2
Attach
air hose
to regulator outlet.
Adjust
regulator
knob so outlet
pressure is between
60 psi and 100 psi.
1
Close
pressure
regulator,
Turn on
compressor and
Allow
tank to reach
maximum pressure.
Setup
Like a Pro
CHN71500 — Air Powered Pin Nailer
Pin Nailer
CHn71500
Attach
coupler on
airhose to nailer inlet.
4
Load
fasteners. See manual for further information regarding
length and type of fasteners.
3
© 2010 Campbell Hausfeld/Scott Fetzer
IN730500AV 6/10
Setup
Like a Pro
Easy Setup Guide
Projects are easier with
Campbell Hausfeld
products.
Thank you for deciding to purchase a Campbell
Hausfeld product. We are dedicated to providing
tools that help you to complete your projects
Like a Pro
.
60
psi
100
psi
NOTICE: To operate this tool you will need
at least a 1 gallon compressor.
Press
magazine latch button
and pull magazine open.
Close
magazine.
Load
pins with points all the
way into the groove.
Visit us at
chpower.com