background image

MEZZANINE GATE SYSTEM  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLATION  

 

AND OPERATION

 

INSTRUCTIONS

 

 

 

 

 

 

 

Keep this Manual with the MEZZANINE 
GATE system at all times. This will allow 
new users to read it before using system. 

 
 

It  is  the  MEZZANINE  GATE 

owner’s  responsibility  to  ensure  that  all 

workers installing or using this system are thoroughly trained. Provide 
workers with  this  Installation  Manual  and  make  sure  they  understand 
its  contents.  Read  it  to  them  if  necessary.  Letting  poorly  trained 
workers use this system can result in property damage and/or serious 
injury or death to personnel. 

 

WARNING! 

MEZZANINE GATE System must be installed according to the 
instructions outlined in this manual. Failure to do so could result in 
serious injury or death to personnel! 
 
To prevent serious injury or death, MEZZANINE GATE System must be 
installed using hardware provided by Garlock Equipment Company! 
 
To prevent serious injury or death, Installers of System must use 
OSHA-approved Tie-Off device to install or remove this System. 

 

 

 

 

            

 

Distributed by

CAI Safety Systems

Summary of Contents for MEZZANINE GATE

Page 1: ...t to them if necessary Letting poorly trained workers use this system can result in property damage and or serious injury or death to personnel WARNING MEZZANINE GATE System must be installed accordin...

Page 2: ...ary structure at the mezzanine edge Site Preparation 1 Move all tools and trip hazards a minimum of 10 ft back from mezzanine edge 2 Be sure you are installing the MEZZANINE GATE System to a permanent...

Page 3: ...d Gate System handles 48 wide pallets and weighs 270 lbs Consult factory for weights of custom size Gate Systems DISTRIBUTED BY CAI SAFETY SYSTEMS Phone 888 246 6999 Web caisafety com Email info caisa...

Page 4: ...will be to your left side as you look out over mezzanine Make sure edge of Plate is 4 back from edge of mezzanine Mark holes through the Plates Drill holes in mezzanine floor to show you where to dri...

Page 5: ...zanine floor using hardware supplied by Garlock Equipment Co Continue this process until all 10 bolts have been installed and Left Frame is completely secured to mezzanine floor DISTRIBUTED BY CAI SAF...

Page 6: ...ft Lift Outer Gate and slide Right Frame into a position where Gate will rest on Vertical Post of Right Gate Install Bumpers 155397 into the tops of the vertical posts of the Right Frame of the Mezzan...

Page 7: ...e to mezzanine floor in the same manner you previously installed Left Frame Secure Inside Gate and Outside Gate using Locking Collars 152797 and Allen Wrench Make sure Key is still in its proper place...

Page 8: ...ng down Locate pre drilled hole in Collar near the Inside Gate Using drill bit supplied with Gate drill through Rod Insert bolt and nut supplied with Gate through this hole and secure with wrenches DI...

Page 9: ...ther Guard installs from outside the Pallet area Install Gate Stop LH 408701Z RH 408702Z onto Bracket beneath each Gate Use 3 8 x 1 25 Bolt and Lock Nut Install a Rubber Pad 424357 on each side of the...

Page 10: ...to Mezzanine If Outer Gate is closed use Pole Option p n 405980 to open it See Pg 11 From Ground using Forklift place pallet inside loading area WARNING Before using Gate System make sure all parts a...

Page 11: ...oll Free 1 800 328 9522 to place an order Support Channel 423922S Pole Option 405980 Gas Strut 154130 Ball End for Gas Strut 154105 Keys for Gate Shaft 110094 Locking Collars 152797 Warning Decals FRE...

Page 12: ...ng hole as shown Re install Nut and Washer on Bolt from back side of Frame Install the Ball Mount in the lower pre drilled hole and fasten it to the Frame with the Nut and Washer also from back side o...

Reviews: