background image

 

Z10HL 

 

 

 

 

 

 

 

 

 
 
 
 

Summary of Contents for Z10HL

Page 1: ...Z10HL...

Page 2: ...mount B1 22 pieces B2 88 pieces B3 22 pieces R1 36 pieces R2 18 pieces R3 18 pieces R4 18 pieces R5 18 pieces R6 18 pieces C1 8 pieces C2 20 pieces V1 2 pieces V2 2 pieces Factory Dobrosfera 2018 Vers...

Page 3: ...154 pieces A foundation piles foundation frame floor lags flooring beams supports and anchorages of the lags of the second floor are not included in the delivery set Factory Dobrosfera 2018 Version 3...

Page 4: ...g of beams and the braces of the frame for correct convergence in the upper anchorage For installation of the cladding please use galvanized screws 5 70 every 20 cm perimeter To drill 3 mm by 53 mm de...

Page 5: ...of the frame serious injuries and even death Strictly adhere to the assembly instructions For work at a height use only specialized auxiliary equipment Be sure to use a construction helmet insurance...

Page 6: ...crew piles It is possible to use a band or monolithic foundation combining of perimeter piles and concrete support in the center other types of foundations Factory Dobrosfera 2018 Version 3 0 us dobro...

Page 7: ...nd lags of the first floor The lags of floor and the beams of foundation frame are not included in the delivery set they are locally manufactured from dry lumber Factory Dobrosfera 2018 Version 3 0 us...

Page 8: ...and the brace The holes and their location are shown in the figure Fix the brace and the nagel with a bolt M12 bolt with a nut and wide washers on both sides A total of 4 bolts per each nagel Factory...

Page 9: ...Frame assembly Support disk Factory Dobrosfera 2018 Version 3 0 us dobrosfera com 8...

Page 10: ...Assembly of units Factory Dobrosfera 2018 Version 3 0 us dobrosfera com 9...

Page 11: ...s Fixing lining are made of PSF plywood thickness of 30 mm We recommend to leave a sufficient second light to organize the stairs and maximum aesthetics of the construction To avoid sagging the lags o...

Page 12: ...Upper beam Factory Dobrosfera 2018 Version 3 0 us dobrosfera com 11...

Page 13: ...Sheet of frame cladding Factory Dobrosfera 2018 Version 3 0 us dobrosfera com 12...

Page 14: ...bar In the process of connecting the composite elements by the bar do not allow the output of the screws from the outside of the cladding otherwise it will damage the roof Sheathing is not included i...

Page 15: ...l dry place protected from direct sunlight and precipitation ensuring free circulation of air around the elements away from heat sources high humidity and extraneous odors The guarantee The manufactur...

Reviews: