background image

OWNER’S MANUAL

IMPORTANT INFORMATION FOR THE INSTALLER 
AND THE OWNER

INCLUDED:

   THERMOMASSEUR

®

 INSTALLATION

 

 

USING THE MIA

®

 SERIES CONTROLS

IMPOR

TANT

: T

O BE KEP

T F

OR THE O

WNER

+

 

 Register your warranty online   www.bainultra.com/warranty

Summary of Contents for THERMOMASSEUR

Page 1: ...AL IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER INCLUDED THERMOMASSEUR INSTALLATION USING THE MIA SERIES CONTROLS IMPORTANT TO BE KEPT FOR THE OWNER Register your warranty online www bainultra com warranty ...

Page 2: ......

Page 3: ...SEUR INSTALLATION 7 9 PLUMBING INSTALLATION 10 12 BALNEO AMMA AND ORIGAMI FREESTANDING PARTS AND TOOLS 13 SITE PREPARATION 14 15 INSTALLATION 16 19 TURBINE TECHNICAL SPECIFICATIONS 20 ELECTRICAL INSTALLATION 21 23 REMOTE MOUNTING 24 25 SKIRTS GENERAL INSTRUCTIONS 26 PARTS AND TOOLS 27 INSTALLATION 28 40 THE MIA SERIES CONTROLS INSTALLATION 41 USER GUIDE 42 52 MAINTENANCE 53 54 TROUBLESHOOTING 55 5...

Page 4: ...er cannot ac cidentally come in contact with electrical components turbine and power module For indoor use only ELECTRICAL CONNECTIONS Never drop or insert objects into any openings The Thermomasseur must be connected only to a supply circuit that is protected by a 20 amp class A ground fault circuit interrupter GFCI Optional therapies such as Chromotherapy and or 2nd heated backrest and or WarmTo...

Page 5: ...ur order For all questions call BainUltra at 1 800 463 2187 A 10 Drill A 11 11 64 drill bit A 12 82 routing bit A 13 Screws A 14 Appropriate screwdriver A PARTS AND TOOLS TILE FLANGE INSTALLATION MOLDED TILE FLANGE INSTALLATION A 1 24 Level A 2 24 Square A 3 Caulking gun A 4 Pencil A 5 Hole saw A 6 1 16 drill bit SKIRT INSTALLATION OTHER NECESSARY ITEMS See skirt section Wood shims Silicone A 3 A ...

Page 6: ...ath can support 1 500 lbs 680 kg The bath may sit directly on the floor However the bath may also be installed on a bed of concrete For this type of installation it is recommended that you insulate the concrete between two sheets of plastic one on floor and the other underneath bath A service access is necessary Minimum dimensions are 22 x 18 55 cm x 46 cm to properly reach all electrical componen...

Page 7: ...d with an integrated slope towards the drain If decking around the Thermomasseur is level the bath will drain accordingly 1 ALCOVE INSTALLATION BETWEEN 2 OR 3 WALLS Install to permit access for servicing The following instructions apply to both rectangular and corner baths 1 2 1 1 1 1 Place level lengthwise on decking of the ThermoMasseur and adjust by placing shims under ThermoMasseur where neces...

Page 8: ...d under the deck 1 6 To finish the front of the bath with ceramic tile or other materials a 2 x 3 5 cm x 7 6 cm structure is necessary to support the ThermoMasseur Place underneath the deck A or the edge of the bath B depending on the desired finish 1 7 BainUltra skirt installation requires a single 2 x 3 5 cm x 7 6 cm support in the front of the ThermoMasseur Tilt the base of the support 3 7 6 cm...

Page 9: ...e factory installed Molded tile flange secure the flange to the wall while supporting from beneath Factory or customer installed tile flange No tile flange TILE FLANGE 2 TILE FLANGE INSTALLATION IMPORTANT A factory installed tile flange does not replace a silicone joint between tiling and the Thermomasseur The surfaces that come into contact with double sided tape must be clean 2 1 Using a miter b...

Page 10: ...rilling may be necessary to install faucets This drilling of acrylic is a very delicate operation DRILLING ACRYLIC FOR FAUCETS 1 DRILLING 1 1 Drill a 1 16 guide hole before using the hole saw 1 2 Use a hole saw in good condition to avoid accidental scratches The center guide bit should extend 1 4 0 6 cm for correct drill positioning 1 4 0 6 cm 1 2 1 1 1 16 IMPORTANT Do not remove the protective pl...

Page 11: ...ON See specification sheet of bath for exceptions 1 1 Prepare the site to connect the plumbing and turbine 1 2 Build the 2 x 3 wooden structure taking into account the thickness of the ceramic tiles and the plywood as well as the height of the bath NOTE Plan air intake for turbine 1 3 Secure plywood into place with screws around and above structure 1 4 Cut inside 1 1 2 of the outside dimensions of...

Page 12: ... as well as the height of the bath NOTE Plan air intake for turbine 1 3 Ensure bath is levelled NOTE Protect turbine as you insert bath 1 4 Conduct plumbing and turbine connection 1 5 Enclose contour of podium using plywood NOTE Plan air intake for turbine 1 6 Install desired finishing materials ceramic tiles granit marble or other and top surface and siding of podium 1 7 Apply seal to junction of...

Page 13: ... in this section apply Amma freestanding models Refer to Thermomasseur instructions for the installation of Amma drop in models BALNEO AMMA ORIGAMI FREESTANDING PARTS AND TOOLS BALNEO AMMA ORIGAMI FREESTANDING PARTS AND TOOLS A PARTS INCLUDED A 1 Pipe concealer Cella model A 2 Screws and washers Cella and Amma models A 3 Floor anchoring Naos and Sanos A 4 Template Amma models B TOOLS REQUIRED B 1 ...

Page 14: ...grated slope towards the drain If floor is level the bath will drain accordingly The Amma model requires a 12 x 9 30 5 cm x 22 9 cm recess for the drain Refer to the bath template for the locations of water supply electrical connection and control cable and remote air supply if applicable For models in the Balneo series the turbine is not installed on the ThermoMasseur Determine a suitable place c...

Page 15: ...rtightness 2 2 Position the bath aligning anchor holes with anchor screw entry points 2 3 Connect bath drain and water supply and complete electrical wiring 2 4 Once the bath is in place and all connections completed secure bath in place using washers and screws supplied 2 5 Install base 2 3 1 1 1 2 2 4 1 1 Once floor is prepared and level and recess is cleared around the drain place installation ...

Page 16: ... according to specifications outlined in the MIAMULTI ELECTRICAL INSTALLATION TURBINE section LEAK TEST ELECTRICITY BALNEO NAOS SANOS INSTALLATION 1 BATH SITE 1 1 Once the floor has been finished and is perfectly level place ThermoMasseur in the exact chosen location Trace the outline of the bath with an erasable marker 1 2 Remove the ThermoMasseur and carefully place it upside down on a blanket o...

Page 17: ... four feet with screws and washers provided A 2 IMPORTANT Do not remove the protective plastic film from the bath and place a drop cloth in the Thermomasseur during installation to protect the acrylic The Thermomasseur must be secured to the floor 2 3 4 7 cm 5 1 2 14 cm 2 1 2 1 Cella Cella 6036 Cella Cella 6036 1 1 Once the floor has been finished and is perfectly level determine the exact locatio...

Page 18: ...erflow A 4 Access panel A 5 Access panel hinge B TOOLS REQUIRED B 1 48 inch level The Origami Freestanding Design Series requires a 12 x 10 30 cm X 25 cm compartment for the drain distance air inlet and if applicable space for control cables and options Refer to the instal lation template ACCESS AND AIR INLET For this model the turbine is not installed on the bathtub Determine a location near the ...

Page 19: ...complete when the bathtub rests on its side Place a cover or protective cardboard on the floor before positioning the bathtub on its side 2 2 Apply a joint of silicone under the edge of the base of the bathtub 2 3 Install the bathtub on the anchor points fastened to the floor and immediately wipe away any excess silicone Connect the drain 2 4 Install the turbine according to the instructions in th...

Page 20: ...r product as required The dimensions needed for site preparation and structure building will differ BainUltra assumes no responsibility for preparatory work done prior to the product being on site WARRANTY Turbine Some restrictions may apply www bainultra com warranty MOTOR AIR HEATER Power 700 W 5 8 A Operating cost 0 027 HR for 0 045 KWh Weight 5 5 lbs Motor power Panasonic 0 8 HP 120 V 600 W 5 ...

Page 21: ...ctor equivalent in size to the circuit conductors supplying the equipment and be 12 AWG or more INSTALL THIS UNIT IN ACCORDANCE WITH THE CANADIAN ELECTRICAL CODE PART 1 A service access is necessary Minimum dimensions are 22 x 18 55cm x 46cm to properly reach all electrical components of the system GROUNDING ACCESS CONNECTIONS PLUMBING The modules of the electronic controls and the turbine must be...

Page 22: ...ocal provincial state and federal building electrical codes and regulations Connect electrical power supply only after all low voltage wiring is properly installed on turbine If you did not follow this last step shut off and then restart your home s circuit breaker Turbine and air pipe should be clear of building materials and wiring Note Connections may differ depending on the bath model and opti...

Page 23: ... protected by patents TUR BIN E TURBINE ELECTRICAL INSTALLATION ELECTRICAL DIAGRAM TURBINE GEYSAIR with AROMACLOUD Electrical connections for Canada only 15A CIRCUIT 20A CIRCUIT NEUTRAL N L LOAD NEUTRAL N L LOAD GROUND FAULT CIRCUIT INTERRUPTERS JUNCTION BOX AIRSTREME HEATED BACKREST HEADREST TURBINE GEYSAIR FOR MIA MIAPLUS MIAMULTI INMIX MODULE CHROMATHERAPY AROMACLOUD N L N L N L N L TURBINE WIT...

Page 24: ...ary for proper air circulation Ambient air temperature should be between 72 F 20 C and 86 F 30 C Easy access to system must remain possible at all times for servicing Turbine may be relocated in either a vertical or a horizontal position Use only 1 1 2 3 8 cm ABS or PVC non flexible pipes and adaptors to extend air line the use of flexible pipes is not recommended except when factory installed Whe...

Page 25: ...fitting B TO REINSTALL TURBINE B 1 Mount turbine to wall or wall structure by inserting 1 2 5 cm screws in mounting holes B 2 Use as many 1 1 2 4 cm ABS or PVC pipes as necessary to connect turbine to bath Follow all relocation instructions provided in installation manual To reduce vibrations avoid having air line pipes touch home structure B 3 Secure pipe at air output of turbine by drilling a 1 ...

Page 26: ...ith BainUltra installation instructions and the bath bottom is flush with the floor Depending on wall finish you may need to size the panels and toe kicks When installation instructions of specific skirt model mention sizing of acrylic parts if such sizing is necessary follow these steps A plastic film peel coat protects the acrylic parts It is best to leave this film in place while working Only r...

Page 27: ...IRER LA TURBINE DE SES SUPPORTS ACTUELS A NECESSARY TOOLS AND PARTS REQUIRED NOT INCLUDED A 5 A 7 A 8 A 1 A 2 A 6 A 3 A 4 A 9 A 10 FOR ALL MODELS A 1 Measuring tape A 2 Screwdriver Silicone FOR TRIMMING IF NEEDED A 3 Adhesive tape A 4 Jigsaw and finishing blade SJ 3 AMMA 6060 A 5 Drill depending on the installation A 6 Eight 8 screws A 7 7 16 wrench A 8 7 16 ratchet SJ 1 MODEL A 5 Drill depending ...

Page 28: ...iner clips 1 6 1 2 1 27 cm wooden blocks 1 7 1 4 20 x 1 hex head bolts 1 8 1 4 20 x 1 3 4 hex head bolts 1 9 8 x1 2 screws NOTE If wooden blocks are already installed on bath see step 2 3 2 1 Using builder s glue or epoxy glue the two wooden blocks 1 6 at 1 4 0 6 cm from the ledge of the bath and at 12 30 5 cm from each side of the center NOTE The blocks at both ends are factory installed 2 2 Inst...

Page 29: ...re 2 3 trace a parallel line under the bath and mark a horizontal line 17 43 2 cm from the upper ledge of the bath Repeat step for other side 2 5 Position toe kick 1 4 behind the parallel traced lines and secure into place using four screws NOTE Trim toe kick as needed 2 6 Rest the base of the left wall finishing strip 1 2 in front of the toe kick and align to be parallel with the previously trace...

Page 30: ...etainer clips 2 9 Center skirt and with a pencil mark the location of the center of the factory drilled holes on the toe kick 2 10 Remove skirt and position lower anchorage 1 7 on the toe kick at the center of the marks made in previous step and secure into place by tightening the hex head bolts 1 8 Do not over tighten 2 11 Reposition skirt by reusing the shims and secure into place by using the h...

Page 31: ...etainer clips 1 3 8 x 1 2 screws 1 4 Wood blocks if necessary NOTE Parts may vary depending on bath model NOTE If wood blocks are already installed on the bath go to step 2 2 2 1 Glue wood blocks 1 4 0 6 cm from bath rim with epoxy or construction glue Position blocks according to bath model 1 1 2x 2x 2x 1 2 1 3 1 4 16 xx cm B B A 16 xx cm 20 xx cm A B 60 152 4 cm 16 40 6 cm 66 167 6 cm 16 40 6 cm...

Page 32: ... 4 1 9 cm 2 4 2 2 Holding a level against the side of the bath mark a guideline on both walls 2 3 Trace a line on the floor to connect both lines 2 4 Install the retainer clips on the wood blocks and secure in place with 8 x 1 2 screws 2 5 Fasten two wood blocks to the floor 14 35 6 cm from the center of the bath Space them 2 1 2 6 4 cm from the floor guideline 2 6 Insert top of panel between the ...

Page 33: ... blocks 1 4 0 6 cm from bath rim with epoxy or construction glue Position blocks according to bath model 2 2 Follow step 2 2 in the SJ 1 skirt section 2 3 Place finishing strip under the bath rim and align it with the level line on the wall Leave around 3 16 0 5 cm of space between the bath and the curved end of the strip 2 4 Fasten strip with two screws in the holes provided Repeat for the other ...

Page 34: ...s on the wood blocks and secure in place with 8 x 1 2 screws 2 8 Insert top of panel between the bath rim and retainer clips Position base of panel against toe kick 2 9 Raise panel and adjust height using wood blocks Trace a line on the toe kick at the four screw holes to indicate panel height Remove panel 2 10 Position skirt brackets as horizontally as possible on toe kick aligning the bottom of ...

Page 35: ...11 27 9 cm 11 27 9 cm 34 86 3 cm 34 86 3 cm 9 22 8 cm 9 22 8 cm 27 68 6 cm 27 68 6 cm SENSATION 1 4 0 6 cm 16 xx cm 16 xx cm 60 xx cm B B A 16 xx cm 16 xx cm 66 xx cm 20 xx cm 20 xx cm 72 xx cm 2 1 1 1 Left panel 1 2 Center panel 1 3 Right panel 1 4 Left toe kick 1 5 Center toe kick 1 6 Right toe kick 1 7 Retainer clips 1 8 8 x 1 2 screws 1 9 Wood blocks if necessary NOTE If wood blocks are alread...

Page 36: ...oe kick will be 2 4 Join the second set of dashes together This will reproduce the bath s curve 2 5 Mark the center of this curve 2 6 Position center toe kick just behind the curved line and center it by aligning the notch under it with the guideline on the floor 2 7 Screw center toe kick to floor starting with the two screws in the middle NOTE You may have to bend the toe kick slightly to match t...

Page 37: ... brackets on toe kick and adjust screws so that brackets are vertical 2 12 Adjust panel height leaving 1 4 0 6 cm between the edge of the bath and the curved panel top 2 13 Ensure brackets are well seated on toe kick and tighten wing nut as much as possible 2 14 Remove panel and follow steps 2 10 to 2 13 for the left panel 2 15 Remove left panel and repeat steps 2 10 to 2 13 with the center panel ...

Page 38: ... kick 1 7 Acrylic footing 1 8 Wood insert 1 9 Upper bracket 1 10 Lower bracket 1 11 5 32 Allen key 1 12 Cutting template 1 13 Round head Allen screw 1 14 No 8 x 1 2 screws 1 15 No 8 x 2 1 2 screws and washers Parts 1 7 1 8 and 1 15 are only included for skirts ordered with the step 2 1 Screw upper brackets into factory installed wood blocks Brackets must be flush with the bath edge 2 2 Follow step...

Page 39: ...oles on the center panel using Allen screws NOTE Do not tighten Final tightening is done in the next step 2 7 Hook the center panel lower bracket on the center toe kick Push panel against the upper bracket and slide under bath rim 2 8 Tighten Allen screw on each lower bracket to leave 3 16 0 5 cm of space as shown in the illustration 2 9 Repeat steps 2 6 to 2 8 for the left and right panels 2 10 L...

Page 40: ...pplications or are protected by patents SKIRTS MERIDIAN DUO INSTALLATION 1 INCLUDED PARTS 2 INSTALLATION 1 1 Meridian Duo bath 1 2 Meridian Duo skirt 2 1 Insert upper part of skirt with top hooks holding the upper part of bath frame 2 2 Lower skirt in order for hooks to rest against lower part of bath frame Adjust the height of skirt by raising or lowering the lower hooks and securing them into pl...

Page 41: ...electric component always check under the deck before drilling If you have to install the control to the wall remove the protective film of sticker behind the control You can add a silicone bead to secure it Refer to the drilling template on the last page for the location and diameter of the holes LOCATION DRILLING INSTALLING THE TOUCHPAD REQUIRED TOOLS 1 Push wiring through drilled holes 2 Remove...

Page 42: ...fault pressure is set to 60 Increase or decrease the pressure of the air jets by repeatedly pressing the or keys until the desired intensity is reached This function completely drains the conduits and dries them for 90 seconds regardless of whether or not the system was activated By eliminating any water left in the conduits the Drying cycle ensures perfect hygiene No stagnant water No water left ...

Page 43: ...ifferent users Personalize drying cycle for water jet conduits Lock controls when bath is not in use Adjust screen contrast Select display language MAIN FUNCTIONS KEYS AND FUNCTIONS Press this key to start or to stop the turbine and the MiaPlus control panel Press this key to return to function adjustment The Massage function appears on the screen by default Press either of these keys to navigate ...

Page 44: ...IGHT OPTIONS This function allows the user to regulate air jet pressure for personalized comfort and a remarkably effective Hydro thermo massage The default pres sure is the same for the previous bath Increase or decrease the pressure of the air jets by repeatedly pressing the or key until the desired pressure is reached Pressure increases in 10 increments Pressing is optional This function lets y...

Page 45: ... Press to validate your choice Use the arrows or or the key to return to the basic Massage screen BACKREST For maximum relaxation and exceptional comfort one or two heated backrests can be installed in your bath and heated individually Select the Backrest function by pressing the key until the Backrest function is displayed Four options are available Off Low Medium High NOTE Models with 2 backrest...

Page 46: ...y cycles from 10 to maximum desired intensity Bather 1 2 3 4 Stores each bather s selection Use the or keys to select an option Press to validate your choice Use the arrows or or the key to return to the basic Massage screen The MiaPlus control system lets you save up to four personalized presets This save function lets you conveniently preselect settings adapted to various users or purposes Simpl...

Page 47: ... mandatory after a Hydro thermo massage session Two options are available Daily After Bath Even when the daily drying cycle is programmed the automatic drying cycle will activate after each use Select After Bath The After Bath option lets you program the Drying cycle to start up to 60 minutes after a bath To select the After Bath option press the key on the menu until the Drying cycle function app...

Page 48: ...Hydro thermo massage session To select the Daily option press the key on the menu until the Drying cycle option appears Use the and keys to select the Daily option Press Start Time is displayed Use the or keys to select the time of day the Drying cycle function should start Press Current Time is displayed Press and hold the or keys or press them repeatedly to set the preprogrammed current time in ...

Page 49: ...nction Press the key on the menu until the Lock function appears Use the or keys to select the Activate option Press to validate your choice When you stop the bath the Lock function locks the key making it impossible to restart the turbine To restart the turbine when the Lock function is activated Press the key Lock is displayed Press The turbine starts To deactivate the Lock function Press the ke...

Page 50: ...ACT US NOTE The screen automatically dims after 2 minutes To set display screen contrast press the or key on the menu until the Contrast function appears NOTE Use the key to access this function more quickly when you start the turbine Press or until the desired percentage of contrast is displayed Press to validate your choice Use the arrows or or the key to return to the basic Massage screen The M...

Page 51: ...ficiently the remote must be pointed toward the MiaMulti wall mounted control in the room where your bath is 1 Key Operates the remote 2 Backrest 1 key Increases the temperature of backrest 1 3 Backrest 1 key Decreases the temperature of backrest 1 4 Backrest 2 key Increases the temperature of backrest 2 5 Backrest 2 key Decreases the temperature of backrest 2 6 Blower key Increases air jet pressu...

Page 52: ...IAMULTI USER GUIDE NOTE To work efficiently the remote must be pointed toward the MiaMulti wall mounted control in the room where your bath is BATH BAIN BATH BAIN BATH BAIN Red light PROGRAMMING MIAMULTI BATH Press key BATH BAIN Press key MINUS and keep it pushed Press key POWER and keep both keys pushed for 2 seconds Once red light is switched on release both keys Immediately press keys sequence ...

Page 53: ...ducts such as powder paint thinners terpentine and gas can damage the shine and lustre of the acrylic For particularly tough stains use a small amount of wood alcohol methyl hydrate Safety instructions When applying wood alcohol methyl hydrate use gloves to protect hands Rince thoroughly after use Ensure that essential oils or other therapeutic products added to bath water will not damage the acry...

Page 54: ...YSTEM Maintenance For slightly deeper scratches sand the spot with a wet sandpaper before polishing Depth of abrasion or scratch will determine grade of sandpaper required Slight to moderate damage grade 600 800 then 1200 sandpaper Deeper damage grade 400 600 800 then 1200 sandpaper When sanding start with lowest grade sandpaper e g 400 working your way up as you sand a slightly larger area with e...

Page 55: ...ected to circuit Check for a short circuit between bath and breaker box Breaker may too sensitive defective or old Try a new breaker This component must be new Turbine and air heater are equipped with heat sensors designed to cut off power in case of overheating Insufficient air circulation may be the cause Make sure turbine has sufficient ventilation Make sure turbine intake is not obstructed To ...

Page 56: ...eated backrest or backrests should be warm to the touch and jets should also seem warm when you bring your hands close to them Check the turbine air intake It should not be too cold nor too warm Ideally the temperature should be between 72 F 20 C and 86 F 30 C Check that distance between turbine and bath is not too great If possible insulate air line along its entire length See turbine installatio...

Page 57: ...mpted by anyone other than BainUltra an authorized BainUltra dealer or other representative of BainUltra or iii the unit is installed outdoors or has not been installed in accor dance with BainUltra s instructions or in compliance with local codes and ordinances Because of their organic nature wood components will expand and contract with seasonal changes and normal heating variations With time no...

Page 58: ......

Page 59: ...vices mentioned in this manual are described in pending patent applications or are protected by patents DRILLING TEMPLATES MIA DRILLING TEMPLATES 4 094 0 04 5 125 13 0 cm 0 438 1 1 cm 3 938 0 04 10 0 cm 0 1 cm 10 4 cm 0 1 cm 1 094 0 04 2 8 cm 0 1 cm 1 688 4 3 cm Hole Contour Control Contour Drawing of Mia Control hole IMPORTANT Drawing is to scale MIA DRILLING TEMPLATES ...

Page 60: ......

Page 61: ...NG TEMPLATES MIAPLUS MIAMULTI DRILLING TEMPLATES 5 125 0 04 13 0 cm 0 1 cm 1 625 0 04 4 1 cm 0 1 cm 5 591 14 2 cm R 250 TYP 4 R 0 6 cm 2 165 5 5 cm Hole Contour Control Contour 0 875 2 2 cm 1 3 5 cm 375 R 0 125 R 0 3 cm 1 2 9 cm 125 1 4 1 cm 625 Drawing of IR hole for MiaMulti IMPORTANT Drawing is to scale Drawing of MiaPlus and MiaMulti control hole same template IR could be installed at arms rea...

Page 62: ......

Reviews: