background image

Corona Discharge Ozone Generators

INSTALLATION & OPERATION MANUAL

  P/N: 4-1397-01 Rev.G

Summary of Contents for CoPilot Ozonator 3

Page 1: ...Corona Discharge Ozone Generators INSTALLATION OPERATION MANUAL P N 4 1397 01 Rev G...

Page 2: ...No 8 AWG 8 4 mm2 solid bonding conductor between this point and any metal equipment metal enclosures of electrical equipment metal water pipes or conduit within five 5 feet 1 5m of the unit as needed...

Page 3: ...4 COP 2 B 1 2 THREADED CONDUIT COP B CE OPEN 18 3 CORD 44IN LONG 9 3 235 219 8 6 382 15 0 13 6 344 COP 1 A NEMA 5 15P 44IN LONG COP 2 A 1 2 THREADED CONDUIT COP A CE OPEN 18 3 CORD 44IN LONG 10 3 262...

Page 4: ...ion The CoPilot units are designed for wall mounting See Figure 1 Mount generator in a clean protected area either indoors or outdoors preferably out of direct sunlight Locate generator out of reach o...

Page 5: ...y tubing to the port marked OZONE see Bottom View Figure 3 NOTE Connecting the Ozone Line to the incorrect port will cause damage to the ozone generator SECTION 3 Operation Operation 3A General To ach...

Page 6: ...e CoPilot allow the unit to dry completely before restarting the unit Evidence of water in the CoPilot may void the warranty WARNING DoNOTtouchtheendsoftheOzoneCheckValve and Tube Assembly or check va...

Page 7: ...bly is Clogged Clean or replace flow control assembly 4D 5 Symptom Ozone tubing becomes yellow brown and brittle a The high concentration of ozone created by the CoPi lot family of corona discharge oz...

Page 8: ...CE 9 0789 04 Transformer Indicator Board COP 1 A COP 2 A COP A CE 9 0789 05 Transformer Ozone Power Supply COP 2 B COP B CE 9 0789 06 Check Valve and Tube Assembly All CoPilot Models 9 0789 072 Fuse...

Reviews: