background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Quick 

Start Guide 

G-Series Remote IO

GN-9284  

CC-Link IE Field Basic 

Introduction 

Example 

System 

 

Connections 

 

Install CSP 

Profile 

 

PLC Ethernet 

Setup 

 

Network 

Configuration 

 

Download 

Settings 

 

Monitor 

Data 

 

Summary of Contents for GN-9284

Page 1: ...tart Guide G Series Remote IO GN 9284 CC Link IE Field Basic 1 2 3 Introduction Example System Connections 4 Install CSP Profile 5 PLC Ethernet Setup 6 Network Configuration 7 Download Settings 8 Monitor Data ...

Page 2: ...rt guide the focus will be on GX Works3 compatible products like the iQ F and iQ R PLCs 2 Example System Layout 2 1 This section is a system example that will be utilized for this guide For simplicity the system will be limited to a master PLC and a single slave GN 9284 adaptor PLC FX5UC 32MT DSS TS Remote IO GN 9284 Slice 1 GT 1238 8 pt IN Slice 2 GT 2328 8 pt OUT Slice 3 GT 3424 4 pt Analog IN S...

Page 3: ...er as in Figure 3 1 4 Register Profile 4 1 Download the GN 9284 CSPP profile and register in GX Works3 Tool Profile Management Register 24 VDC 0 VDC System Power 0 VDC Field Power 24 VDC GND Figure 3 1 Adaptor Power Connections Figure 4 1 Register Profile ...

Page 4: ...ngs for the PLC in GX Works3 For details on GX Works3 reference the software manuals 5 2 GN 9284 IP Address setting Set DIP switches 1 10 to ON This will set the adaptor IP to 192 168 3 1 Figure 5 1 PLC Ethernet Settings Figure 5 2 DIP Switch Settings ...

Page 5: ... 1 by dragging in the GN 9284 adapter from the Module List Select these settings Points RX RY to 64 1 Occupied Station RSVD No Setting IP Address 192 168 3 1 Subnet Mask 255 255 255 0 Click the Close with Reflecting the Setting button Figure 6 1 CC Link IE Field Basic Settings Figure 6 2 CC Link IE Field Basic Configurations ...

Page 6: ...1 will be Y500 RWr D 4000 Note The first analog input data on Station 1 will be D4000 RWw D 5000 Note The first analog output data on Station 1 will be D5000 6 4 Apply the settings and close the window 7 Download Settings 7 1 Write the parameters to the PLC and reboot the PLC GN 9284 adaptor 8 Monitor Data 8 1 Use the GX Works3 Device Buffer Memory Batch Monitor or Watch Windows to read write data...

Page 7: ......

Page 8: ...Crevis USA 5220 C E 64th St Indianapolis IN 46220 800 xxx xxx www crevis us CREVIS QS GN 9284 A ...

Reviews: