STEP 2: TUBE ASSEMBLY
Configuration f
or L16M*, L18, L18M*, IG20, IG20M*, L20M* and LC25 Tube Sets
STEP 1: SOLAR REEL PLACEMENT:
ASSEMBLY INSTRUCTIONS
for the BLANKET HANDLER (FG-BH)
& WHEELS REEL (FG-1B) REEL SYSTEMS
PLEASE READ ENTIRE INSTRUCTIONS CAREFULLY BEFORE PROCEEDING
REEL SYSTEMS COMPONENTS AND PREPARATION:
Getting started:
Ensure that your system has two cartons consisting of one end carton and
one tube set carton.
Tools required for assembly:
·
Portable drill
·
Tape measure
·
Pencil and Scissors
Tube Carton Parts List:
2 end tubes and 1 center tube
FG-BH Parts List:
(FG-BH)
2 End Brackets
4 Casters
2 Handles
2 Bearings
2 Plugs for 3“ diameter tubes
Hardware Kit: 20 Strap Plates
10 Straps 10 Plastic Screws
25 Self-drilling Metal Screws
A.
B.
Determine the best location for the reel system.
The widest point of the pool is the preferred locations (see Fig. 1 below).
Small cover extensions may be folded in to avoid using a wider reel.
At the determined location, measure the width of the pool and add 6“ (15 cm).
Ensure minimum of each end tube is inside center tube (see table below right).
Less than minimum insert causes screws to loosen and/or tubes to split.
Insert both end tubes equal distance into center tube
and mark on center tube where inner tubes end
Fig. 2a
Fig. 1
A.
Before starting assembly, trim cover to clear the inside top edge of your pool to eliminate drag when rolling up cover.
Recommended Solar Cover is 12 mil with round bubbles.
Allow an extra 4“ (10 cm) on cover length if installing the reel at mid-point or off-center.
Above-Ground
pools with deck
FG1B Parts List:
2 Wheels
2 Wheel Stops
2 Handles
2 Bearings
Hardware Kit: 20 Strap Plates
10 Straps 10 Plastic Screws
25 Self-drilling Metal Screws
2 Plugs for 3“ diameter tubes
Tube
Min. Max. Max. Wet
Max.
Insert Width
Cover
Cover
Weight
L16M*
9”
16’6” (5.03m)
60# (27.3kg)
16x32
L18/L18M* 9“
18’6“ (5.7 m)
60# (27.3kg)
18x36
IG20/IG20M*
12“
20’6“ (6.3 m) 60# (27.3kg)
20x40
L20M*
12“
20’6“ (6.3 m)
60# (27.3kg)
20x40
LC25
24”
25’ (7.6m)
75# (36kg)
25x50
·
·
* Mill tubes tarnish over time. Anodized tubes help reduce tarnishing.
Four Easy Steps:
If you need additional assistance, contact us at info@feherguard.com or call 905-876-4766 Monday to Friday 8:30 a.m. to 5:00 p.m. Eastern Time.
Recommend Safety Glasses
·