control electronics 4 Grate cleaning motor ...

Page 14: ...n is advantageous due to its compactness easy attendance and guaranted protection of the boilers heat exchanger Regumat for boiler ATTACK PELLET ordering code DPP25003 BINDING NORMS FOR BOILER PROJECTING AND ASSEMBLY STN EN 303 5 Heating boilers for solid fuels STN 734210 Design of chimneys and flue exhausts STN 920300 Fire safety of local appliances and heat sources STN EN 60335 1 A11 safety of e...

Page 15: ...al e g room thermostat programmable regulator Details about setting the burner parameters are described in the next chapters of this manual ATTENTION Condensation and condensate leakage may occur by first heat up After longer heating condesation is eliminated f the boiler was out of order for longer period turned off or faulty it is necessary to be more careful when starting it again After longer ...

Page 16: ...ake place before the supply of pellets in this tank is consumed In the electronics it is possible to set the function of checking the amount of fuel in the tank Based on this setting it is possible to display the current amount of pellets in the tank on the boiler display ATTENTION Fuel container can be open only when fuel is being refilled eventually by cleaning Container has to be closed during ...

Page 17: ...put the ash tray back and to close the ash tray door tightly WARNING Do not operate the boiler without the ash container fixed with the closed upper cover possible flue leakage life safety hazard Short time boiler stop If you wish to stop the boiler for a short time turn the burner switch off and let the fuel burn down in the burner Long time boiler stop When stopping the boiler for a long time fi...

Page 18: ...oor sealing cord Remove the old sealing cord by screw driver and clean the groove where the cord is placed Take new cord and put its leading end between the horizontal parts of the groove Use hand eventually hammer to fit the cord into the groove along the door edge Fitting the hinges After some time it may come to abrasion of the sealing cord To endure tightness of door it is necessary to change ...

Page 19: ... uses control system to regulate gear of ash removing auger and gear of exchanger cleaning by turbulators Boiler convection parts should be cleaned periodically to keep high efficiency of heating Burner is intended for combustion of wood pellets with diameter of 6 mm Burner is manufactured following the industrial norms and prescriptions and it was tested and approved in conformity with directives...

Page 20: ...put any body parts or other foreign objects into burner when it is operating Normal start when there is still flame in burner If photocell recognizes flame during the start up phase e g after short time power failure con trol system immediately begins transition period Pellet burner continues in operation as by normal start see above ATTENTION Make sure that sufficient flue gas temperature had bee...

Page 21: ...of feeder and inlet pipe should be in min distance of 150 mm i e not vertically aligned Fill container with pellets and connect feeder into power socket 230 V Let feeder run unless it achieves continual pellet supply It is recommended to fasten plastic bag to the opening of feeder to catch the falling pellets Disconnect feeder from socket Install inlet hose between feeder opening and inlet pipe an...

Page 22: ...it 2 Scrape ignition plate a grate and clean the holes in grate 3 Open the lid of turbulators and remove remaining dust e g by vacuum cleaner Make sure that dust is not hot and it cannot burn bag of vacuum cleaner 4 Once in 3 months it is necessary to dismantle rotary chimney part and to remove accumu lated dust ATTENTION Keep ash in closed containers from inflammable material Maintenance once a y...

Page 23: ...e ensured by a scrapyard eventually by a disposal site controlled by appropriate municipal authority DISPOSAL OF PACKAGING Dispose of the packaging through one of the repurchases of collected raw materials or use a landfill ACCESSORIES The ATTACK PELLET 30 AUTOMATIC Plus boiler is delivered functionally tested As standard the boiler is equipped with a flange for the ATTACK burner The boiler is pac...

Page 24: ...the following screen will appear on the display After pressing the MENU icon the following screen will appear The selection of the icon function can be selected on the right or on the left The icon you press appears in the center of the screen When you need to find another one gradually press the end button until the one you want appears It is now possible to make two pushes ...

Page 25: ...boiler After pressing the small i icon in the bottom line the following screen will appear This describes what will be done by pressing the large icon in the middle of the screen This icon can be pressed at any time and the description will always be for the current icon When you need to turn on the boiler this can be done in two ways 1 Way ...

Page 26: ...24 Find the power icon and touch it Then this icon will appear in the center of the screen When you press this icon the following screen will appear After confirmation the boiler starts to work ...

Page 27: ...owing screen will appear After confirmation the boiler starts All the functions listed below need to be found in the MENU display and perform actions according to the instructions This applies to each icon When you select any of the icons in the bottom line the icons for working with that option will change ...

Page 28: ...ntly measured boiler temperature 4 Main menu 5 Graphical display of operation ventilator fan feeder pump ignition coil 6 Currently measured DHW temperature 7 Set DHW temperature holding it will cause the value to be adjusted 8 Time and date 9 External temperature 10 Values affecting the set temperature where the symbols mean room thermostat contacts open the set room temperature has been reached r...

Page 29: ... temperature during the heating of the accumulation tank backup boiler operation The right and left windows on the main screen can contain different information By touching the screen it is possible to change the displayed information between mixing circuits information window domestic hot water window fuel level window etc Tip You can check the fuel level on both the room panel and the room therm...

Page 30: ... 3 5 Poker 1 3 6 DHW pump 1 4 Information 1 4 1 Burner output 1 4 2 Burner 1 5 Information 1 5 1 Temp mixer 1 1 5 2 Preset temp mixer 1 1 5 3 Room thermostat mixer 1 1 5 4 Pump mixer 1 1 5 5 Valve mixer 1 1 5 6 Servo 1 6 Information 1 6 1 Temp mixer 2 1 6 2 Preset temp mixer 2 1 6 3 Room thermostat mixer 2 1 6 4 Pump mixer 2 1 6 5 Valve mixer 2 1 6 6 Servo 1 7 Service meter of hours 1 7 1 Working ...

Page 31: ...n correction 2 5 5 Fan correction 2 5 6 Feeder efficiency test 2 5 6 1 Performance test time Length of the feeder performance test At the end of this time weigh the fuel fed and enter the value on the panel net pellet weight 2 5 6 2 Efficiency test time Feeder efficiency test 2 5 6 3 Fuel weight Enter the weighed weight of the pellets in grams 2 6 Fuel level 2 6 1 Alarm level Amount of fuel at whi...

Page 32: ...on 3 4 DHW disinfection After switching on this parameter once a week on Monday at 2 00 am the domestic hot water will be heated to 70 C in order to disinfect the DHW tank Caution risk of scalding from hot water 3 5 Nighttime decrease DHW 3 5 1 ON OFF 3 5 2 Reduction value 3 5 3 Timer see section 2 9 3 4 Summer mode 4 1 SUMMER mode SUMMER mode means switching off the central heating while leaving ...

Page 33: ...ngs see point 5 6 1 Entered temperature of mixer 2 6 2 Thermostat of mixer 2 6 3 Equithermal control of the mixer 2 6 4 Heating curve of mixer 2 6 5 Parallel shift of the curve 6 6 Night reduction tmperature of the mixer 2 6 6 1 OFF ON 6 6 2 Reduction value 6 6 3 Timer see section 2 9 3 7 General settings The menu contains parameters related to settings such as time date screen brightness sound la...

Page 34: ... 1 5 Blow in fan output 100 12 1 6 Blow in fan output 50 12 1 7 Blow in fan output 30 12 1 8 50 H2 Hysteresis 12 1 9 30 H1 Hysteresis 12 1 10 Boiler hysteresis 12 1 11 Regulation mode 12 1 12 Room thermostat 12 2 Firing up 12 2 1 Fuel dose 12 2 2 Ignition test time Check time to see if the burner is lit Only the fan works 12 2 3 Ignition pre heating time 12 2 4 Firing up time Ignition time After t...

Page 35: ...rflow output 12 6 3 Minimum fan output 12 6 4 Maximum fan output 12 6 5 No fuel detection time 12 6 6 Treshhold flame no fuel 12 6 7 Enhancement fan PI 12 6 8 Integration time constant 12 7 Thermostat select 12 7 1 OFF 12 7 2 Universal 12 8 Minimum boiler temperature 12 9 Maximum boiler temperature 12 10 Boiler cooling temperature 12 11 Reserve boiler 12 12 Alarms 12 12 1 AL 1 Poker damaged 12 12 ...

Page 36: ... 2 1 OFF 15 2 2 CH on switched on Central heating 15 2 3 Floor on 15 2 4 Pump only 15 3 Heat source 15 4 Min Mixer 1 temp 15 5 Max Mixer 1 temp 15 6 Proportional range 15 7 Integration time constant 15 8 Valve full opening time 15 9 Off by thermostat 15 10 Mixer without reaction 16 Mixer 2 settings 16 1 Thermostat select 16 2 Mixer 2 support 16 2 1 OFF 16 2 2 CH on switched on Central heating 16 2...

Page 37: ...NTERNET MODULE The controller can work with the ecoNET300 internet module It enables online monitoring and control of the controller via Wi Fi or LAN using the website www econet24 com a web browser or the mobile application ecoNET apk The application can be downloaded free of charge from the website Attention the item Work according to schedule may not be available if the manufacturer of the give...

Page 38: ...ax set temperature of mixer 1 70 C Service settings setting of mixer 1 Mixer heating curve 1 0 8 1 4 Service settings setting of mixer 1 Weather control mixer 1 on setting of mixer 1 Short description of operation The boiler pump 6 operates after exceeding the set pump start temperature Temp heating water on When the temperature of the temperature sensor 17 reaches the set temp charging is complet...

Page 39: ...perating only when the switch on temperature of the pump of central heating s circuit is exceeded in the boiler standard 40 C If the water entering the boiler is cold the thermostatic valve 7 closes The result is a water flow in the short circuit boiler 1 throttle valve 8 thermostatic valve 7 pump 6 The thermostatic valve 7 opens when the temperature of the water returning to the boiler rises and ...

Page 40: ...at 3 27 mixer temperature sensor 3 28 mixer servomotor 4 29 mixer circuit pump 4 30 mixer room thermostat 4 31 mixer temperature sensor 4 32 mixer expansion module 33 DHW tank RECOMMENDED SETTINGS Parameter Set value MENU Mixer operation 1 Floor on Service settings mixer 1 setting Max set temperature of mixer 1 50 C Service settings mixer 1 setting Operation according to weather mixers 1 4 On menu...

Page 41: ...rom 0 75 mm2 to 1 5 mm2 tightening torque 0 4 Nm insulation length 6mm Signal screw cable cross section up to 0 75 mm2 tightening torque 0 3 Nm insulation length 6mm Display Graphic 128x64pix External dimensions 210x115x60 mm Weight of the complete device 2 kg Standards PN EN 60730 2 9 PN EN 60730 1 Class of firmware A Class of protection For incorporation into class devices I Degree of pollution ...

Page 42: ...standard rail Mount the rail firmly on a solid base Before placing the module 1 on the rail 2 lift the handles 3 up with a screwdriver After attaching the modules to the rail push the mounts 3 to their original position Make sure that the device is fixed steadily and cannot be folded off the rail without the use of tools Module installation options a in a module cover with access to the front surf...

Page 43: ...possibility of electric shock and limits damage to the device including fire protection ATTENTION Dangerous voltages can be present at the controller terminals when the controller is switched off using the keys Before starting installation work it is essential to disconnect the mains voltage and make sure that the terminals and cables are not under dangerous voltage Equipped with a residual curren...

Page 44: ...cables with a cross sectional area of at least 0 5mm2 However the total length of the cables of each of the sensors must not exceed 15m Install the boiler temperature sensor in the pit located in the boiler shell Install the feeder temperature sensor on the surface of the pellet tube of the feeder Install the TANK TEMPERATURE SENSOR IN THE TRAY It is best to install the mixer temperature sensor in...

Page 45: ...ty of the wires is not important Connect the other end of the cable to the controller terminals Screw the sensor to the wall using the mounting screws You can access the screw holes by unscrewing the sensor cover Connection of external sensor CT6 P Check of temperature sensors Temperature sensors can be checked by measuring their resistance at a given temperature If you find larger differences bet...

Page 46: ...iler must be switched off After disconnecting the contacts the room thermostat reduces the specified temperature of the mixer circuit by the value of reducing the specified temperature of the mixer compared to the thermostat This parameter can be found in Adjusting the mixer 1 ĺ The room thermostat of the mixer The parameter value should be selected so that when the room temperature is reached roo...

Page 47: ... backup boiler control set H outputs for backup boiler control in the menu Service settings ĺ Output H ĺ Backup boiler ĺ Boiler settings ĺ Replacement boiler To additionally enable backup boiler control you must set the Backup boiler shutdown temperature parameter to a value other than zero The switch off of the backup boiler control follows the setting of the zero value of the switch off of this ...

Page 48: ...ng SMS Connect the alarm reporting device to the controller as shown in the following figure Because this extension is shared with the backup boiler control extension you must disable this backup boiler control for the alarms to work properly Do this as follows Service settings ĺ Output H ĺ Output H1 ĺ Backup power supply Then set output H to control alarms in the menu Service settings ĺ Output H ...

Page 49: ...n which the temperature of the mixing circuit is minimal controller in position 0 open Remember this configuration to verify that the connections are correct later disconnect the controller from the el network connect the el power supply of the mixer and servomotor with switch and enter the value of the servomotor specified by the manufacturer Do not swop the opening direction of the mixing valve ...

Page 50: ... 5 VDC or 12 VDC supply and a rated current of at least 400 mA GND and VCC wires at the output of the ecoSTER TOUCH connected to an external power supply Power supply is not part of the controller delivery Connect the D and D wires as shown in the diagram Cooperation with web module The controller can work with the ecoNET300 internet module It allows the user to view and control the boiler online ...

Page 51: ...ered DHW temperature C 45 20 70 3 2 DHW pump operating mode without priority 3 3 DHW tank hysteresis C 5 1 30 3 4 DHW disinfection OFF 3 5 Night reduction of DHW OFF 3 5 2 Reduction value 0 4 1 SUMMER mode WINTER 4 2 SUMMER mode switch on temperature C 16 5 30 4 3 SUMMARY mode switch off temperature C 10 1 15 5 1 Set temperature mix 1 C 40 20 85 5 2 Thermostat mix 1 0 5 3 Equithermal control mix 1...

Page 52: ...uring cleaning ot min 2650 14 3 2 Exchanger cleaning work sec 10 14 3 3 Cleaning time before ignition sec 15 14 3 4 Cleaning the burner at night NO 14 3 5 Burner cleaning cycles 3 14 4 1 Burner fan power during burnout ot min 1800 14 4 2 Maximum burn up time min 15 14 4 3 Minimum burn up time min 3 14 5 1 Supervision time 0 14 5 2 Boiler output in the mode SUPERVISION kW 2 14 5 3 Work cycle time S...

Page 53: ... 15 6 Heat exchanger YES 16 1 Storage tank operation NO 16 2 Battery charging start temperature C 40 40 80 16 3 Battery charging end temperature C 60 40 85 16 4 Start the heating system C 28 17 1 Thermostat selection OFF 17 2 Mix operation 1 Floor on 17 3 Minimum temperature mix 1 C 20 17 4 Maximum temperature mix 1 C 85 17 5 Extent of proportionality 5 17 6 Integer time constant 130 17 7 Valve op...

Page 54: ...ng the data in a subdirectory Then connect the mains supply to the controller and enter the menu General settings ĺ Program update and replace the program first in module A of the controller then in the controller panel and other devices OTHER FUNCTIONS Power failure In case of a power failure the controller returns to the operating mode it was in before the power failure Freeze protection When th...

Page 55: ...e the control panel itself because the program in the panel must be compatible with the program in the control module Lambda probe The efficiency of the burner can be increased by connecting another oxygen sensor module which should be connected according to the wiring diagram Probe operation must be enabled in the menu Service settings ĺ Boiler settings ĺ Lambda probe If the Lambda Sensor Operati...

Page 56: ...he processing of your personal data We will process your personal data for the following purposes and on the basis of the following legal bases 1 For the purposes of direct marketing which is a legitimate interest of our company The legal basis here is Art Article 6 1 Letter f Regulation EU 2016 679 of the European Par liament and of the Council of 27 April 2016 on the protection of natural person...

Page 57: ...e purposes of fulfilling the ex tended warranty agreement We would not be able to fulfill our obligations under the ex tended warranty agreementproperly without these data Our legitimate interest and one of the two purposes of processing your personal data is therefore the fulfillment of the contract that is the fulfillment of the contract for exten sion of the contractual guarantee Processing of ...

Page 58: ...ress and the text I hereby raise an objection to the processing of my personal data for the purposes of direct marketing and your signature We always inform you about the accepting your requestwithout delay Please note that the right to object can not be invoked against our processing of your personal data necessary for the purpose of fulfilling the extended warranty agreement Your other rights re...

Page 59: ......

Page 60: ...ion is temporary subject to change without notice and for informational purposes only Variations in product visual display are possible and may not match the offer and range of equipment for different markets ATTACK s r o reserves the right to make changes to specifications and content without prior notice Pictures and product specifications are only informative Price and offer changes are reserved ...

Reviews: