Installation
For Service Only
Aerada™ 1100 Series
Low Arc Faucet
S53-302 Battery Infrared
Metering Faucet (Center
Shank with 4" Trimplate)
215-1525 Rev. G; EN 07-209
© 2007 Bradley Corporation
Page 1 of 8
7/23/07
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 1-800-BRADLEY FAX (262) 251-5817
http://www.bradleycorp.com
IMPORTANT!
Read this entire installation manual to ensure proper installation, then file
this manual with the owner or maintenance department. Compliance and
conformity to local codes and ordinances is the responsibility of the installer.
Pressurized plumbing fixtures must be installed in accordance with
manufacturer’s recommendations. The supply piping to these devices must
be securely anchored to the building structure to prevent unnecessary
movement of the installed device when operated by the user. Use extreme
caution when installing the device to prevent damage to the exposed
significant surface.
Separate parts from packaging and make sure all parts are accounted for
before discarding any packaging material. If any parts are missing, do not
begin installation until you obtain the missing parts.
Flush water supply lines before making connections. DO NOT use pipe dope
on any faucet or supply connections. Possible solenoid contamination could
occur which will void any warranty. Teflon tape is the recommended sealant.
The incoming water supply can be tempered or cold. An optional Bradley
Vernatherm™ thermostatic mixing valve delivers tempered water at a
temperature no greater than 105°F. The 1100 series faucet operates at a
flowing water pressure of 20–80 PSI. A vandal-resistant .5 GPM flow restrictor
ensures a constant flow rate at all pressures.
Product warranties may be found under "Product Information" on our web
site at www.bradleycorp.com.
TH
IS
SID
E
UP
Packing List
!
!
!
!
Installation