background image

Datasheet

Configurable DX80 Gateway that uses DIP switches to map inputs from up to six Nodes (or Wireless Q45 Sensors) to the

Gateway's outputs

DX80...C Model

DX80 Model

The Sure Cross

®

 wireless system is a radio frequency network with integrated I/O that operates

in most environments and eliminates the need for wiring runs. Systems are built around a

Gateway, which acts as the wireless network master device, and one or more Wireless Q45

Sensors.

Wireless industrial I/O device with six discrete (sourcing) inputs and six discrete

(sourcing) outputs

DIP switches allow the user to select one of eight defined I/O mapping configurations to

automatically map the Nodes' inputs to this Gateway's outputs

Frequency Hopping Spread Spectrum (FHSS) technology ensures reliable data delivery

within the unlicensed Industrial, Scientific, and Medical (ISM) band

Transceivers provide bidirectional communication between the Gateway and Node,

including fully acknowledged data transmission

Site Survey analyzes the network’s signal strength and reliability and displays the results

on the Gateway's LCD

LCD shows I/O status, Site Survey results, and network status information

Lost RF links are detected and relevant outputs set to user-defined conditions

For additional information, updated documentation, and a list of accessories, refer to Banner Engineering's website, 

www.bannerengineering.com

.

WARNING:

Do not use this device for personnel protection

Using this device for personnel protection could result in serious injury or death.

This device does not include the self-checking redundant circuitry necessary to allow its use in
personnel safety applications. A device failure or malfunction can cause either an energized (on) or de-
energized (off) output condition.

Models

Model

Frequency

Environmental Rating

I/O

DX80G2M6-Q

2.4 GHz ISM Band

IP67, NEMA 6

Inputs: Six sourcing discrete
Outputs: Six sourcing discrete

DX80G2M6-QC

IP20, NEMA 1

Configure and Install Your Q45 Network

Follow these steps to set up and install your Wireless Q45 network.

1. On the Wireless Q45 Sensor Node:

a) Configure the DIP switches (if applicable).
b) Apply power.

2. On the Gateway or DXM:

a) Configure the DIP switches (if applicable).
b) Wire the I/O.
c) Apply power.

3. Bind the Q45 to the master radio.
4. Observe the LED behavior to verify the devices are communicating to each other.
5. Using the configuration software, configure the I/O mapping between the Q45 and its master radio.
6. Conduct a Site Survey between the Gateway and the Wireless Q45.
7. Install your devices.

Configure the Gateway

Sure Cross

®

 DX80 Gateway for Wireless Q45

Sensors

 

 

Original Document

161862 Rev. E

3 December 2020

161862

Summary of Contents for Sure Cross DX80

Page 1: ...ned conditions For additional information updated documentation and a list of accessories refer to Banner Engineering s website www bannerengineering com WARNING Do not use this device for personnel p...

Page 2: ...red mode use the User Configuration Software or a Modbus command to change the device parameters DIP switch positions 3 through 8 are ignored In DIP Switch Configured mode use the DIP switches to conf...

Page 3: ...loss Q45 1 Gateway OUT 1 Link loss alarm for Q45 1 Gateway OUT 2 Q45 2 Gateway OUT 3 Link loss alarm for Q45 2 Gateway OUT 4 Q45 3 Gateway OUT 5 Link loss alarm for Q45 3 Gateway OUT 6 Three Wireless...

Page 4: ...6 Node 2 OUT 3 Three Nodes to One Gateway DIP Switches 6 ON 7 ON 8 OFF Gateway Node 01 Node 02 Node 03 Three SureCross DX80 Nodes each with 2 inputs and 2 outputs Node 1 IN 1 Gateway OUT 1 Gateway IN...

Page 5: ...PWR 10 30V dc Load dc common Modbus Register Table for the Gateway with Switch Based Mapping I O Modbus Holding Register Gateway I O Type I O Range Holding Register Representation Terminal Block Labe...

Page 6: ...23 Node 22 Node 21 Node 20 Node 19 Node 18 Node 17 Node 16 6693 Node 47 Node 46 Node 45 Node 44 Node 43 Node 42 Node 41 Node 40 Node 39 Node 38 Node 37 Node 36 Node 35 Node 34 Node 33 Node 32 Inputs O...

Page 7: ...it For example to assign your DX80 to Node 10 set the Gateway s left dial to 1 and the right dial to 0 Valid Node addresses are 01 through 47 3 On the Q45 Loosen the clamp plate on the top of the DX80...

Page 8: ...o conduct a Site Survey with another Node and repeat steps 2 through 6 8 To end the Site Survey double click the Gateway s button 2 9 Change the Gateway s rotary dials back to 0 The LCD displays the d...

Page 9: ...Greater than 8 V OFF Condition PNP Less than 5 V Discrete Outputs Update Rate 125 milliseconds ON Condition Supply minus 2 V OFF Condition Less than 2 V Output State Following Timeout OFF Discrete Ou...

Page 10: ...y product of its manufacture which at the time it is returned to the factory is found to have been defective during the warranty period This warranty does not cover damage or liability for misuse abus...

Reviews: