Summary of Contents for FROG PLUS Series

Page 1: ...SERIES FROG PLUS INSTALLATION MANUAL FROG PM BELOW SURFACE SWING GATE OPERATOR English EN...

Page 2: ...tallation P 5 Preliminary checks P 5 Tools and equipment P 6 Types and thicknesses of cables P 6 Standard installation P 6 Preparing the foundation box P 7 Installing the operator P 8 Connecting to th...

Page 3: ...to the public All maintained action com mands must be placed where the moving gate leaves transit areas and driveways are completely visible If missing ap ply a permanent label that shows the positio...

Page 4: ...C 50 60 Hz 230V AC 50 60 Hz Motor power supply 230 V AC 50 60 Hz 230 V AC 50 60 Hz Maximum draw 5 1 A 2 6 A Power rating 1200 W 600W Maximum Torque 800 N 800 N Opening time 90 30 S 45 S Reduction rati...

Page 5: ...following is necessary Set up a suitable omnipolar cut off device with distances greater than 3 mm between contacts wit sectioned power source Set up proper conduits and electric cable raceways making...

Page 6: ...TWISTED 3 x 0 5 mm2 Connecting the antenna RG58 max 10 m N B If cables are of a different length than that shown in the table determine the cable section based on the actual draw and the number of con...

Page 7: ...ends on the dimensions It is up to the installer to choose the most suited solution Dig a pit to house the box set up junction boxes with the corrugated tubes required to thread connections coming fro...

Page 8: ...Cancelli Automatici S p a to notify said changes ENGLISH Installing the operator Lubricate the foundation box pin the anchoring lever and gate bracket pin N B orientation of illustration right hand in...

Page 9: ...the gate leaf to ease mounting of the gearmotor Insert the gearmotor into the box fasten it via the threaded pins and lock it using the supplied screws Insert the adjusting screw into the motor arm H...

Page 10: ...LISH 1 Control panel 2 Left gear motor 3 Right gearmotor 4 Junction box 5 Junction pit Connecting the 230 V A C gearmotor with opening delay Connecting the 230 V A C gearmotor with closing delay 230 V...

Page 11: ...0 N B orientatation of illustration right hand inside view Turn the adjusting screw 1 of the motor arm 3 Open the gate leaf until it touches the opening strike plate loosesn the adjusting screw 1 unti...

Page 12: ...tion box and fasten it using the screws N B orientatation of illustration right hand inside view M8x25 UNI 5933 screw The manual release lets the gate leaves open and then re attach to close in case o...

Page 13: ...y be changed at any time and without obligation on the part of Came Cancelli Automatici S p a to notify said changes ENGLISH Insert the key into the manual release lock and turn it counter clockwise O...

Page 14: ...y mistake Immediately stop using the operator if any anomaly is manifested Danger of hand crushing Danger of foot crushing Danger high voltage Transit forbidden during operation The periodic maintenan...

Page 15: ...opens nor closes No power supply The gearmotor is released The tramitter battery is run down The tramsitter is out of order The stop button is stuck or broken The opening closing button or key switch...

Page 16: ...Job carried out _______________________________________________________________________________________ _______________________________________________________________________________________________...

Page 17: ...70 ver 1 1 1 1 08 2011 CAME cancelli automatici s p a The data and information in this manual may be changed at any time and without obligation on the part of Came Cancelli Automatici S p a to notify...

Page 18: ...Automation Solutions Pvt Ltd Automation Solutions Pvt Ltd A 10 Green Park 110016 New Delhi New Delhi 91 11 64640255 256 91 2678 3510 CAME Americas Automation Llc CAME Americas Automation Llc U S A 11...