background image

1

sprint 

gate

solar

Install Manual

1.06.17

Summary of Contents for Sprint Gate Solar Series

Page 1: ...1 sprint gate solar Install Manual 1 06 17...

Page 2: ...Battery Box 6 Solar Panel Post 6 Solar Panel 7 Gate Stops 7 Power Up 8 Programming 9 Connect Aerial 10 Connect Remotes 10 Set Solar Mode 11 Accessories 11 Solar Controller 12 Solar Gates In Winter 13...

Page 3: ...ndle the motor s forces Made in Australia for Sprint Gate purchase separately 24V MOTOR KEY REMOTES SOLAR PANEL BOOSTER AERIAL SOLAR PANEL POST SOLAR CONTROLLER MOTOR TO POST BRACKET ARM TO GATE ROTAT...

Page 4: ...r the motor TIPS Can be mounted on left or right post Best motor position is half way up gate post motor 1 2 3 Pin all arms sections together Fit arm to motor Extend arm NOTE S t a y Frame Mount the m...

Page 5: ...t Mount post bracket as shown with bottom edge on mark See previous page 6 Bolt motor to post bracket Tighten arm on motor 7 GATE THIS SIDE Arm Play around to set the rotating bracket to the gate stay...

Page 6: ...gate post It may be tight and need some encouragement with a rubber mallet A couple of self tappers will hold cap in place Battery Box Steel post cap not supplied in kit Measure diameter of post to m...

Page 7: ...shade covers the solar panel between 9am 3pm it can seriously reduce the battery charge Even if just for a short time Solar panel shouldn t be covered by tree shade Panel can be placed in a full sun p...

Page 8: ...Cover solar panel connect black red power cables to Solar Panel and Batteries Motor s control board plus solar controller are now active Controller may need to be turned on Cable tie the power cables...

Page 9: ...shows on display Press middle button once flashes 4 3 5 6 Press hold the middle button till stops flashing Gate will automatically open close to search for gate stops Gate should finish in closed posi...

Page 10: ...trol Board connect remotes 1 2 connect aerial 1 2 3 8888 p005 8888 lea 8888 000 8888 00 1 8888 ____ 8888 lea Thread coaxial cable through grommet in motor base Motor bottom view Grommet Strip black ou...

Page 11: ...unction such as visitor control and improved security However more accessories will drain the batteries so also consider upgrading your solar system to a larger panel or bigger battery bank For more i...

Page 12: ...troller BATTERY pre wired to controller BATTERY LOAD CHARGE ON OFF Off No Charge On Charging Flash Faulty Panel Voltage normal Under voltage Overcharge Off Current overload On correct output voltage S...

Page 13: ...28 52 76 Cronulla 32 56 80 Darwin 54 78 102 Deception Bay 40 63 86 Dee Why 32 56 80 Devonport 26 49 72 Dubbo 34 58 82 Earlwood 32 56 80 Echuca 30 54 78 Engadine 32 56 80 solar angles 90 0 80 70 60 50...

Page 14: ...3 86 Mornington 28 52 76 Morphett Vale 32 55 78 Mosman 32 56 80 Mount Gambier 28 52 76 Mount Isa 46 69 92 Murray Bridge 32 55 78 Nerang 38 62 86 Newcastle 34 57 80 North Shore 36 59 82 Nowra 32 55 78...

Page 15: ...15 trouble shooting 1800 241 733 Call our Tech Team...

Page 16: ...16 downee com au...

Reviews: