background image

 

 

 

P A R T S   L I S T 

 

Item

 

Qty

 

Description

 

Item

 

Qty

 

Description

 

A

 

1

 

Extension Arm Assembly

 

J

 

8

 

5/16" Flange Nuts

 

B

 

2

 

4” 

Square U

-

Bolt

 

K

 

1

 

Pole Cap

 

C

 

4

 

1/2” 

Flat Washers

 

L

 

1

 

Acrylic Backboard (packaged separately)

 

D

 

4

 

1/2” 

Lock Washers

 

M

 

1

 

Acrylic Hardware (packaged with backboard)

 

E

 

4

 

1/2" Hex Nuts

 

N

 

1

 

Rim and Net (packaged separately)

 

F

 

2

 

Upper Backboard Supports

 

O

 

1

 

4" Square Pole (packaged separately)

 

G

 

2

 

Lower Backboard Supports

 

P

 

1

 

Pole Installation Aid Kit (inside the pole)

 

H

 

4

 

Backboard Mounting Angles

 

Q

 

TBD

 

Quick Dry concrete (provided by customer)

 

I

 

8

 

5/16" x 1" Hex Bolts

 

R

 

1

 

Pole Pad (packaged separately)

 

Warning!

 

Improper installation, maintenance or use may cause product failure and serious personal injury.   

 

 

Inspect all contents prior to installation.  Report any missing parts to dealer immediately.

 

 

 

Carefully read all instructions before proceeding. Pay special attention to the safety instructions on page 4.

 

 

 

Save this instruction in the event that the manufacture must be contacted in the future for maintenance information.

 

Date:  07/07/21        Rev:   13             N.J.C.                                               File:    BA89QC

-

BK.pub                                                     Ref#:  920096

 

Customer Service     

(800) 247 7668

 

See Installation Video at www.youtube.com/bisoninc

 

——

 

Installation and Safe Use Manual

 

——

 

Qwik Change Basketball Systems

 

Model BA89QC

-

AW, BA89QC

-

BK

 

1.

 

Call your local utility locating service before digging, usually by dialing 811, to avoid serious injury or 

service interruptions.  Also avoid lawn sprinkler lines.

 

 

2.

 

Determine the desired position of the 

4” 

Square Pole 

(O) by taking into consideration that the distance  

 

      between the front of the 

4” 

Square Pole 

(O) and the face

 

of the 

Acrylic Backboard

 (L) changes as the 

 

      

Rim 

(N) height is adjusted. At the top position (official 10' height)

 

the distance is 22 1/2", at the lowest

 

      position the distance is 28" and at middle heights the distance is 30" to 

31”

. See Figure 1.

 

 

3.   Dig a minimum 8" diameter footing at least 36" deep, deeper in heavy frost areas.  Remove dirt in the

 

      bottom 1/3 of the hole in a bell shape to improve pole stability.  Amount of 

Quick Dry Cement 

(Q) required  

 

      will depend on final size of hole but an 8" hole, 36" deep with minor soil removal from the bottom will

 

      require approximately 1.25 cubic ft. of premixed concrete.  Always better to have too much rather than

 

      too little on site.  See Figure 1.

 

 

4.   Fill the footing to the top with medium wet, fully mixed concrete.  

Never use the 

Quick Dry Concrete 

(Q) 

 

      dry.

 

 

5.

 

Install the 

Pole Installation Aid Kit 

(P) around the 

4" Square Pole 

(O) using the instructions provided 

 

      with the 

Pole Installation Aid Kit 

(P) inside the 

4" Square Pole 

(O).  See Figure 1.

 

 

6.   Insert the 

4" Square Pole 

(O) into the center of the footing making sure that the warning label is at the

 

      back side of the 

4" Square Pole 

(O) and that the flat front face of the 

4" Square Pole 

(O) is square

 

      to the playing surface.  

If your warning label becomes damaged or unreadable, request a no cost

 

      replacement from the manufacturer.  

See Figure 1.

 

Summary of Contents for BA89QC-AW

Page 1: ...o avoid serious injury or service interruptions Also avoid lawn sprinkler lines 2 Determine the desired position of the 4 Square Pole O by taking into consideration that the distance between the front of the 4 Square Pole O and the face of the Acrylic Backboard L changes as the Rim N height is adjusted At the top position official 10 height the distance is 22 1 2 at the lowest position the distanc...

Page 2: ...e of pole This is not required if you chose to fill the pole with concrete 11 Using a marker or masking tape mark the 4 Square Pole O 95 above the actual playing surface Placement of the Extension Arm Assembly A below 95 is not advisable as it increases the chance of injury to young players See Figure 2 12 Remove the 3 8 hex lock nut and 3 8 x 6 1 2 Hex Bolt from the upper channel of the Extension...

Page 3: ...4 Square Pole P using 5 16 x 1 Hex Bolts I and 5 16 Flange Nuts J See Figure 3 17 Loosely attach the Backboard Mounting Angles H to the ends of the Upper and Lower Backboard Supports F G using 5 16 x 1 Hex Bolts I and 5 16 Flange Nuts J Do not tighten at this time See Figure 3 18 Assemble the Rim N using the instructions provided with the Rim N 19 Mount the Acrylic Backboard L and Rim N to the fro...

Page 4: ... 5 21 Raise the Rim N to the highest position and measure the distance from the top of the Rim N to the playing surface If necessary adjust to the official 10 playing height by loosening 1 2 Hex Nuts E on the 4 Square U Bolts B then slide the entire unit up or down the 4 Square Pole O USE CAUTION NOT TO DROP UNIT DOWN THE 4 SQUARE POLE P RISKING PERSONAL INJURY OR DAMAGE TO THE POWDER COATED FINIS...

Reviews: