background image

w w w . e n a i r. e s

 

 

 

 

   

 

 

     

   

      

    

      

  

 

 

 

 

 

 

 

E30

 

 

WIND TURBINE

USER MANUAL

 PRO

 

PRO

ENAIR ENERGY S.L.

Avda de Ibi, Nº 44 - 03420 - Castalla  

Aptdo Correos 182 -  Alicante - SPAIN

Tel: +34 96 556 00 18

  

e-mail: info@enair.es

Web: www.enair.es

Summary of Contents for E30 PRO

Page 1: ...w w w e n a i r e s E30 WIND TURBINE USER MANUAL PRO PRO ENAIR ENERGY S L Avda de Ibi N 44 03420 Castalla Aptdo Correos 182 Alicante SPAIN Tel 34 96 556 00 18 e mail info enair es Web www enair es...

Page 2: ...iency and manufactured with high quality materials If you have any comments or questions to us please contact our Customer Service department by writing to info enair es In this manual you will find a...

Page 3: ...re to locate your wind turbine 12 4 Packing and assembly 15 4 1 Packaging of the machinery 15 4 2 Machine assembly 18 5 Installation 21 5 1 Manual brake 21 5 2 Flanged endshield 22 6 Maintenance 23 6...

Page 4: ...els up to 50kW For the development of this activity we have various specialized production centres in each of the subjects spread throughout Spain but mainly in the province of Alicante where ENAIR ha...

Page 5: ...rade 8 upwards at which the wind can cause damage to the wind turbine by swirling object Grade usual name observable effects on land Speed m s Speed km h 0 Calm Vertical smoke 0 to 0 2 0 to 1 1 Light...

Page 6: ...itting the signals over long distances on these occasions rarely electricity reaches these places isolated energy systems are the guarantee for optimal operation of the station For facilities of farms...

Page 7: ...d is transformed into rotational kinetic energy The variable pitch system regulates the rotational speed for high wind speeds The generator converts this rotational kinetic energy into electrical ener...

Page 8: ...y in relation to the rpm and achieves superior performance because less heat 3 2 Innovations ENAIR PRO New Design The centre of gravity coincides with the axis of rotation The fast orientation allows...

Page 9: ...int and the maintenance planning shown in the 6th point Corrosion resistance Structural design with fiberglass and aluminium as well as the application of surface treatments allow the wind turbine to...

Page 10: ...WIND TECHNOLOGY 34 96 556 00 18 info enair es Avenida de Ibi 44 P O 182 03420 Castalla Alicante Espa a www enair es P a g e 10 3 4 Technical Information...

Page 11: ...WIND TECHNOLOGY 34 96 556 00 18 info enair es Avenida de Ibi 44 P O 182 03420 Castalla Alicante Espa a www enair es P a g e 11 Performance curves 3 8m 3 4m 1 8 m...

Page 12: ...r the tower is because the wind speed increases with height You must consider that a taller tower is a major economic investment which on the other hand is most often easily amortizable Land shape Nor...

Page 13: ...uction For example if you have a house 5 meters tall and a tree 7 meters near where you want to install your ENAIR 30 it should be allocated to 17 meters above ground 7 m the highest obstacle 10 m 10...

Page 14: ...nd 20H If A 3H Size of area downwind 10H most common situation Prevailing winds It is important to know from where the most frequent and strongest winds come from in regarding of the area where you wa...

Page 15: ...e pitch o Screws see details below o 1 rudder guidance o 3 blades o Controller Resistance Switch Braking inverter o Investor optional depending on model Package 2 Optional according to customer reques...

Page 16: ...connected by those screws If the applied torque is below the recommended there is risk of vibrations Screws metric x length Joining pieces Tightening torque Quantity M10 x 40 Rudder gondola 46Nm 34Lb...

Page 17: ...stallation must be performed by qualified professionals During installation make sure that your wind turbine is braking with the 3 phases short circuited and disconnected from the electrical installat...

Page 18: ...N 933 M 14x55 INOX A2 8 Pressure washer screw M14 bonding DIN 127 zinc plated 8 Washers screw union DIN 125 M14 zinc plated 16 Binding screw nut DIN 934 M14 INOX A2 8 Tools 22 spanner hexagonal of 22...

Page 19: ...screw scoop holder DIN 912 A2 M10x80 INOX 12 Allen screw scoop holder DIN 912 A2 M10x80 INOX 3 Pressure Washers screw union DIN 127 M 10 zinc plated 15 Tools 17 spanner hexagonal of 17 and torque wren...

Page 20: ...Clamp Washers DIN 125 M 10 zinc plated 6 Tools Allen glass 8 extension cable and torque wrench Tightening torque 46 Nm oder 34 Lbf ft Screws Allen screw casing DIN 912 M8x25 A2 STAINLESS 4 casing pres...

Page 21: ...nd speed is higher than 12 m s you must press the switch several times for the rpms to be lower If it doesn t work you must wait until the wind turbine gets a wrong point due to a wind gust so you pre...

Page 22: ...eak and load for the following data for the design The data provided has been obtained in accordance with IEC 61400 2 and does not include safety factors The straps welding head of the tower must be c...

Page 23: ...e she is directly led by a qualified technician All hardware elements that are handled during maintenance must be tightened with a torque wrench according to the torque table The frequency of maintena...

Page 24: ...90 km h 56 mph 1 Tighten screws rudder axis of rotation and toe Every 12 months Every 8 months 2 Tighten screws other tower e g joints couplings 3 Greasing bearings in the variable pitch 4 Greasing th...

Page 25: ...slot To loosen torque in the opposite direction of the usual loosening must be applied Visually verify that there are no loose parts and everything is properly screwed Check slackness of parts simply...

Page 26: ...and torque wrench 8 Tightening torque 46 Nm or 33 Lbf ft 6 x DIN931 M12 x 50 6 x DIN985 M12 Nut Tools end spanner 19 19 hexagonal socket extension and torque wrench Tightening torque 62 Nm or 46 Lbf...

Page 27: ...panner hexagonal of 22 and torque wrench Tightening 91 Nm or 67 Lbf ft Tools 22 end spanner hexagonal of 22 and torque wrench Tightening 91 Nm or 67 Lbf ft In case of using a lattice tower installatio...

Page 28: ...ng 5 Nm o 3 7 Lbf ft Screw cap carbon brushes DIN 7991 M 6x16 A2 INOX 2 To check the brushes it is necessary to remove the back cover and follow the steps ATTENTION after removing the sealing caps and...

Page 29: ...Classification NL6Z Grade 2 60 cycles worked penetration 280 1 10 mm Dropping point 230 0 C Source soap aluminum complex Bearing Step 6 Checking the Variable pitch Check that the bearing is greased a...

Page 30: ...ace of ENAIR Repaint if necessary Paint characteristics White paint Polyurethane paint RAL 9003 High resistance to corrosion and UV radiation Black paint Polyurethane paint RAL 9004 The leading edge R...

Page 31: ...tal Axis Wind Turbine and 3 blades instead of other designs Horizontal 3 blade wind turbines offer the highest efficiency based on their design and the Betz Law which defines the maximum theoretical c...

Page 32: ...the height to which migratory birds make their long journeys which makes it even more unlikely 6 Can I use a wind generator for my heating system Yes you can use a wind turbine to heat water Simply co...

Page 33: ...can be very variable with risk of being affected by turbulence due to the nearby obstacles So when in doubt it is best to contact professionals engaged in the installation of small wind turbines Norm...

Page 34: ...professional or the competent authority in each case 15 What materials are used in the ENAIR The structural parts of our wind turbines are made of stainless steel and aluminium Blades and other compo...

Page 35: ...charging check the following table where you can see the cable copper conductor associated with the model of Wind Turbine Model 20 40m 40 60m 60 80m 80 100m ENAIR 30PRO 24V 16mm2 25mm2 25mm2 35mm2 ENA...

Page 36: ...36 To determine the cable section downstream separating the wind turbine controller battery charging check the following table where you can see the cable copper conductor associated with the model of...

Page 37: ...functions or service of wind turbines ENAIR originating in 1 Negligent improper or inappropriate use of the product 2 Failure to observe the instructions for installation use maintenance and periodic...

Page 38: ...terials and workmanship then the Customer shall bear the costs of testing and processing generated Defective complained Products which do not meet the specifications will become the property of ENAIR...

Page 39: ...he serial number that appears in the manual of the wind turbine It is necessary to fill in the user s data in order to inform you when to carry out the preventive maintenance Once the warranty is acti...

Page 40: ...otified of the date of the next maintenance remember that the non execution of the maintenance cancels the warranty Once the maintenance has been done it has to be registered on the web for validity n...

Page 41: ......

Reviews: