Output 05/2017
EN
Read manual before use!
Observe all safety information!
Keep manual for future use!
156077
PGDK
156075
PGMK
English
Page 1: ...Output 05 2017 EN Read manual before use Observe all safety information Keep manual for future use 156077 PGDK 156075 PGMK English...
Page 2: ...ing instructions as well as all other product related doc uments on to all owners of the product If you feel that these operating instructions contain errors inconsisten cies ambiguities or other issu...
Page 3: ...ords Depending on the severity of a hazard the safety messages are classified according to different hazard categories In addition the following symbols are used in these operating instructions DANGER...
Page 4: ...dards and safety regulations applicable at the installa tion site of the product All conditions and data specified for the product The conditions of the planned application In addition perform a risk...
Page 5: ...ve sufficient technical training knowledge and expe rience and be able to foresee and detect potential hazards that may be caused by using the product All persons working on and with the product must...
Page 6: ...E TO THE PRODUCT Verify compliance with the specified ambient conditions during transport or storage of the product Use the original packaging when transporting the product Store the product in a clea...
Page 7: ...the installation of virtually any standard cir culation pump with G11 2 connection and a length of 180 mm without major reworking of the insulation The second ball valve in the return line lets you re...
Page 8: ...rview 1 Return 2 Flow A Ball valve can be shut off with thermometer blue and gravity brake B Ball valve can be shut off with thermometer red C Circulation pump various manufacturers D Ball valve E 3 w...
Page 9: ...EX PG 05 2017 008 15 442 44_01 EN 4 2 Versions The variable insulation can be used for applications with flow at the left and flow at the right Fig 2 Flow right left figure Fig 3 Flow left centre figu...
Page 10: ...Product description EN 10 FA Daikin ROTEX PG 05 2017 008 15 442 44_01 EN 4 3 Dimensions and connections Approx 250 Approx Approx 475 Approx 152...
Page 11: ...ikin ROTEX PG 05 2017 008 15 442 44_01 EN 4 4 Approvals conformities certifications See operating instructions of the manufacturer of the circulation pump for ver sions with circulation pump A G1 B G1...
Page 12: ...kg without mixer Material of fittings Brass Insulation material Polypropylene EPP System pressure Max 10 bar observe maximum pressure of circulation pump used Axis distance 125 mm System connections...
Page 13: ...product corresponds to the speci fication value of the system Verify that the liquid in the system and the application area of the product are compatible Verify that the pipes are thoroughly flushed p...
Page 14: ...Interchanging flow return Unless otherwise specified all information in these operating instructions relates to the installation type flow right A Return B Flow C Red thermometer ball valve D Blue the...
Page 15: ...Mounting EN 15 FA Daikin ROTEX PG 05 2017 008 15 442 44_01 EN A Flow B Return C Blue thermometer ball valve D Red thermometer ball valve Fig 6 Flow left D A A B C D...
Page 16: ...Mounting EN 16 FA Daikin ROTEX PG 05 2017 008 15 442 44_01 EN 1 Interchange left and right lines 2 Turn the pump head 3 Change the actuator Flow right 4 Uninstall the actuator...
Page 17: ...05 2017 008 15 442 44_01 EN 5 1 2 Mounting the temperature probe optional 5 Re install the actuator Flow left 6 Fit the upper insulation Depending on the type of the temperature probe B it may be nece...
Page 18: ...all mounting NOTICE MECHANICAL LOADS AND STRESS Verify that the product is not subjected to mechanical loads and stress when connecting the product If necessary install a corrugated pipe compensator t...
Page 19: ...nections of the fittings no mechanical stress 11 Fit the upper insulation 1 Remove the upper insulation 2 Hold the product to the wall and align it with a level 3 Draw six marks 4 Interconnect the opp...
Page 20: ...ck protection class double insulation is not reduced by the type of electrical installation Failure to follow these instructions will result in death or serious injury DANGER ELECTRIC SHOCK CAUSED BY...
Page 21: ...position for filling of the system 4 Fill the system and apply pressure 5 Set the ball valves to 0 position 6 1 1 Thermometer ball valves 7 Operation Proper operation is only possible if the thermomet...
Page 22: ...ulation pump see instructions of the manufacturer of the pump 3 Open the thermometer ball valve and the ball valve 0 setting When Activity Monthly Perform a visual inspection of the heating system and...
Page 23: ...repaired by the manufacturer Also observe the corresponding instructions of the manufacturer in the case of malfunctions of the circulation pump or the actuator Problem Possible reason Repair Noise in...
Page 24: ...s Electronic components must not be disposed of together with the normal household waste 11 Returning the device Get in touch with us before returning your product 12 Warranty See our terms and condit...
Page 25: ......
Page 26: ...rotex heating com www daikineurope com Our partners abroad Unsere Partner im Ausland Nos partenaires l tranger Le nostre sedi all estero Nuestros representantes en el extranjero Nasi partnerzy za gra...