background image

Summary of Contents for DO110

Page 1: ... Carbon Monoxide Detector When Using Any Product That Consumes Fossil Fuels THIS BOILER IS TO BE INSTALLED AS AN ADD ON UNIT TO A PRIMARY HEATING BOILER ONLY IT IS INTENDED TO BE INSTALLED ONLY WITHIN THE BUILDING THAT IT IS HEATING It is the responsibility of the person or company installingthis boiler to verify before the installation that the boiler certifications shown on this page meet or exc...

Page 2: ...ng trade The installationshould meet or exceed all local and national codes havingjurisdiction including C S A B365 the Installation Code for Solid Fuel Burning Appliances Equipment The boiler has been thoroughly tested with modern baseboard radiation UNDERFLOOR CAST IRON RADIATORS Special consideration must be taken when connecting the boiler to underfloor systems without oxygen barrier pipe or w...

Page 3: ... 1 Tridicator pressure temperature gauge INSTALLATION INSTRUCTIONS CLEARANCES Observe the minimum clearances to combustible materials Front 48 Smoke pipe 18 Rear 24 Side 1 24 Above 48 Side 2 6 The boiler may be placed on a combustible floor by using 9 32 noncombustible cover extending 18 in front 18 at the rear 6 on each side ELECTRICAL Wood Boiler Triple Aquastat Settings Oil Boiler Aquastat Sett...

Page 4: ... steel 24 ga or heavier Use as few turns as possible between the boiler and the chimney each 90 elbow adds 10 of restriction and a 45 elbow adds 5 of restriction The draft regulator set at 05 W C maximum Install the regulator a minimum of 18 and a maximum of 24 from the boiler breech Maintain a minimum of 1 2 rise per foot of pipe from the boiler to the chimney DO NOT run the pipe downhill from th...

Page 5: ...rative by a deliberate manual action Please ensure that the pressure relief valve and the boiler drain valve are piped to a safe drain water dischargingfrom either could be extremely hot and dangerous All piping will be such that excessive pressure will not be developed in any portion of the boiler or system DO110 DO180 WOOD FIRED BOILERS PARALLEL PIPING 1 NORMALLY CLOSED ZONE VALVE 2 NORMALLY OPE...

Page 6: ...s before reassembling Fire door gaskets and seals must be maintained in good condition for safe operation SPECIAL PROCEDURES ELECTRICAL POWER FAILURE PLEASE NOTE Consult withyour installer at the time of installation to verify how to operate your system without electricity 1 Maintain Va the normal fire load 2 The damper door must be manually operated DO NOT prop or tie open 3 Be careful when firin...

Page 7: ...ontrol NOTE If you are using the domestic coils from the boiler adjust the oil aquastat to LOW 18Cf F and HIGH 200 F for the summer months I Primary Circulator Blocked Flue Sensor Blac Low Limit set 15ffF B1 High Limit set 17CFF Blocked Flue Sensor W R Benjamin Products Limited Wiring schematic for DO110 180 Add on boiler MAY 2006 N C Z V Normally Closed Zone Valve N O Z V Normally Open Zone Valve...

Reviews: