background image

 

 

TECHNICAL MANUAL         ENG

 

ECO-NOMIC

 

R1 V0 08/09/2016 

Summary of Contents for ECO-NOMIC

Page 1: ...TECHNICAL MANUAL ENG ECO NOMIC R1 V0 08 09 2016 ...

Page 2: ...er saving Our company dedicates her best efforts developing new and innovative products that can promote savings We have taken on a permanent commitment to conceive innovative and efficient products so that this rational use of energy can actively contribute to the preservation of the environment and natural resources of the planet Keep this manual whose objective is to inform alert and advise abo...

Page 3: ... and Control Devices 14 4 Installation 15 4 1 Thermodynamic Solar Panel Installation 15 4 2 Set up of the Hot Water Cylinder Thermodynamic Block Indoor Unit 17 4 3 Refrigerant Connections 18 4 4 Hydraulic Connections 22 4 5 Electric Connections 23 5 System Operation 24 6 Troubleshooting 25 7 System Maintenance 26 7 1 General Inspection 26 7 2 Magnesium anode 26 7 3 Cleaning Filter of Pressure Redu...

Page 4: ...packed until it reaches the place and moment of installation Make sure all hydraulic connections are well tight before connecting the equipment to the power supply DANGER The electrical installation of the product must comply with the national regulations for electrical safety ECO NOMIC will only operate after refrigerant charge The maximum water pressure into the hydraulic circuit inlet is 0 3 MP...

Page 5: ...sure and temperature The principle for running this equipment is directly linked to high temperature and pressure thus the processes that imply contact with the equipment must be thought out with caution to prevent the risk of burns and projection of material Refrigerant The refrigerant used is R134a CFC free non inflammable and without harmful effects for the ozone layer However according to the ...

Page 6: ...rmodynamic solar panel and its fixation elements the other is the hot water cylinder with thermodynamic block together The packages contain 1 Thermodynamic panel and its fixing elements 2 Hot water cylinder with thermodynamic block on top 3 Installation manual warranty sheet ERP label product datasheet 3 2 1 ...

Page 7: ...al Always use ways of transportation suitable for the equipment pallet lift forklift etc OK NOK The equipment must be transported in its original package to the place of installation Check before beginning transport the unit if the path you will travel is unobstructed in order to prevent collisions that could cause damage to the device The packages contain the following information symbols Fragile...

Page 8: ...ernal agents mentioned above and the fluid inside the solar panel makes the fluid to evaporate on its inside The absence of glass in the solar panel allows for an increased thermal heat exchange by convection After circulating in the solar panel the fluid is aspirated by the system s mechanical component the compressor which will increase its temperature and pressure then the temperature is transf...

Page 9: ...d Temperature C 80 Heat Loss EN 12897 kWh 24h 1 01 THERMODYNAMIC SOLAR PANEL Material Solokote Anodized Aluminium Dimensions L x W x H mm 2000 x 800 x 20 Weigh kg 8 Max Working Pressure bar 12 Exposure Temperature Min Max C 40 120 THERMODYNAMIC BLOCK Absorbed Power Med Max W 390 550 Thermal Power Med Max W 1690 2900 Electrical Backup Power W 1500 Refrigerant Qt g R134a 1100 Piping Material Copper ...

Page 10: ...GeneralAssembly 1 Hot water cylinder 2 Thermodynamic block 3 Thermodynamic solar panel 4 Fixation elements 5 Insulated copper pipes not supplied 6 Expansion vessel not supplied 7 Safety group 7bar 8 Pressure reduction valve 3bar not supplied 4 3 5 2 1 6 7 8 ...

Page 11: ...MANUAL 11 3 3 2 Dimensions Thermodynamic Solar Panel Indoor Unit C Cold water inlet H Hot water outlet R Recirculation V Hz Power supply AN Magnesium Anode 2WV 3WV Refrigeration connections 2way 3way PT TPR Valve optional ...

Page 12: ...9 Power Supply voltage frequency 10 Protection Index 11 Fluid type amount 12 Maximum Power Absorbed with electric heater backup When contacting the installer or manufacturer make sure you have the following within reach Model Serial number Production number Date of production This information will make communication easier and consequently you will receive a quicker and accurate reply ...

Page 13: ... left and right designated according to side of connections Left Panel Right Panel The panels have the following pipe diameters 3 8 Aspiration upper connection 1 4 Liquid lower connection ODS welded to panel 3 8 flare Male SAE ODS welded to panel 1 4 flare Male SAE The parts provided for each panel are the following 1 Thermodynamic Solar Panel 2 Fixing elements 3 Aluminium brackets 3x small 3x lar...

Page 14: ... is made of stainless steel AISI444 Besides being resistant to corrosion the storage water heater has in addition a magnesium anode that should be checked periodically according to information by the installer 3 4 3 ExpansionVessel not supplied The expansion vessel is a device whose purpose is to compensate for the increase in water volume due to temperature rise and to reduce the consequence of a...

Page 15: ...by an arrow on the component An incorrect installation poses a danger to people and to the equipment 4 INSTALLATION Assembly sequence 4 1 Thermodynamic solar panel attachment 4 2 Set up of the hot water cylinder thermodynamic block 4 3 Refrigerant connections 4 4 Hydraulic connections 4 5 Electric connections 4 1 Thermodynamic Solar Panel Installation The nature of the site and the inclination ang...

Page 16: ... plastic bushing and a self thread M6 bolt which have been supplied The attachment of the panel to the brackets is done through M6 screws its nuts and washers The panel s packaging has a marking that serves as a guide bar for the holes drilled at the base This marking follows the diagram below 1 Aluminium brackets 2 Nylon plug 3 Screw M6 3x40 4 Washer M6 5 Screw M6x20 6 Nut M6 7 Thermodynamic sola...

Page 17: ...r points Always insulate the piping The temperature around the equipment must not exceed 40 C The hot water cylinder must never be kept outside and avoid exposure to sunlight Make sure the support surface is enough to accommodate the weight of the storage water heater filled with water Make sure that those sides with electrical appliances have at least a 500 mm gap for the purpose of maintenance E...

Page 18: ...an optimal system performance The system has a pre charge of refrigerant R134a The pipes used must be made of dehydrated refrigeration copper without seams Cu DHP type according to standard ISO1337 PIPES DIAMETER VAPOUR aspiration LIQUID panel inlet 3 8 1 4 Flowchart of refrigerant connections 4 3 1 Connection of Copper Pipes to the Panel 4 3 2 Connection of Copper Pipes to Indoor Unit 4 3 3 Nitro...

Page 19: ...lange the pipe with the appropriate tool shaping a conic edge make sure that there are no rough edges or imperfections and that the vertical of the walls are uniform WARNING e Tighten the female coupling with your hands turning it a few times We recommend the use of a suitable thread sealant The sealant should be placed between these two steps e and f If in doubt please contact the manufacturer f ...

Page 20: ...ing with your hand by giving it a few turns We recommend the use of a suitable thread sealant The sealant should be placed between these two steps c d If in doubt please contact the manufacturer d Secure with wrench applying the torque as before AVISO It is important to keep the valves closed before moving on to the next points The hot water cylinder thermodynamic block set is under fluid charge T...

Page 21: ...ly in the piping Valves Closed A 2 Way Valve B 3 Way Valve e Create a vacuum with the vacuum pump plugged to the 3 way valve as depicted keeping the valves completely close Keep the vacuum pump working for at least 30 min f Once the vacuum procedure is over shut the vacuum pump valves The vacuum pressure gauge should indicate the same reading after the pump has been stopped ensuring the installati...

Page 22: ...weight b Connect the hose of the fluid bottle R134a to the inlet of the 3 way valve c Switch off the compressor on the electronic panel d Open carefully and very slightly the handle of the fluid bottle notice the variation of the weight on the balance as you load fluid into the circuit the weight in the balance will decrease e When your reach the figure intended for the injection of cooling fluid ...

Page 23: ...n made to ensure the safety of people animals and others We recommend the installation of a cut off section valve between the gate valve and the hot water cylinder for the purpose of maintenance safety or emergency The Manufacturer is not responsible for damage related to not following these recommendations warnings 4 5 Electric Connections To establish the electric connection of the equipment che...

Page 24: ...itch TB Safety thermostat COMP Compressor 5 SYSTEM OPERATION In case of an anomaly in the system the orange sign A on the control panel will light up If this happens switch the green button off B1 and turn on the electrical resistance by pressing the red button B2 The water will be electrically heated until the system is repaired by a certified technician ...

Page 25: ...nutes and if you get hot water replace the faulty plumbing and or proceed with the correct positioning of the safety device Clean the filter of the safety device Water is too hot Problem with the thermostat Check correct running of thermostat Slow running of Thermodynamic Solar System Outside air temperature is very low The running of the equipment depends on weather conditions Inlet water tempera...

Page 26: ...nspection of the whole equipment with the purpose of detecting possible leaks and damaged devices 7 2 Magnesium anode This equipment has a magnesium anode that together with the building material of the tank will provide an effective protection against corrosion The internal shielding of the tank will ensure an effective protection against corrosion contributing to a water quality within the param...

Page 27: ...t to change its status mode If you could not determine what happened and it is still deactivated contact customer service to have your problem solved If everything is in order and you intend to reactivate the thermostat follow this procedure a Remove the top cover of equipment b Unscrew the cap of the safety thermostat 1 c Press the re arm pin 2 d Re cap the thermostat and the equipment 7 5 Empty ...

Page 28: ... for electrical electronic equipment or returned to the retailer when buying new equipment The end user is responsible for delivering the appliance at the end of its life cycle to the appropriate collection point The appropriate selective disposal for subsequent recycling treatment and environmentally compatible disposal of the appliance helps prevent possible harmful damage to health and the envi...

Page 29: ...ECO NOMIC TECHNICAL MANUAL 29 Notes ...

Page 30: ...anufacturer instructions or if there has been any form of intervention by unauthorized technicians has the appearance of modifications and or if the series number appears to have been removed or erased The equipment should be installed by qualified technicians according to the rules in effects and or the rules of the trade or the instructions of our technical services Further exclusions from warra...

Page 31: ...Energie Energia Solar Termodinâmica lda 4570 311 Laúndos Póvoa de Varzim Portugal Tel 351 252 600 230 Fax 351 252 600 239 Web www energie pt ...

Reviews: