BATCO
Hitting Cage Assembly Instructions
Part Description
72’ Batting Cage 54’ Batting Cage
1
1
B. Framing –
Arc section with insert connection
5
4
C. Framing –
Arc section without insert
5
4
D. Framing –
Legs with insert connection
10
8
E. Outdoor Leg Feet
10
8
F. Outdoor Leg Stakes
20
16
G. Lynch Pins
10
8
H. Indoor Leg Boots
10
8
I. Adjustable End Straps
6
6
J. Eye Bolts
with nuts & washers
19
16
K. 18’
Top & Side Connecting Support Ropes
12
9
[ 72’ or 54’ ]
2
2
Tools Needed for Assembly
1.
Tape Measure
2.
Twelve Stakes (Outdoors) or Marking Pen (Indoors)
3.
9/16” Wrench
4.
Hammer or Maul (Outdoors)
5.
Step Ladder
6.
Razor Knife
Your cage comes complete with everything required
for an indoor or outdoor setup except end anchors.
For outdoor setup, first select a level piece of ground. Minimum space
requirements are 22’ x 92’ for the 72’ cage <and/or> 22’ x 74’ for the 54’ cage.
For an indoor set up and connecting to a wall or volleyball standard that can
be securely fastened to the floor, the end distance (distance from the last arc
frame to the end support) can be shortened from 10’. It is recommended that
the end support be at least 7’ off the ground or floor.
*** Read All Directions Carefully & View Video Tape
Instructions Before Beginning ***