Install the Enphase 

Encharge Storage System

To install the Enphase

 

Encharge 3

™ or 

Encharge 10

™ and the Enphase Wall-Mount Bracket, read and follow all warnings and instructions in this guide. Safety 

warnings are listed on the back of this guide. These instructions are not meant to be a complete explanation of how to design and install an energy storage 

system. All installations must comply with national and local electrical codes and standards. 

Only qualified electricians shall install, troubleshoot, or replace 

the Encharge 3 or Encharge 10.
The Enphase Storage System includes the Enphase Encharge Battery(ies) with integrated Enphase Microinverters™.  The Enphase IQ Envoy™ gateway 

measures PV production and home energy consumption. The Enphase Storage System senses when it is optimal to charge or discharge the battery so that 

energy is stored when it is abundant and used when scarce. Encharge storage systems are capable of providing backup power when Enphase Enpower

 is 

installed at the site.

Five unique installation scenari-

os are shown:

Whole home backup with Enpower 

as service entrance and PV combiner 

connected to Enpower. 

This is the 

preferred configuration for back up 

of the entire main load panel. This 

configuration supports up to an 80A 

breaker for the PV circuit and an 80A 

breaker for battery storage.

Whole home backup with Enpower 

as service entrance and PV combiner 

connected to main load panel. 

This is 

the preferred configuration when you 

back up the entire main load panel, and 

the size of the PV combiner circuit is 

more than 80A. In this configuration, the 

PV combiner circuit connection space 

in Enpower is left vacant. When existing 

PV combiner circuits are connected to 

the main load panel, and you want to add 

battery storage to the system, you can 

keep the PV combiner connected to the 

main load panel and connect only the 

battery storage system to Enpower.

Partial home backup with main load 

panel as service entrance and PV 

combiner connected to Enpower. 

When PV circuits breaker size is 

less than 80A, this is the preferred 

configuration for partial home backup 

with sub-panel.

Summary of Contents for ENCHARGE-10-1P-NA

Page 1: ...s are capable of providing backup power when Enphase Enpower is installed at the site Five unique installation scenari os are shown Whole home backup with Enpower as service entrance and PV combiner connected to Enpower This is the preferred configuration for back up of the entire main load panel This configuration supports up to an 80A breaker for the PV circuit and an 80A breaker for battery sto...

Page 2: ...uctural engineer and local standards for requirements Three 8 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall for each single wide wall mount bracket Nine 8 lag bolts or screws 7 6 cm 3 inches long depending on attachment wall for each triple wide wall mount bracket Washers for use between fastener heads and wall mount bracket Copper conductors No 12 8 AWG 11mm 7 16 inch stri...

Page 3: ...r these circuits according to local codes standards and other applicable requirements Enpower supports up to a maximum of 80 A breaker for Encharge connection circuit The subpanel could be a small two circuit box with circuit breakers the drawing only shows switches The circuit breakers in the box would have to be suitable for back feeding per NEC 408 36 D Select the right size subpanel and breake...

Page 4: ...s and ensure that the wall can support the structural load weight of the installation 4 Install the Encharge 3 single width or Encharge 10 triple width wall mount bracket Follow the instruction below for the bracket you are installing Encharge 10 triple width bracket A Place the wall mount bracket on the wall so that the mounting holes in the middle of the bracket align with the center of the stud...

Page 5: ...Supporting the Encharge battery unit from underneath the unit lift the Encharge battery unit hold it at an angle so the top of the Encharge battery unit sets into the top of the wall mount bracket C Once the top of the battery is engaged with the top tabs of the wall mount bracket keep the battery vertical make sure the battery is flush against the bracket and lower the battery down until fully se...

Page 6: ...ening has a groove around the hole to fit the O ring red of the raceway Make sure that the O ring is captured in the groove between the Encharge enclosure and the raceway flange adjacent to the O ring 6 Install conduit and field wiring continued E Using the conductors and suitable conduits connect the AC discon nect and the first adjacent Encharge Battery Use the conduit openings provided to conne...

Page 7: ...ellow see the following section on Troubleshooting 7 Encharge 10 cover installed Encharge 10 without cover Use the Enphase Installer Toolkit to commission the Encharge Battery ies Once connected to the Envoy refer to the Installer Toolkit help topics for more information After the IQ Envoy has detected the Encharge Battery ies the Encharge LEDs operate as described in the following section CONFIGU...

Page 8: ...scharge If the battery state of charge falls to 0 the Encharge Battery ies can be damaged or destroyed Because of this the Encharge Battery ies must only be stored for a limited amount of time The Encharge Battery ies must be installed and energized by the Must Energize By date on the shipping box label The Encharge Battery ies must have a charge state of no more than 30 when placed in storage To ...

Reviews: