background image

 

                    

                

EH

 

1.02

 

 

 

 

 

 

 

 

 

Customer

 

Helpline:

 

+44

 

(0)1242

 

676625

  

        

Mon

 

– Fri

 

9:00am

 

– 5:00pm

          

mail@eden

greenhouses.com

 

Zero 

Threshold

TM

Hints and Tips 

Handbook 

www.edengreenhouses.com

Birdlip

Burford

Blockley

Bourton

Summary of Contents for Zero Threshold Birdlip

Page 1: ...EH 1 02 Customer Helpline 44 0 1242 676625 Mon Fri 9 00am 5 00pm mail eden greenhouses com Zero ThresholdTM Hints and Tips Handbook www edengreenhouses com Birdlip Burford Blockley Bourton...

Page 2: ...The new Eden Zero thresholdTM range of greenhouses are constructed using bolt channels Take note of where you will need to slide extra bolts into the channels for fixing horizontal bars bracing or ro...

Page 3: ...on 4 Bays 2 Inner bays 1 1 9 5 13 5 A These tips are to make the assembly simple when it comes to section 4 ASSEMBLE An extra square headed bolt 50 and nut 51 should be located in the return of corner...

Page 4: ...or Aperture Bourton 4 Bays Door Aperture 2 2 These tips are to make the assembly simple when it comes to section 4 ASSEMBLE An extra square headed bolt 50 and nut 51 should be located in the return of...

Page 5: ...e adjustments needed when it comes to glazing The table below will show the measurements needed for the bays Measurements are taken from the centre of the bolt channel to the next Model 618mm Birdlip...

Page 6: ...let it slide down then tighten back up As shown left C remove the nut from the bolt 51 50 to attach the diagonal brace then place nut back on the bolt loosely with brace now secured Then place into th...

Page 7: ...Birdlip All Burford All Blockley All Bourton All 5 The table left in Section 5 of your instructions shows how many square headed bolts nuts 50 51 are required to be pre loaded as shown below into the...

Page 8: ...lazing rubber 42 to the vent sides 25 Then pre load 2x square headed bolts and nuts 50 51 into the holes provided at either end of the vent head vent sill 24 26 Using the pre loaded bolt and nut slide...

Page 9: ...f the centre door rail 30 there is a channel which the black foam pad 112 needs to be slid into as shown in box 6 Next attach the centre door rail with black foam pad 30 112 using 2 pre loaded square...

Page 10: ...Using the slider layout page in your in your instruction manual in section 7 shown right line up the slider inner 114 A with the top rail depending on which hand door you re constructing then secure w...

Page 11: ...nual If you have a greenhouse 10ft or longer you must fit ground anchors 64 along the sides How to do this is illustrated in your instruction manual If you have chosen to anchor the greenhouse down on...

Page 12: ...e front integral base 18 as shown in boxes 6 or 8 Line up the holes on the front base slide bracket 97 with the holes on the front integral base 18 as shown in boxes 7 or 9 and 12 Then secure the two...

Page 13: ...traight edge to check Another way to check this is to measure from the centre of the bolt channel on both door posts checking they are the same distance apart all the way down I e parallel 1 1 2 3 Mak...

Page 14: ...E IF YOU HAVE HORTICULTURAL GLAZING AND YOUR GREENHOUSE IS IN AN EXPOSED OR WINDY AREA MORE SPRING WIRE GLAZING CLIPS ARE RECOMMENDED WE SUGGEST INCREASING THEM TO FOUR PER SIDE OF EACH PANE OF GLASS...

Page 15: ...es all the way down the length of the pane you should be able to hear the click as you go as shown right Some of the C2 capping requires cutting for the roof vent bays only To glaze the roof the same...

Page 16: ...to fit the plastic parts to your greenhouse This section is pretty self explanatory but to make the gutter ends 53 54 water tight we recommend sealing them with silicone to the ends of the gutters 2 T...

Page 17: ...Hints and Tips Handbook 16 Eden Greenhouses Customer Helpline 44 0 1242 676625...

Reviews: