SETUP:
1.
Open and set the awning according to the manufacturer's instructions.
2.
Position the strap in the awning rail and center it between the canopy and the awning's upper arm.
3.
Unfold the fabric.
4.
Slide the short (7") bungee ball assembly through an eyelet at the top of the panel. Use the grommet that best matches
the pitch and extension of the awning (Fig. 1).
5.
Loop the bungee into the hook strap and around the bungee assembly ball.
6.
Lift the front edge of the fabric and thread the long (12") bungee assembly through the grommet (Fig. 2).
7.
Loop the bungee over the roll bar and around the bungee assembly ball.
8.
Use the supplied stakes and cord to secure the bottom of the side panel sunshade through the eyelets.
FABRIC CARE:
1.
Do not use any type of caustic, granulated or abrasive cleaners.
2.
The best way to keep the fabric looking good and delay the need for deep or vigorous cleanings is to hose the fabric
on a monthly basis with clear water. This practice will help prevent dirt from becoming deeply imbedded in the fabric.
3.
However, a thorough cleaning will be needed every year. The fabric can be cleaned while still installed on the awning
tube. Use a soft brush and warm water with MAGIC-BOSS™ CITRUS AWNING CLEANER, a natural and eco-friendly
product specially formulated to remove built up dirt, tree sap and tough stains. Air-dry only. Never apply heat to the
fabric. Always allow the fabric to dry thoroughly before folding and storing
CAUTION :
Set the awning
power switch to off
to prevent the awning from retracting when the side panel
sunshade is installed.
CAUTION :
Do not roll up the awning with the side panel sunshade attached. The awning may not operate
correctly and damages to the awning canopy and side panel sunshade fabric could occur.
Strap
12’’ Bungee Ball
7’’ bungee Ball
INSTALLATION MANUAL
SIDE PANEL SUNSHADE
The side panel sunshade may be mounted on the left or right side of the awning.
FEBRUARY 2020
PAGE 1 OF 2
Use for Steep Pitch
Fig.1
Fig. 2