Page 2: ...ely help you should a problem arise TentCraft Inc in no way represents the estimated holding power to be true in all cases It is an estimate and as such does not imply that the figures are sufficient to hold any tent securely in windy or adverse weather conditions The tent installer accepts sole responsibility for the safe installation teardown and maintenance of any tent TentCraft does not represen...

Page 3: ...y 8 Perimeter Poles 111 Qty 4 3 Stakes Qty 4 18 Stakes Qty 4 S Series Tent Top Straps S SERIES 20x20 3 PERIMETER POLES PERIMETER POLE CONNECTORS CORNER BRACKETS CENTER POLE 8 LEGS 20 CABLES Qty 1 Center Pole 117 Qty 2 20 Cables Qty 4 Baseplates Qty 4 OutGuy Straps Qty 4 Corner Brackets ...

Page 4: ...ot install legs at this time Step 3 Begin assembly of the frame by inserting the perimeter poles into the perime ter pole connectors Then connect the perimeter poles into the corner brack ets Continue this process until the perimeter framework is assembled Step 4 Attach cross cables to opposite corners of the structure per the diagram to the left Use turnbuckle on cables to tighten them to the pro...

Page 5: ...nstall two adjacent legs by raising the frame on one side It is important to note the wind direction at this point and lift the legs opposite the direction of the wind Install baseplates at this point and make sure the cast hook on the baseplates point away from the tent Step 7 Install center pole by carefully inserting the pin end through the peak ring in the center of the tent top Once peak pole...

Page 6: ...ends of the Y straps into the carabiner Fold the valance flap over the Y straps where the strips of velcro line up to finish the corner Repeat this step at the remaining three corners Do not hook carabiner directly to metal valance rings Once all stakes have been secured and straps ratcheted taut fold all extra outguy strap length into the white vinyl covers with velcro closure Locate the outguy str...

Page 7: ...t the temporary structure can handle could be significantly below its wind load capabilities S SERIES 20x20 Guy Data 1 Polyester Web 3600 rating ASSUMES 1 Surface Compacted soil 2 Standard pull out rate 800 lb sq ft 3 Normal staking configuration conditions 36 Stake driven within 6 from the top of the ground straight down or a maximum 10 degree angle 7 17 8 5 20 Holding power is based on firm soil co...