1
Installation & Operator’s Manual
LS11
Liquid Spray System
2 x 160 Gallon Tanks
Tank Installation
1.
Position Pan Weldment on spreader’s body as shown
below.
—continued inside
WSE1 Cab Controller
WSE25
25' Cable
Connector
WSE24
8' Cable
Connector
front
back
3034829 PAN WELDMENT
3045405 GUSSET
2.
Weld Pan Weldment and Gussets to spreaders body
using dimensions shown below.
5" – 6-1/2"
3" MINIMUM
WELD AROUND BRACKETS
3034829
3.
Place tank #3032330, brace #3045404 as shown
below.
3032330 Reservoir
3034829 Pan Weldment
4.
Attach Tank Mounts #3034257 to #3045404 using
carriage bolts, flat washers and lock nuts as shown
below. Adjust mounts #3034257, so they touch spreader
body as shown in picture below. Weld mounts to spreader
body. Tighten nuts evenly to secure tank on spreader.
3032330
Reservoir
3045404 Brace
3/8-16 X 2.50
Carriage Bolt
3/8-16 Nylock
Nut
3/8 Flat Washer
Weld Mount 3034257
to Hopper. Longer Leg
on Bottom
5.
Plumb: Reservoir, ball valve, filter, pump enclosure, and
spray nozzles according to plumbing schematic using
supplied fittings, hose, and hose clamps. Do not use
Teflon tape on threads. Use liquid thread sealant.
Cab Controller Installation
1.
Install cab controller (#WSE1) in cab for conve-
nient driver operation. Mounting bracket and fasteners
included.
2.
Route 8' wire harness (#WSE24) under dash from con-
troller (#WSE1) to truck’s fuse panel.
3.
Ground “black” wire from controller to truck frame or
truck’s battery (not dash).
4.
Attach “green” wire in 8' wire harness (#WSE24) to a
fused and keyed 15 Amp hot wire circuit.
5.
Connect main power “white” wire in 8' wire harness
(#WSE24) to fuse box that is “hot” full time or to battery
“positive”.
6.
Route the 25' wire harness (#WSE25) from the rear
of the spreader to the cab. Plug connector on controller
(#WSE1) to the connector on pump harness (#WSE25).
9049 Tyler Blvd. • Mentor, Ohio 44060
Phone (440) 974-8888 • Fax (800) 841-8003
www.buyersproducts.com