Doc No.:DH/QP-03-13-DH-EPC-

Explosion-proof Integrated PTZ & Camera Ver:

1.1 2018.1.10

ZHEJIANG DAHUA SYSTEM ENGINEERING CO.,LTD.

DH-EPC□-PTZ-□

Explosion-Proof Integrated PTZ & Camera

Instruction Manual

Please read this

instruction manual

before use!

2614

2G Ex db op is

C T6 Gb

2D

Ex tb op is

C T80ºC Db(DH-EPC□-PTZ-IR)

2614

2G Ex db

C T6 Gb

2D Ex tb

C T80ºC Db(

DH-EPC

-PTZ

)

EN60079-0:2012+A11:2013, EN60079-1:2014, EN60079-28: 2015,
EN60079-31:2014
IEC60079-0:2011, IEC60079-1:2014, IEC60079-28: 2015,
IEC60079-31:2013

Ex marking:

Reference standards:

Summary of Contents for DH-EPC PTZ Series

Page 1: ...amera Instruction Manual Please read this instruction manual before use 2614 Ⅱ2G Ex db op is ⅡC T6 Gb Ⅱ2D Ex tb op is ⅢC T80ºC Db DH EPC PTZ IR 2614 Ⅱ2G Ex db ⅡC T6 Gb Ⅱ2D Ex tb ⅢC T80ºC Db DH EPC PTZ EN60079 0 2012 A11 2013 EN60079 1 2014 EN60079 28 2015 EN60079 31 2014 IEC60079 0 2011 IEC60079 1 2014 IEC60079 28 2015 IEC60079 31 2013 Ex marking Reference standards ...

Page 2: ...for choosing our Ex products Please read this Instruction Manual carefully before installation and operation of this product following the instructions and keep this instruction manual properly Copyright 2017 Zhejiang Dahua System Engineering Co LTD All right reserved ...

Page 3: ...system cn Quality Guarantee For DH EPC PTZ Explosion proof Integrated PTZ Camera we provide free maintain service in the guarantee period but we will ask the user to pay for the cost of labor and component in the follow conditions Damage caused by improper operation that against the Instruction Manual Damage caused by unauthorized disassembly Thunder or other force majeure natural disasters If any...

Page 4: ...ere pressure ambient temperature and relative humidity specified in Chapter 1 6 To be sure the power supply complies with the requirement indicated in the nameplate The internal and external grounding shall be reliable Ensure the installation is firm and reliable to avoid unexpected damage of the camera It s not allowed to do any modification on qualified products otherwise explosion proof perform...

Page 5: ...es get access in the internal chamber No disassembly or modification allowed 2 Construction Safety The protective regulations on construction spot shall be followed strictly Measurement shall be carried out immediately when any security risks found to eliminate the risks stop construction if necessary All kinds of safety facilities shall be inspected calibrated or repaired in the event of severe w...

Page 6: ...lent in transmission We suggest using this product with Lightning Protection Devices Internal and external grounding shall be reliable and the cross sectional area shall be no less than 4mm2 5 Operation maintenance requirements Do not dismantle this product there is no user serviceable part inside Do not touch the CCD or COMS directly a proper way is to blow away the dust with a blower on the lens...

Page 7: ...emain the right to modify the content and technical specifications of the product in this Instruction Manual without any form of notification when the product updates there may exist little differences after updating You can get the latest software and description document by consulting the customer service department Any problem in operation of this product please contact the distributor or custo...

Page 8: ...d gap of the joint of associate components and limit the maximum surface temperature The enclosure is able to subject to static pressure test 2 0MPa for at least 10s specified in EN60079 01 2014 IEC60079 1 2014 no leakage or deformation allowed after test The maximum surface temperature will no more than 80ºC in normal operation Tempering glass is adopted in observation port the tempering glass sh...

Page 9: ...nual VII De energize the product holding the bottom part to move it no force on the sunshade screen wiper base no dragging or knocking allowed DH EPC PTZ IR DH EPC PTZ When the product is energized it s NOT allowed to open move knock or drag this product ...

Page 10: ...e installation 4 2 2 Cable entry 5 2 3 Wall mounted Installation 6 2 3 1 Support installation 6 2 4 On spot installation and fixing 8 2 4 1 Instruction for installation 8 2 5 Adjusting and operation 9 2 5 1 System connection 9 2 5 2 Cable specification 10 2 5 3 Parameter setting 10 2 5 4 Inspection and examination before power on 12 2 5 5 Service status and inspection in service 12 2 5 6 Settings ...

Page 11: ...ance It s applicable for petrol industry chemical industry wharf harbor non coal mine aerospace industry aircraft industry military industry food processing industry and so on All associate technical document drawings and samples of the camera are tested and certified by China National Quality Supervision and Test Center for Explosion Protected Electrical Apparatus CQST ATEX certification number C...

Page 12: ...cture design make no external cable connection it could rotate for 360º in horizontal and 90º in vertical 1 3 Scope This product is applicable for Zone 1 and Zone 2 hazardous areas that explosive mixture of group IIA IIB IIC T1 T6 gases vapors and air may exists Zone 21 and Zone 22 hazardous areas that explosive dust may exist 1 4 Mechanical parameters Material Stainless steel 304 316L Automatic h...

Page 13: ...cal parameters Voltage and current 100 240V AC or 24V AC Max 3 0A Consumption 75W Electrical connection Comprehensive cable Communication type RS 485 Control communication speed 2400 19200bps adjustable Control communication Protocol PELCO D PELCO P Preset positions 128 precision 0 1 Auto cruise 4 groups 16 cruises in each group 30s interval ...

Page 14: ...Ω Dielectric strength dielectric test of 50Hz AC1500V shall be conducted between power terminal and the enclosure for 1min dielectric test of 50Hz AC500V shall be conducted between wiring terminals and the enclosure no breakdown or flashover allowed 1 8 Special conditions for safe use Engaged length and engaged threads are greater than values in IEC EN 60079 1 The width of flameproof joint is more...

Page 15: ...Other tools in installation 1 Cross screw driver 6 150 1pcs 2 Outer hexagon adjustable wrench 300 36 1pcs Cautions in service It s not suggested for users to dismantle this product at will please follow the Instruction for operation The power must comply with requirements specified in 1 5 Please use this product in conditions atmosphere pressure temperature and humidity specified in chapter 1 6 Si...

Page 16: ...out of reach by human beings and there is no other subject may affect the rotation of the camera otherwise falling or damage may happen even personnel safety may be harmed 2 3 1 Support installation Select Wall mounted installation holes in proper positions ensure the direction of the camera is correct fasten the wall mounted bracket with anchors or plug bolts Junction box is always installed in p...

Page 17: ...plosion proof Integrated PTZ Camera Instruction Manual 7 Figure 2 3 1 2 Dimension of Wall mounted Bracket Figure 2 3 1 3 Front view of Wall mounted Bracket Figure 2 3 1 4 Side view of Wall mounted Bracket ...

Page 18: ...ribution of installations holes under the camera take DH EPC PTZ IR as example pass the reserved cable of the camera through the cable in the support the cable connected from camera to junction box could be protected by explosion proof flexible pipes or armored cable cable from junction box to control room could be protected by metal pipes or by armored cables see Figure 2 4 1 Figure 2 4 1 install...

Page 19: ... cable network or wireless network as the main network for digital video signal transmission it s available for users to monitor or record the videos at any time by network no matter in local area network LAN or wide area network WAN such as internet Analog system is controlled by explosion proof control keyboard and explosion proof control box it s available for user to monitor the scene conditio...

Page 20: ...io grounding white purple Audio input blue white Alarm input 1 blue Alarm input 2 black white Alarm input grounding orange Alarm output 1 COM1 orange white Alarm output 2 OUT1 yellow 485 output A white 485 output B Fast Ethernet orange white Network cable 1 orange Network cable 2 green white Network cable 3 blue Network cable 4 blue white Network cable 5 green Network cable 6 brown white Network c...

Page 21: ... OFF OFF OFF 2 OFF ON OFF OFF OFF OFF OFF OFF 3 ON ON OFF OFF OFF OFF OFF OFF 4 OFF OFF ON OFF OFF OFF OFF OFF 5 ON OFF ON OFF OFF OFF OFF OFF 124 OFF OFF ON ON ON ON ON OFF 125 ON OFF ON ON ON ON ON OFF 126 OFF ON ON ON ON ON ON OFF 127 ON ON ON ON ON ON ON OFF 128 OFF OFF OFF OFF OFF OFF OFF ON 255 ON ON ON ON ON ON ON ON Baud rate setting toggle switch SW2 digit 1 2 see Table 2 5 3 2 Table 2 5 ...

Page 22: ...browser and client software See camera manufacturer s instruction manual for camera IE browser and client software setting 3 Trouble shooting Phenomenon Analysis Solution No image No power supply Check the power supply Poor connection of video signal cable Check the video signal cable Cannot switch to night viewing model Strong light in optical angle in manual night viewing switch model Remove the...

Page 23: ...d product can be delivered in all modes of transportation but without direct rain or snow 4 2 Storage This product can be stored for one year in such environment no corrosive substance no obvious vibration temperature range 0ºC 40 ºC and humidity no more than 90 4 3 Maintenance Six months after putting into service 1 Check all the fasteners 2 Inspect the cables ensure the protective sheath are not...

Page 24: ... focus to long focus Video compression H265 H 264MainProfile H 264HighProfile M JPEG Audio compression G 711a G 711mu PCM Primary bitstream resolution and FPS 50Hz 25fps 1920 1080 50fps 1280 720 25fps 704 576 25fps 640 480 60Hz 30fps 1920 1080 60fps 1280 720 30fps 704 480 30fps 640 480 6 Declaration We always tried to make this instruction manual as perfect as we can but we can not include all the...

Page 25: ...mark 1 Symbol means the content of the poisonous harmful substances or elements in the component homogeneous material is lower than the limit specified in the standard 2 Symbol means the content of the poisonous harmful substances or elements in the component some certain homogeneous material is more than the limit specified in the standard SJ T11363 2006 Leakage or mutation of this poisonous harm...

Page 26: ... following conditions the product is not considered within the quality guarantee scope Client cannot bring forth the quality guarantee card and invoice or receipt of purchasing Improper service conditions such as unmatched power ambient temperature humidity or lighting caused malfunction Malfunction caused by accident negligence disaster incorrect operation or network attack Malfunction or damage ...

Page 27: ..._________________ ________ S N ________________________ ______________ Date of manufacture __________ YYYY ________ MM ________ DD Date of purchase __________ YYYY ________ MM ________ DD If you have any other suggestions or requirements please write down ________________________________________________________ ________________________________________________________ ______________________________...

Page 28: ...ted PTZ Camera Instruction Manual 18 Zhejiang Dahua System Engineering Co LTD No 1187 Binan Road Binjiang District Hangzhou Zhejiang P R China TEL 86 0571 28179192 Zip code 310053 Website http www dahuasystem cn January 2018 ...