background image



Inspect all contents prior to installation. Report any missing parts to dealer immediately



Read all instructions before proceeding. 

—— Instruction Manual —— 

PK10XL

 

Competition Pickleball System 

P A R T S   L I S T 

 

Item 

Qty 

Description 

Item 

Qty 

Description 

Winch Post 

TN10CS Center Court Hold Down Strap 

Non-Winch Post 

TNCSA Center Strap Anchor 

Removable Winch Handle 

Lacing Cord 

PK10NXL Pickleball Net 

PK23 or PK235 Socket  (Optional) 

Date: 11/7/2018            Rev:  1           B.A.               N.J.C.                 File: \pub\pk10xl                                              Ref#:  960921 

1.  Use the attached court diagram to determine where to locate and dig two 
 

8” round and 48” deep holes 22 feet apart. See Figure 1. 

 
2. Insert 

Winch

 (A) and 

Non-Winch 

(B) posts into the holes with the lacing 

 

bars facing the pickleball court and fill holes with concrete. Each hole will 

 

require between 6 and 8 1/3 cubic foot bag of concrete. Make sure to brace 

 

posts while concrete is curing to maintain the 36 1/2” dimension and ensure 

 

the post remain perpendicular to the court surface. See Figure 1. 

 
3.  Dig one 8" round and a minimum 12" deep hole centered between the 
 

two pickleball posts (make sure to bell out the bottom of the hole). Insert 

 

TNCSA Center Strap Anchor

 (F) with the strap retaining bar running 

 

parallel with the 

PK10NXL Net 

(D) and fill hole with concrete. The hole 

 

will require 2 to 3 1/3 cubic bags of concrete. See Figure 2. 

 
4.  Concrete must cure 7-10 days before continuing with 

PK10NXL Pickleball 

 Net

 (D) installation. 

 
5. Stretch 

out 

PK10NXL Pickleball Net 

(D) across the court. 

Note: 

Use models 

PK23 or PK235

 (H) for removable post installation. Use 

instructions provided with these sockets for installation procedure. 

48"

8"

Lacing Bar

36 1/2"

FIGURE 1 

6.  Hook the loop on the 

PK10NXL Pickleball Net 

(D) top cable around the 

 

net retaining pin on 

Non-Winch Post 

(B) and over the top pulley.  

 

See Figure 3. 

 
7.  Cut off loop and remove 12” of nylon cable coating from the top net 
 

cable, insert cable into the winch cable hole on the 

Winch Post 

(A). Use 

 the 

Removable Winch Handle 

(C) to crank cable until you achieve 34” at 

 

the center of 

PK10NXL Pickleball Net 

(D). See Figure 4. 

 

Reviews: