background image

Installation- and maintenance instructions 2022-03

Roof hoods E-line & S-line 
Roof inlets EKO-T & EKO-TD

Summary of Contents for E-line

Page 1: ...Installation and maintenance instructions 2022 03 Roof hoods E line S line Roof inlets EKO T EKO TD ...

Page 2: ...echanical damage occurs to it Commissioning The product must not be used until the whole the installation is in operational con dition Personnel requirements Assembly installation and sommissioning must only be carried out by instructed per sonnel or by the manifacturer Instructions in this manual must be followed if you have any questions contact the supplier Damage due to incorrect transport han...

Page 3: ...g or sling hooks must be used in combination with chains slings or straps Use all four lifting points Carefully check that the assigned lifting points are not damaged before lifting Check that the specified angle 20º is on connecting lifting gear is not ex ceeded For compensation of angles or lengths must approved screws be used When lifting our roof hoods the met hods described for the particular...

Page 4: ... 30 49 63 48 130 80 56 57 94 95 75 190 100 79 79 132 125 95 230 120 106 106 162 160 125 270 140 138 137 210 205 155 305 160 174 179 267 250 175 345 180 223 226 340 200 273 278 420 Model Size EKO TD El30 10 30 12 36 13 41 16 52 18 62 20 63 22 74 24 84 28 96 30 106 34 118 40 140 42 150 44 162 46 184 48 215 50 255 Model Size EKO T EI30 3 19 4 26 5 32 6 39 6 5 43 7 46 8 52 9 59 9 5 63 10 66 11 72 12 7...

Page 5: ...ding to the charts and examples below 2 Use the lifting points and place the Roof inlet in the hole 3 Secure the Roof inlet to the ceiling with the mounting brackets 3 by screwing in the attach ment points Use self drilling sheet metal screw 4 8x25 mm or equivalent 4 Cover the Roof inlet with plywood 2 roofing felt 1 sheet metal or other approved sealing method The Roof inlet must be at least 300 ...

Page 6: ...ine size 20 100 EKO SUH is placed in the roof hood outlet and adapted to its attachment points in the hood 1 Adjust the EKO SUH to the desired position and lock with a sheet metal screw in the up per edge of the hood 2 Lock EKO SUH with blind rivet nut M10 and sheet metal screws Calculate the desired area A q v v Desired outlet speed m s q Available air flow m3 s A Outlet area m2 AxB EKO SUH ...

Page 7: ...Installation of the mount frame The mounting frame consists of four loose angle plates with foldable sheets in the corners 1 Fold the plate 90º 2 Bring the corners of the angle plates together 3 Fold the plates another 90º so that they lock the angle plates together ...

Page 8: ...Min 300 mm ovan tak Installation and maintenance instructions Installation of the mount frame 1 Place the mounting frame on the Roof inlet 2 Screw the mounting frame to the Roof inlet Use self drilling sheet metal screw 4 8 x 25 mm or equivalent above the ceiling ...

Page 9: ... mounted horizontally i Important Follow the lifting instructions to perform safe lifting 1 Use the lifting points and place the roof hood on the mounting frame 2 Attach the hood to the mounting frame by screwing in the attachment points Use self drilling sheet metal screw 4 8 x 25 mm or equivalent 2 1 20 For Combined Hoods the supplied gasket must be mounted on the roof hood between exhaust air a...

Page 10: ...od s wire mesh is secure mounted and have no visible damages Remove any accumulation of leaves dirt or snow Make sure that no object obstructs the air flow Inspect the drainage holes in the Roof hood that no dirt or leaves obstruct the water from running out of the hood Cleaning The requirement for cleaning cor responds to the requirements which is placed on the facility in general and the applica...

Page 11: ...jselgatan 7 235 32 Vellinge Tel 040 42 16 00 www ekovent se info ekovent se REGIONAL OFFICE GÖTEBORG Boråsvägen 5 435 31 Mölnlycke Tel 031 23 07 40 REGIONAL OFFICE STOCKHOLM Vallgatan 9 170 67 Solna Tel 08 508 613 00 ...

Reviews: