P A R T S L I S T
Item
Qty
Description
Item
Qty
Description
A
1
Extension Arm Assembly
J
8
5/16" Flange Nuts
B
2
4”
Square U
-
Bolt
K
1
Pole Cap
C
4
1/2”
Flat Washers
L
1
Acrylic Backboard (packaged separately)
D
4
1/2”
Lock Washers
M
1
Acrylic Hardware (packaged with backboard)
E
4
1/2" Hex Nuts
N
1
Rim and Net (packaged separately)
F
2
Upper Backboard Supports
O
1
4" Square Pole (packaged separately)
G
2
Lower Backboard Supports
P
1
Pole Installation Aid Kit (inside the pole)
H
4
Backboard Mounting Angles
Q
TBD
Quick Dry concrete (provided by customer)
I
8
5/16" x 1" Hex Bolts
R
1
Pole Pad (packaged separately)
Warning!
Improper installation, maintenance or use may cause product failure and serious personal injury.
Inspect all contents prior to installation. Report any missing parts to dealer immediately.
Carefully read all instructions before proceeding. Pay special attention to the safety instructions on page 4.
Save this instruction in the event that the manufacture must be contacted in the future for maintenance information.
Date: 07/07/21 Rev: 13 N.J.C. File: BA89QC
-
BK.pub Ref#: 920096
Customer Service
(800) 247 7668
See Installation Video at www.youtube.com/bisoninc
——
Installation and Safe Use Manual
——
Qwik Change Basketball Systems
Model BA89QC
-
AW, BA89QC
-
BK
1.
Call your local utility locating service before digging, usually by dialing 811, to avoid serious injury or
service interruptions. Also avoid lawn sprinkler lines.
2.
Determine the desired position of the
4”
Square Pole
(O) by taking into consideration that the distance
between the front of the
4”
Square Pole
(O) and the face
of the
Acrylic Backboard
(L) changes as the
Rim
(N) height is adjusted. At the top position (official 10' height)
the distance is 22 1/2", at the lowest
position the distance is 28" and at middle heights the distance is 30" to
31”
. See Figure 1.
3. Dig a minimum 8" diameter footing at least 36" deep, deeper in heavy frost areas. Remove dirt in the
bottom 1/3 of the hole in a bell shape to improve pole stability. Amount of
Quick Dry Cement
(Q) required
will depend on final size of hole but an 8" hole, 36" deep with minor soil removal from the bottom will
require approximately 1.25 cubic ft. of premixed concrete. Always better to have too much rather than
too little on site. See Figure 1.
4. Fill the footing to the top with medium wet, fully mixed concrete.
Never use the
Quick Dry Concrete
(Q)
dry.
5.
Install the
Pole Installation Aid Kit
(P) around the
4" Square Pole
(O) using the instructions provided
with the
Pole Installation Aid Kit
(P) inside the
4" Square Pole
(O). See Figure 1.
6. Insert the
4" Square Pole
(O) into the center of the footing making sure that the warning label is at the
back side of the
4" Square Pole
(O) and that the flat front face of the
4" Square Pole
(O) is square
to the playing surface.
If your warning label becomes damaged or unreadable, request a no cost
replacement from the manufacturer.
See Figure 1.