background image

Installation and Technical Information

BEGA

Accessories

Please refer to the appropriate

accessory installation sheet for

further instruction when applicable.

In the interest of product improvement, BEGA reserves the right to make technical changes without notice.

BEGA  

1000 Bega Way, Carpinteria, CA 93013 (805)684-0533 Fax (805)566-9474 www.bega-us.com © Copyright BEGA-US 2017

Replacement Parts

Fig-1:

(5/16" - 18 x 10")

Bollard - trapezoidal with step baffle

99 558

Tools Required:

6mm hex key

1/2” nut driver

Phillips medium screwdriver

Protection Class: 

IP65

Weight:

  22 lbs.

Dimensions
A:

   9-7/8 ”

B:

   43-3/8 ”

C:

   5-1/2 ” 

Relamping/Maintenance

No relamping required.

99 558

12/1/2017

Page 1 of 2

Description

Faceplate

Driver (120-277V)

LED Module (3000K)

LED Module (4000K)

Part No

FP8534

75985-01

LED-0313/930

LED-0313/940

Anchorage 

 

79 817

Notice to Installer for 99 558:

1. Fixture may be damaged if connected to conduit systems that contain water - Article 300-5G of  

    the National Electric Code requires that “Conduits or raceways through which moisture may contact  

    energized live parts shall be sealed or plugged at either or both ends.”

2. 79 817 anchorage kit (included) must be installed in concrete pad/foundation.

3. It is recommended that when installing in planting areas the bollard base be slightly elevated to  

     

    avoid prolonged submerging during heavy rains.

4. Wet location listing does not imply suitability for exposure to standing water for long periods of time.

5. Integral LED driver supplied with luminaire.

6. LEDs are high-quality electronic components! Please avoid touching the light 

    output opening of the LED directly during installation.

79 817 anchorage installation:

1. Provide means to bring supply wiring to the bollard in accordance with local code.  The template has  

    a 2-3/8” conduit hole for conduit entry.

2. Assemble anchorage kit.  Unscrew the (3) hex bolts from the female couplers.  Remove each hex          

   bolt and washer.  Align each anchor bolt with the hole in the template.  Attach each anchor bolt to the    

   template by replacing the washer and hex bolt and tightening.

3. Determine the finished grade for the application.  Use leveling hardware to adjust template to  

    

    desired finished height after pouring.

4. Install anchorage kit using either method:

 

A. Attach template to forming or cross bracing using the (2) nail holes    

 

      

 

    provided in the template.  Level template properly.  Pour concrete.

 

B. Insert anchorage assembly into poured concrete.  Concrete must be  

 

 

 

    vibrated to ensure proper anchorage setting.  Level template properly. 

99 558 installation:

1. Remove (3) hex bolts and washers, once anchorage is set.

2. Remove template, making sure that there is a smooth, flat surface to mount the base.

3. Loosen the 5mm set screw at the base of the fixture.  Turn the base plate and remove from bollard.

4. Align base plate holes with anchorage holes.

5. Bolt the base plate to the anchorage kit using the (3) hex bolts and washers. 

6. Make supply wiring connections to wire leads from driver inside the fixture

 

MAIN VOLTAGE SUPPLY WIRE TO BLACK DRIVER WIRE; 

 

NEUTRAL (COMMON) SUPPLY WIRE TO WHITE DRIVER WIRE; 

 

GREEN GROUND WIRE TO GREE N DRIVER WIRE.

    Dimming (if applicable):

 

 DIMMING CONTROL WIRE (+) TO POSITIVE DRIVER DIM CONTROL WIRE

 

 DIMMING CONTROL WIRE (-) TO NEGATIVE DRIVER DIM CONTROL WIRE

7. Place the bollard over the base plate so that the (3) notches in the base plate align with the top.     

    Lock fixture into place by turning bollard 1/4” turn. 

8. Secure the bollard by tightening the 6mm set screw at the base.

Lamp:

   17.9W LED

Reviews: