background image

Bandit 240 PB Installation and User

Guide

©2006 All rights reserved
Bandit Solutions, Inc.

Distributed by:
Detection Dynamics, Inc.
6606 N. Lamar Blvd., Suite 300
Austin, Texas 78752
(512) 453-1133

  

  

www.cctvpros.com

Summary of Contents for 240 PB

Page 1: ...andit 240 PB Installation and User Guide 2006 All rights reserved Bandit Solutions Inc Distributed by Detection Dynamics Inc 6606 N Lamar Blvd Suite 300 Austin Texas 78752 512 453 1133 www cctvpros co...

Page 2: ...PB open the shipping box and verify you have received the following items Bandit 240 PB Hypak 3 Allen wrench Bandit software disk Optional hardware you may have ordered such as mounting kits Complianc...

Page 3: ...rance from walls and ceiling as indicated in the following diagram This ensures enough room for heat dissipation and routine maintenance For wall mounting a 5 15 inclination from vertical Mount in a l...

Page 4: ...t surface to block the ejection is 20 feet 6 meters away When installing multiple nozzles position the nozzles so they expel fog in a manner that avoids double clouding of the same area Suggested poin...

Page 5: ...on page 3 2 If you ordered the optional Handy Boy jig place Bandit 240 PB on the jig 3 Connect power wires to Bandit 4 On the floor mark and drill holes to depth 5 Attach the mounting plate using scr...

Page 6: ...oceed to Electrical Connection Electrical Connection Caution Installation of Bandit 240 PBrequires a 110 VAC power source and a dedicated ground Be sure you follow all local safety requirements and bu...

Page 7: ...and the white wire to Grdout See Figure 1 3 If required connect the blue and black wires to the Ta and Tb sabotage loop LEDs The following table lists the LEDs on Bandit s front cover and their corre...

Page 8: ...r or contact Technical Support Maintenance Testing fog ejection Perform a fog ejection test once a year To perform the test push the test button on the Control Box see figure to right Caution Notify a...

Page 9: ...ons Characteristic Value Dimensions 10 6 wide 14 4 high 10 deep Weight 62 pounds Max mains supply failure 2 hours Maximum reaction time 1 second between alarm signal and fog ejection Fog ejection imag...

Page 10: ...oubleshooting and Technical Support Leave all repairs to authorized persons and or the manufacturer For technical support contact your distributor Detection Dynamics Inc 6606 N Lamar Blvd Suite 300 Au...

Reviews: