– English 1 –
Q ui c k St a r t G u i d e
1. Unpack the Switch and Check Contents
AS4610-30T
AS4610-30P
AS4610-54T
AS4610-54P
Rack mounting kit—two brackets and eight screws
Four adhesive foot pads
Two power cords
Console cable—RJ-45 to DB-9
Micro-USB to USB Cable
Ground wire (included with DC PSUs only) (AS4610-
30T/54T only)
DC power connector (included with DC PSUs only)
(AS4610-30T/54T only)
Documentation—
Safety and Regulatory Information,
Quick Start Guide
(this document) and
WEEE flyer
Note:
For information on switch software, refer to
www.edge-core.com
.
Switches with part numbers 4610-54-O-******** have the
Open Network Installer Environment software installer pre-
loaded on the switch, but no switch software image.
Information about compatible switch software can be
found at
www.edge-core.com
.
Note:
The switch drawings in this document are for
illustration only and may not match your particular switch
model.
Warning:
For a safe and reliable installation, use only
the
accessories and screws provided with the AS4610 series.
Use of other accessories and screws could result in damage
to the unit. Any damages incurred by using unapproved
accessories are not covered by the warranty.
Avertissement:
Pour une installation sûre et fiable,
utilisez
uniquement les accessoires et les vis fournies avec le
AS4610 serie L’utilisation d’autres accessoires et vis pourrait
endommager l’appareil. Les dommages causés par
l’utilisation d’accessoires non approuvés ne sont pas
couverts par la garantie.
Warning:
For indoor use only. The switch, AC power, and
all connected cables are not designed for outdoor use.
2. Mount the Switch
Attach the brackets to the switch.
Use the screws and cage/clip nuts appropriate for the rack
to secure the switch in the rack.
Caution:
Installing the switch in a rack requires two
people. One person should position the switch in the rack,
while the other secures it using the rack screws.
Note:
The switch can also be installed on a desktop or shelf
using the included adhesive rubber foot pads.
3. Ground the Switch
Ensure the rack on which the switch is to be mounted is
properly grounded and in compliance with ETSI ETS 300 253.
Verify that there is a good electrical connection to the
grounding point on the rack (no paint or isolating surface
treatment).
For a PoE switch, attach a lug (not provided with PSU) to a
#12 AWG minimum grounding wire (not provided with PSU),
and connect it to the grounding point on the switch rear
panel. Then connect the other end of the wire to rack
ground.
For a Non-PoE switch, attach a lug (not provided with PSU) to
a #18 AWG minimum grounding wire (not provided with
PSU), and connect it to the grounding point on the switch
rear panel. Then connect the other end of the wire to rack
ground.
Caution:
The earth connection must not be removed
unless all supply connections have been disconnected.
2
1
1
2
1
2
1
2
E092018-AP-R02
150200001921A
www.edge-core.com
AS4610-30T | AS4610-30P | AS4610-54T | AS4610-54P
24/48-Port GE Data Center
Switch