Instruction Manual 

 

Pow-R-Line Retrofit Panelboards 

Page 

1   

 

 

 

Effective: November 2007 

P1R & P2R Retrofit Panels 

                                                        

 

For more information visit: www.EatonCanada.ca                

                                                                      

 

Contents 

INSTALLATION CRITERIA .......................................................................................................................................... 2 

SAFETY MEASURES ..................................................................................................................................................... 3 

PRE-INSTALLATION:  RECEIVING, HANDLING AND STORAGE ......................................................................... 4 

REMOVAL OF EXISTING PANELBOARD INTERIOR .............................................................................................. 4 

INSTALLATION OF RETROFIT PANELBOARD INTERIOR..................................................................................... 4 

ENERGIZING PANELBOARD....................................................................................................................................... 9 

MAINTENANCE ............................................................................................................................................................. 9 

APPENDIX..................................................................................................................................................................... 13 

 

 
 

 

IL01417001E

Summary of Contents for Pow-R-Line P1R Series

Page 1: ...els For more information visit www EatonCanada ca Contents INSTALLATION CRITERIA 2 SAFETY MEASURES 3 PRE INSTALLATION RECEIVING HANDLING AND STORAGE 4 REMOVAL OF EXISTING PANELBOARD INTERIOR 4 INSTALL...

Page 2: ...er BAB 30 60 100 26 5 14 25 4 5 Breaker BAB 42 60 100 33 5 14 25 4 5 Breaker E or F Frame 18 60 225 30 14 25 4 5 Breaker E or F Frame 30 60 225 36 14 25 4 5 Breaker E or F Frame 42 60 225 42 14 25 4 5...

Page 3: ...ons of this custom built product Eaton Electrical has made all reasonable efforts to ensure that the instructions in this document are adequate and free of material errors and omissions Eaton Electric...

Page 4: ...SHOULD INSTALL AND OR SERVICE THIS EQUIPMENT Removal of Existing Panelboard Interior DO NOT work on electrical equipment while energized Verify power entering the equipment is de energized at the sou...

Page 5: ...t compromising wire bending space requirements as listed in the Appendix Table 1 Ensure that electrical clearance requirements are maintained per NECTM CECTM Care must be taken to ensure that the trim...

Page 6: ...Never clip cable wire strands in order to fit within connectors If cable wire does not match the rating of the connector contact the manufacturer Use an antioxidant compound if required Insert bare c...

Page 7: ...lly inspect panelboard insulators bus bar and conductors for damage DO NOT ENERGIZE IF DAMAGE IS FOUND Contact Eaton Electrical Circuit Breakers Circuit breakers are typically shipped in either the op...

Page 8: ...DE ENERGIZED FAILURE TO SHORT OR DISCONNECT DURING PANELBOARD TESTING WILL RESULT IN FAILURE OF ELECTRONIC COMPONENTS DISCONNECT POWER AT SOURCE BEFORE REMOVING OR INSTALLING FUSES HAZARDOUS VOLTAGE...

Page 9: ...ns in downstream equipment 3 Verify and follow the sequence of energizing circuits and loads Verify phase sequencing on loads such as motors which can be damaged or destroyed by incorrect phase connec...

Page 10: ...ces metering equipment and other components Damage to insulation and other surface materials can occur Do Not Use Compressed Air in cleaning Maintenance after Cleaning After cleaning perform a second...

Page 11: ...t a series of inspections be made at quarterly intervals until the progressive effects of local conditions can be analyzed to determine a regular schedule Panelboard Events and Service Interruptions S...

Page 12: ...rials and tools from the equipment Inspect all connections for damage and torque Re install all covers fillers dead front assemblies and side sheets Conduct panelboard insulation resistance testing de...

Page 13: ...for Copper or Aluminum Bus Bar Connections Bolt Size Torque Inch Lbs Torque Foot Lbs 10 30 2 5 65 5 4 5 16 130 10 8 3 8 240 20 600 50 National Electrical Code and NEC are registered trademarks of the...

Page 14: ...P2R Retrofit Panels For more information visit www EatonCanada ca 11 2007 Notes 2007 Eaton Corporation All Rights Reserved Printed in Canada Publication No PUB50895 November 2007 Eaton Yale Company 5...