background image

Motus

©

 

Powered

Installation Guide

NFR 

Visible Trims

April 2022  |  Revision B

SEL-PRT-00776

Summary of Contents for Motus Powered

Page 1: ...Motus Powered Installation Guide NFR Visible Trims April 2022 Revision B SEL PRT 00776 ...

Page 2: ...ion ensure you have read and understood the instructions POWER REQUIREMENTS DELIVERY The Motus Enigma pocket door system requires a low voltage electrical connection Wiring for the system can vary based on the type of connection Hardwired Optional 1 13 amp fused spur isolation switch 2 1 5mm twin and earth cable feed to the top of the pocket enclosure Kettle lead Wiring Standard 1 13 amp single so...

Page 3: ...fixings will come pre packaged to suit your specific project requirements Type 4 30mm screw Type 5 25mm self drilling screw Concrete Screws 7 5mm x 60mm M6 Screws 6mm x 100mm Timber Insert Motus Sliding Track Head Channel Intermediate Jamb Base Channel Leading Edge Jamb Door Guide Pin Channel Type 2 40mm screw Type 1 19mm self drilling pan head screw Type 13 60mm screw Type 3 50mm screw Brush Stri...

Page 4: ...n high rise buildings where you cannot fix to the ceiling or soffit then use the Enigma Self supporting Head installation detail Follow standard Enigma instructions to calculate your studwork structural opening and add the following dimensions Width 92mm and Height 44mm Refer to the specific Self supporting Head installation instructions for further details Width Single Width Double Height 1870 37...

Page 5: ...nstallation instructions CHECK SIZE WITH SCHEDULE STRENGTHEN HEAD B A When forming the structural opening please ensure you are working to the correct opening size provided on the door schedule M O T U S N F R V I N S TA L L AT I O N G U I D E W A L L C O N S T R U C T I O N P R E P A R AT I O N 9 LEVEL UP C Ensure the opening is square and plumb IMPORTANT We strongly recommend using a laser level...

Page 6: ...kettle lead ports are facing each other in the centre of the opening and with 100mm gap between the tracks FIT THE HEAD CHANNEL 3 1 1 M O T U S N F R V I N S TA L L AT I O N G U I D E F R A M E I N S TA L L AT I O N Single doors 2a Mark 50mm from the rear end of the Head channel and 70mm from the strike front end 2b The kettle lead port is at the front of the track and will be installed at the str...

Page 7: ...se channel on the floor against the rear stud If provided with a cut to size system position the notched end tight against the rear stud At this stage it is vital that to ensure that the centre line of the Base channel is secured directly underneath the centre line of the track above Any deviation will result in misaligned doors and trims Secure to the ground with Type 2 fixings Cover plate Non Sy...

Page 8: ... AT I O N G U I D E F R A M E I N S TA L L AT I O N 1 5 Single doors Push the kettle lead in the strike end of the track Run the excess cable behind the strike trim packer to the plug DO NOT power on at this point Double doors Remove the kettle lead ports on both tracks As standard Motus Double doors utilise a Sync unit to open both doors at the same time additional wiring is required See p18 For ...

Page 9: ...nce they are fitted HANG THE DOOR 4 4b 4c Adjust the bolts to achieve a gap approximately 15mm between the underside of the track and the top of the bolt ASSEMBLE GEAR 4a 3 The door leaf needs to be hung before the trim is fitted FIT THE GUIDE CHANNEL 200mm 150mm 100mm Apply a thin bead of adhesive into the groove in the bottom of the door and then tap the plastic channel into position Double Door...

Page 10: ...fer to the installation of a Sync unit and is used with Double doors ONLY For Single door installation please skip the following steps Work out in relation to your current internal wall cabling as to the route to the centre of the tracks then drill a hole no smaller than 8mm in the Head Channel as shown Remove the fascias on both tracks to expose the kettle lead port and connection terminals Ports...

Page 11: ...to cover the gap and screw into place 6 Fit the door guide pin at the finished floor level with Type 2 fixings The pin needs to be facing the strike stud and aligned centrally with the centre line on the base channel If your installation requires the door guide pin to be raised up use the 1mm stackable packers IMPORTANT 1 The pin needs to be fitted at FFL finished floor level If the finished floor...

Page 12: ...5mm self drilling screws Strike Trim Single door x1 Double door n a Head Trim Single door x1 Double door x2 Type 8 42mm self drilling drywall screws Type 9 50mm gold screws Panel Pins 30mm Strike Jamb Seals Leading Edge Trim Single door x2 Double door x4 VISIBLE TRIM COMPONENTS Spanner Visible trim kit All fixings will come pre packaged to suit your specific project requirements ...

Page 13: ...he end that is not notched Then fit the notched end centrally in the Head channel Plumb the strike trim using a level so it is aligned centrally with the Head channel and fix into place using the Type 9 screws IMPORTANT When installing double doors the strike jamb is not used INSTALL STRIKE TRIM 3 Dimension Underside of head profile to floor SET CLOSER STOP 4 Now the door leaf is hung you are read...

Page 14: ... now completed the installation of your Enigma Motus sliding pocket door with visible trim 2 7 M O T U S N F R V I N S TA L L AT I O N G U I D E T R I M I N S TA L L AT I O N 6 Now the wall can be tape and jointed and wall and trims painted IMPORTANT We recommend tape and jointing not plastering TAPE JOINT PAINT ...

Page 15: ...et has to be removed Loosen the screws at the end stop and move the end stop to the centre of the system IMPORTANT Do not remove or screw down the end stop MOVE END STOP B A 1 2 Lay the grounding line through the housing of the operator as shown in the picture and connect it to the grounding terminal PE EARTH CONNECTION 5 Carefully open the cover of the control unit housing by levering it out with...

Page 16: ... work undertaken to the doorset 4 Name date signature of designated responsible person 5 Include copies of the Check Details table below filled out at periods defined in the risk assessment Risk assessment carried out within the last 12 months Check door and pocket condition ensuring no sharp edges or other hazards Check all essential components are fitted and in serviceable condition If flush han...

Page 17: ...upport helpline 020 3880 0339 Email sales enigmapocketdoors com K2 Kents Hill Business Park Timbold Drive Milton Keynes MK7 6TT Visit our website for the very latest design styles Innovation Configuration Strength ...

Reviews: