background image

Installation Instructions  

AF60-12  

Required Crew: 3-4 Required 
Concrete: 12, 80 lb. bags  

Required Tools:  

● Wheelbarrow  
● Step Ladder (6’ or taller)  
● Shovel  
● Tape Measure  
● Digging Bar or Pick  
● Level  
● Allen Wrench (Provided)  
● Open end or Box Wrenches: 9/16”, ¾” 
● Hammer or Mallet  
● Ratchet Handle & Sockets: 9/16”, ¾” 
● Marker Pen  
● Drill: Cordless or electric, or impact driver  

 

Component Playgrounds is concerned about the safety of your vision. It 
is important that you choose to protect your vision by wearing proper 
safety glasses during each and every phase of this construction 
process.  

PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING  

The AF60-12 can be installed as a one day project. The normal time 
required to install the AF60-12 is about 3-5 hours for a three to four man 
crew. This time requirement will vary dependent upon the composition of 
the soil and the speed of the installers. Mix and pour the concrete as the 
last step.  

*Before digging, please obey local laws by notifying your local 
underground utilities marking organization*  

 

Summary of Contents for AF60-12

Page 1: ...is important that you choose to protect your vision by wearing proper safety glasses during each and every phase of this construction process PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNI...

Page 2: ......

Page 3: ...bly Step 1 Slide the ends of the 10 Top Rail as far as it will go into the Sleeves of the Triple Ends Step 2 Insert and tighten 4 3 8 x 3 8 set screws into each of the Triple End Sleeves using Allen W...

Page 4: ...2 Reassemble on to swing top rail Tighten securely so that the hanger is firmly attached in place and cannot slide or swivel along top rail 3 Attach carabineer with chain through the ring Note We rec...

Page 5: ...the triple end Find A Frame Bolt Pack 2 Align the holes in the legs with the holes in the triple end and join together using a 3 8 x 2 3 4 hex bolts and 3 8 nyloc nuts Tighten 3 Insert and tighten set...

Page 6: ...e ends and stand structure up into the place you want it to be installed Mark holes around a frame leg move set to the side of markings and dig holes Notice Most of the A frame leg hole needs to be du...

Page 7: ...Place the set into the holes Align the legs Place a level on the top rail and make the necessary adjustments to get set level...

Page 8: ...bout three to four inches below the top of the hole This will allow you to replace the sod and have enough soil depth for the grass to continue growing As a result of this you will use a lesser amount...

Page 9: ...azards in this type of equipment when used improperly Children should be instructed as to proper caution to take in its use Equipment should NOT be used when it is wet or icy Equipment should only be...

Page 10: ...discolored or may eventually rust Should this happen a touch up using a cold galvanizing compound followed by a coat of silver aluminum spray paint will make them look new again These items can be pur...

Page 11: ...includes a vinyl canopy this product should be inspected occasionally for wear and will need to be replaced as necessary Depending upon your environmental conditions the normal life expectancy of the...

Page 12: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Page 13: ...t cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or cons...

Page 14: ...ipt Invoice Number Model s For safety please inspect all moving parts on a regular basis At least yearly Especially paying attention to wear within the swing hanger Customer Information Name Address C...

Reviews: