background image

   
   
   
   
   
   
   
   
   

CX-EPD 2850L 

Pre Load Electric Strikes  

Installation Instructions and Technical Support 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

Selection:      

Fail   Safe/Fail   Secure   use   
Phillips   screwdriver   to   select   
setting   

Note:

      

Pre-­‐load   feature   only   
functional   with   fail   secure   
operation   

Latch   monitoring   standard   on   
all   pre   load   models   

Adjustment:

   

To   change   position   of   keeper,   
use   Phillips   screwdriver   to   
loosen   (3)   screws,   move   
keeper   to   desired   location,   
and   then   tighten.   

Jamb   Preparation

   

Dimensions

   

Summary of Contents for CX-EPD 2850L

Page 1: ...e use Phillips screwdriver to select setting Note Pre load feature only functional with fail secure operation Latch monitoring standard on all pre load models Adjustment To change position of keeper use Phillips screwdriver to loosen 3 screws move keeper to desired location and then tighten Jamb Preparation Dimensions ...

Page 2: ...l with the edge of the frame If this is not the case use the provided support kit to compensate as shown below Connection Latch Monitoring Output Built in latch monitoring feature wired to access control system Power Input 12 24V AC DC Using a multimeter confirm that you have the correct output voltage at the power supply Using a multimeter confirm that you have the correct input voltage at the st...

Page 3: ... rubbing or binding on the top or bottom portion of the ramp 4 Check the spring latch of the lock make sure it is operating in a smooth manner Check the dead latch pin to make sure it retracts and springs back out in a smooth manner as well 5 If you find the spring latch binding or sticking at the bottom of the ramp you may have to file or grind the 90 degree edge of the spring latch slightly to a...

Page 4: ... equal and is greater than 1 8 please ensure you notch the frame as shown below 7 ALWAYS remember to check that the voltage selector is set to the correct voltage you are providing and ALWAYS check the voltage from your power supply while under load with a multi meter to make sure it is supplying the correct voltage 5502 Timberlea Blvd Mississauga ON Canada L4W 2T7 www camdencontrols com Toll Free...