15mm Office Block
B15-CS-002
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and
remember to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place
while you allow glue to dry.
Start by removing the front wall and awning
sections (shown above) from the sprue.
Glue the awning together as shown above.
Attach it to the front wall.
Take the other three walls and the brackets.
Attach the side walls, then glue the brackets to
the corners (being careful not to get glue in their
larger holes)
Glue the whole assembly to the base.
Take the inner walls.
Glue them into place behind the openings.