L
W
A
Cat 6 Cat 6
E
B
Cat 6 Cat 6
Cat 6 Cat 6
D
Connect the GST Male connector to power.
Remove the screws cover by sliding it to the sides.
Insert the Innera Piatto into the hole.
Using screw driver install the 4 screws.
Components:
Critical safety information:
Installation:
Operation:
Cleaning:
Tools required:
Power Drill
Power Saw
Hole Cutter
Prior of use, please examine and verify that the product is not defected. Please do not install or operate if there is a defect of any kind.
If in any case you are facing misunderstanding of installation procedure, the installation should be carried out by certified electrician
Make sure you are installing the product on smooth straight surface. Do not install in any case that the surface is not straight or if there are levels differences.
Make sure water will not penetrate into the unit. In any case please make sure you are installing the unit, where proper leakage protection device is connected.
Drill hole into the surface according to the
INSTALLATION TABLE on page 2. Please verify
your purchased item's model No and drill the hole
according to the model's cutout dimensions.
Install the screws cover by sliding it to the sides.
The Innera Piatto is ready to use.
The product can be cleaned by a soft and dry fabric. Please do not use moisture, abrasives materials,solvents or any detergents which can be conductive
1
Innera Piatto
ISRAEL
Design & Electric
www.eufficio.com
Engineered in Germany
ATTENTION:
Read the instructions prior to installation.
INSTALLATION INSTRUCTIONS
Cat 6 Cat 6
2 x Cover
screws
4 x Screws
1 x Innera
Piatto
Cat 6 Cat 6
C
Cat 6 Cat 6
F