background image

Thor

User manual

R5906787/02
26/01/2018

Summary of Contents for Thor

Page 1: ...Thor User manual R5906787 02 26 01 2018...

Page 2: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium Phone 32 56 36 82 11 Fax 32 56 36 883 86 Support www barco com en support Visit us at the web www barco com Printed in Belgium...

Page 3: ...32 In a residential environment this equipment may cause radio interfer ence Guarantee and Compensation Barco provides a guarantee relating to perfect manufacturing as part of the legally stipulated...

Page 4: ...xclusively limited to replacement of the product or refund of purchase price GNU GPL code If you would like a copy of the GPL source code contained in this product shipped to you on CD please contact...

Page 5: ...ts 35 5 5 ICMP DisplayPort specifications 36 5 6 ICMP SDI specifications 38 5 7 ICMP HDMI 2 0 specifications 41 5 8 ICMP HDMI 1 4 specifications 44 5 9 ICMP status LEDs 46 5 10 ICMP HDD status LEDs 47...

Page 6: ...Table of contents 2 R5906787 THOR 26 01 2018...

Page 7: ...the necessary time to page through this manual We believe everyone will benefit from this manual Not in the least our editors who will sleep more comfortably knowing their efforts have had their effec...

Page 8: ...1 Welcome 4 R5906787 THOR 26 01 2018...

Page 9: ...precisely All local installation codes should be adhered to Notice on safety This equipment is built in accordance with the requirements of the international safety standards IEC60950 1 EN60950 1 UL6...

Page 10: ...zone Restricted access location To protect untrained persons and children the projector must be installed in a restricted access location The definition of a restricted access location is a location...

Page 11: ...le or combustible materials near the projector Barco large screen projection products are designed and manufactured to meet the most stringent safety regulations This projector radiates heat on its ex...

Page 12: ...ed substitu tions may result in degraded performance and reliability fire electric shock or other hazards Unauthorized substitutions may void warranty Safety check Upon completion of any service or re...

Page 13: ...or manual Rated maximum ambient temperature ta 30 C 86 F Safety Data Sheets for Hazardous Chemicals For safe handling information on chemical products consult the Safety Data Sheet SDS SDSs are availa...

Page 14: ...let for removal of all power from the unit WARNING HIGH LEAKAGE CURRENT EARTH CONNECTION ESSENTIAL BEFORE CONNECTING SUPPLY SEE INSTALLATION INSTRUCTIONS BEFORE CONNECTING TO THE SUPPLY D connecter l...

Page 15: ...n Installation method separation height barriers detection system or other applicable control measure shall prevent hazardous eye access to the radiation within the hazard distance For example project...

Page 16: ...orporation of the RG3 LIPs into their shows Dealers and distributors are also required to obtain a valid laser light show variance This product shall be located in such a way that all propagating beam...

Page 17: ...ving the diffuse surface of the rear projection screen As described in High Brightness precautions Hazard Distance HD page 11 it is mandatory to create a restricted zone within the beam areas closer t...

Page 18: ...f modifying optics Hazard Distance 0 1 2 3 4 5 6 1 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 3 1 3 2 3 3 3 4 3 5 3 6 3 7 3 8 3 9 4 Hazard Distance HD m Throw Ratio TH...

Page 19: ...ulated e g removed and installed in a projector it needs to be homed and returned Overview Available lenses Lens selection Lens installation Lens removal Lens shift zoom focus 3 1 Available lenses Whi...

Page 20: ...website on www barco com and click on myBarco 2 Login on If you are not yet registered create a login and password With the created login and password it is possible to enter myBarco When your login...

Page 21: ...ls that use the lens at one of its extreme zoom positions this should be taken into account 3 3 Lens installation If no lens is installed the lasers of the Thor series projector can not be powered The...

Page 22: ...Lens Holder front plate An audible click should be noticed Once seated there may be no airgap between lens flange and Lens Holder front plate Caution Ensure that the lock handle remains in the locked...

Page 23: ...der 1 Support the lens with one hand while you unlock the lens holder by sliding the lock handle reference 1 image 3 5 towards the unlocked position as illustrated 2 Gently pull the lens out of the le...

Page 24: ...t s mechanical possible to shift outside the recommended field of view but this will result in a decline of image quality depending on the used lens and the zoom position of the used lens Furthermore...

Page 25: ...h indicates that the button is enabled PURPLE When pushing the Shift Zoom or Focus button the backlight color is purple of the part of the button that is pushed This indicates that the requested actio...

Page 26: ...3 Lenses Lens selection 22 R5906787 THOR 26 01 2018...

Page 27: ...s located on the top side of the projector The projector card cage is equipped with an ICMP See illustration below Note that all information about the ICMP is gathered into one separated chapter ICMP...

Page 28: ...dby mode the total power consumption of the projector is less than 15W All electronics are switched of including PSUs for the lasers except for Cinema Controller board and Local Keypad Only the follow...

Page 29: ...f the CONDITIONING process After six seconds the status light will light up continuously Blinking green Ongoing CONDITIONING process Lasers are tested Continuous green Sealed compartments are fully CO...

Page 30: ...process 5 Light button Light button reference 5 image 4 4 switches the lasers ON or OFF Pushing the Light button reference 5 image 4 4 for 3 seconds will activate or deactivate the lasers of the proj...

Page 31: ...4 5 Functionality 1 Diagnostic LEDs The front plate of the Cinema Controller contains 4 diagnostic LEDs to display the status of the power supply reference 1 image 4 5 VTEC supply 24V supply 12V supp...

Page 32: ...eaming As there is a need to daisy chain projectors when they are on an Ethernet network an Ethernet switch is built in the incoming network is hereby available for the internal PC and for the next de...

Page 33: ...nd does not specify balanced control lines RS 232 is a serial control standard with a set number of conductors data rate word length and type of connector to be used The standard specifies com ponent...

Page 34: ...4 Input Communication 30 R5906787 THOR 26 01 2018...

Page 35: ...ration via Communicator ICMP reset Obtaining the Barco ICMP certificate Removing a HDD from the ICMP Installing a HDD into the ICMP 5 1 ICMP introduction About ICMP The ICMP is a removable electronic...

Page 36: ...ith two HDMI 2 0 as video source Image 5 3 Front face ICMP with HDMI 2 0 Some models with DisplayPorts and one HDMI 1 4 mezzanine are still present on the field Image 5 4 Front face ICMP with DisplayP...

Page 37: ...the failure of one disk it enters in degraded mode Content storage and playback remains available on the ICMP CAUTION The loss of one disk causes no serious consequences on the ICMP But action must b...

Page 38: ...n drive operation cycles is 30 days During any storage period the drive non operational temperature humidity wet bulb atmospheric conditions shock vibration magnetic and electrical field specification...

Page 39: ...tent The USB port can be used to load content DCP or keys KDM or software update NOTE These ports are recommended for fast ingest when connected to an appropriate USB 3 0 source USB Universal Serial B...

Page 40: ...such as a computer monitor though it can also be used to transmit audio USB and other forms of data VESA designed it to replace VGA DVI and FPD Link Backward compatibility to VGA and DVI by using act...

Page 41: ...1080 60 fps 8 bpc 10 bpc Single 3D 2048 x 1080 60 fps 8 bpc 10 bpc Single 3D 4K Horizontal SPAN 2D Full Color depth Port Display Mode 2048 x 2160 30 48 50 60 fps 8 bpc 10 bpc A B span 2D 4K Horizontal...

Page 42: ...structure for coaxial cable and have a vested interest in extending the life of their infrastructure For tunately SMPTE recently ratified a new standard called SMPTE 424M that doubles the SDI data rat...

Page 43: ...92M formats SMPTE Standard Source Resolution Frame Rate Display Rate Scan Type SMPTE 296M 1280 x 720 23 976 24 25 29 970 30 50 59 940 60 23 976 24 25 29 970 30 50 59 940 60 Progressive Y Cb Cr 4 2 2 1...

Page 44: ...standard HD SDI interfaces support the Y Cb Cr colorspace both legal and full range using 4 2 2 color subsampling The Dual Link HD SDI interface can be used to carry a single 4 4 4 image having a colo...

Page 45: ...lacement for existing analog video standards HDMI 2 0 specifications HDMI Both HDMI 2 0 inputs are fully compliant with the HDMI 1 4 1 4a 1 4b 2 0 and 2 0a revisions of the HDMI specification Full Ran...

Page 46: ...supporting Ethernet over HDMI and such specific cables are thus not required HDMI 2 0 Supported 2D Formats Format Frame Rate Color coding Bit depth 1280x720 23 976 24 25 29 97 30 50 59 94 60 RGB YCbC...

Page 47: ...Cr 4 4 4 YCbCr 4 2 2 8 HDMI 2 0 Supported Audio Formats Format Sample Rate Sample coding Bit depth 2 0 2 1 5 1 7 1 32 44 1 48 88 2 96 L PCM 16 20 24 HDMI 2 0 Supported Dual Twin Link Formats 2D format...

Page 48: ...I2 input port B should contain the pixel data for Right Eye 5 8 ICMP HDMI 1 4 specifications HDMI HDMI High Definition Multimedia Interface is a compact audio video interface for transferring uncompre...

Page 49: ...4 4 4 YCbCr 4 2 2 8 10 12 1920x1080 2048x1080 100 119 88 120 RGB YCbCr 4 4 4 YCbCr 4 2 2 8 2560x1080 23 976 24 25 29 97 30 50 59 94 60 RGB YCbCr 4 4 4 YCbCr 4 2 2 8 10 12 3840x2160 4096x2160 23 976 2...

Page 50: ...ats Format Frame Rate Color coding Bit depth 1280x720 50 59 94 60 1920x1080 23 98 24 HDMI 1 4 Supported Audio Formats Format Sample Rate Sample coding Bit depth 2 channels 32 44 48 88 96 L PCM 16 5 1...

Page 51: ...Green Starting Applications Green Green Applications started in normal mode Green Orange Applications started in degraded mode Blinking Red Off FIPS error Green Blinking Orange Update ongoing Orange O...

Page 52: ...approved models of the same storage capacity See procedure Removing a HDD from the ICMP page 52 and Installing a HDD into the ICMP page 53 Ensure to insert the HDDs firmly 3 Switch on the power 4 Sta...

Page 53: ...thority CA which issues digital certificates that authenticate the identity of or ganizations and individuals over a public system such as the Internet The certificates are also used to sign messages...

Page 54: ...ation via Communicator About ICMP configuration Following parameters are available to configure the ICMP Global settings allows defining name of the ICMP host name network identifier and IP address wh...

Page 55: ...ted to end After a few seconds the ICMP is requested to restart The READY LED on the front panel of the ICMP starts to blink orange In case the ICMP is installed in DP4K L series projector the lasers...

Page 56: ...rieve the ICMP certificate directly 96 92 35 86 40 1 2 Image 5 14 Using control software to obtain the ICMP certificate 1 Use the WEB Commander to download the ICMP certificate from the ICMP main boar...

Page 57: ...AUTION Always use a new empty spare part HDD approved by Barco to replace a malfunction HDD Do not use a HDD from another ICMP HDD set CAUTION Always make sure that all HDDs in the ICMP HDD set have t...

Page 58: ...5 20 5 Switch on the projector In case you replace one HDD e g degraded mode the ICMP automatically starts with the RAID recovery process The red LED of the HDD which has to be rebuilt is blinking Thi...

Page 59: ...er Keep in mind that it can take up to 10 minutes to start the lasers again after they were switched off If there are only 30 to 45 minutes between the shows it s advisable to keep the lasers on with...

Page 60: ...the Communicator Touch Panel to switch the projector from OPERATIONAL mode to STANDBY mode As a result the lasers are deactivated if activated and the projector starts to deconditioning the sealed com...

Page 61: ...s light is continuous green in normal condition no errors and no warnings The laser status light remains off In PRECONDITIONED mode the chillers are operational and the heat dissipation of the DMDs is...

Page 62: ...6 Starting up 58 R5906787 THOR 26 01 2018...

Page 63: ...jector 200 240 346 415V 50 60Hz 16A 3W N PE Y connection Power cord size range 4 sq mm to 6 sq mm 10AWG to 8AWG Circuit breaker range 25A to 40A 200 240V 3W PE 28A 50 60Hz delta connection Power cord...

Page 64: ...t accessible USB 2 0 Video and audio watermarking Civolution NexGuard Closed captioning devices Support for SMPTE 430 10 4K 24fps is standard For 4K 60 fps 4K 3D on ICMP upgrade modules a license is r...

Page 65: ...nce for Dual Projector TMS support Barco Alchemy is supported by the following Theater Management System TMS brands AAM Screenwriter Ymagis Melody CFG Barco Unique RosettaBridge ADDE Cin Digital Manag...

Page 66: ...ns of the Thor Dimensions 293 5 1446 859 1135 415 293 5 298 741 6 675 1211 33 3 117 5 33 3 117 5 EXIT DRAIN EXIT DRAIN PONT OF GRAVITY 707 5 246 5 325 675 112 Image A 1 Dimensions given in millimeters...

Page 67: ...A Specifications A 4 Technical Regulations Certificates Image A 2 EAC mark 10 Image A 3 Rohs Image A 4 CE mark Image A 5 ETL mark Image A 6 FCC label Image A 7 RCM mark R5906787 THOR 26 01 2018 63...

Page 68: ...A Specifications 64 R5906787 THOR 26 01 2018...

Page 69: ...which must be collected and disposed of separately from municipal waste If the battery contains more than the specified values of lead Pb mercury Hg or cadmium Cd these chemical symbols will appear be...

Page 70: ...homogeneous materials used for this part is above the limit requirement in GB T 26572 EIP EFUP Barco EFUP 10 All Electronic Information Products EIP that are sold within Chinese Mainland must comply w...

Page 71: ...ntage of reference value of presence 3 Note 3 The indicates that the restricted substance corresponds to the exemption B 4 Turkey RoHS compliance Turkey RoHS compliance T rkiye Cumhuriyeti AEEE Y netm...

Page 72: ...rco Factory No 16 Changsheng Road Changping District 102200 Beijing P R C 16 3 102200 Barco Visual Beijing Electronics Co Ltd No 16 Changsheng Road Changping District 102200 Beijing P R C 16 102200 Ma...

Page 73: ...Cinema Package DCP is a collection of digital files used to store and convey Digital Cinema DC audio image and data streams The term has been defined by Digital Cinema Initiatives DCI General practic...

Page 74: ...ontrol standard with a set number of conductors data rate word length and type of connector to be used The standard specifies component connection standards with regard to computer interface It is als...

Page 75: ...ard Distance 11 12 14 Modifying optics 14 Hazardous Chemicals 9 Hazards 67 HDD 33 34 52 53 About 33 Degrade mode 33 RAID broken 34 RAID recovery 33 Remove 52 53 Storage 34 Storage capacity 34 Validate...

Page 76: ...injury 8 Projector damage 8 Safety Data Sheet SDS 9 Servicing 8 Safety Data Sheet SDS 9 Safety training 6 SDI 38 Specifications 38 Serial communication 28 Shift 19 Source input 36 3G SDI 36 DisplayPor...

Reviews: