background image

Badeloft

AT-05

Installation Instructions

Summary of Contents for AT-05

Page 1: ...Badeloft AT 05 Installation Instructions...

Page 2: ...1...

Page 3: ...2...

Page 4: ...pansion anchor bolts underground box manual water pipe S4mm hex wrench 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 1 1 2 8 8 1 1 2 1 1 1 4 1 1 4 1 specifications water pipe thread G1 2 working pressur...

Page 5: ...disassemble and take out put the dustproof cover on cold water hot water fix the position of the tap underground parts installation basin 4...

Page 6: ...ot connect water pipes fix the screw position fasten the bolts after adjusted the level highest underground level lowest underground level underground parts installation 150mm 150mm 50m m 40mm 10 dept...

Page 7: ...hot adjust again the level after fasten the bolts take off the cover install water test spareparts hot hot cold cold underground parts installation 6...

Page 8: ...0 8Mpa keep for 30min to be sure no water leak turn off the water take off the testing spare parts off off off off Caution please decompress the water before unfasten the screw install pipe cleaning s...

Page 9: ...turn on the valve to let water flush to clean the water pipes on on off off turn off the valve take out the pipe cleaning spare parts put on the cover hot cold underground parts installation 8...

Page 10: ...paving tiles use silicon to close the gaps after everything dried cut off the upper ground parts take off the cover underground parts installation 9...

Page 11: ...the rosette be careful to avoid scratches Fasten the brass nut onto the body use thread glue if necessary insert the 2 water pipes in the tap into the holes in the plastic box underground fasten the...

Page 12: ...push the rosette smoothly down to the ground Lift up the handle to turn on the tap turn left to hot water turn right to cold water taps installation H C 11...

Reviews: