background image

RD 6009  Roof Dryer

CAUTION

NOTICE

Any modification 

to this machine 

voids all warranty 

and liability.

Moving parts can cause injury. Keep hands, feet and clothing away from air 

intake and all other moving parts on machine and engine. Never put hands or 

feet in air exhaust outlet while machine is running.
Blower housing becomes very hot. Keep away from housing when burner is on. 

Allow engine to run until exhaust air is cool after shutting off gas. Always have a 

fire extinguisher nearby.
Do Not attach hoisting devices near valves or hoses.
Always shut off engine and close valve on LP-Gas cylinder before refueling.
Never operate torch without blower.
Never lift machine with LP-Gas cylinder attached.
Never lift LP-Gas cylinder by valve.
Replace immediately any components that become worn, damaged or 

inoperative.

Assembly Instructions

Upon opening carton, examine RD 6009 Roof 

Dryer closely for damage. Report any damage to 

freight carrier.

See parts list enclosed prior to assembling Roof Dryer

1. Install front wheel bracket onto bolts and tighten 

lock nuts. Slide bushing in wheel and attach wheel  

to bracket with 5/16 bolt, flat washers and lock nut. 

2. Bolt handle brace to front cover

.

3. Install upper handle with hose assembly attached 

onto lower right and left handles. 

Leave nuts loose.

4. Place handle brace on inside of handle and place 

bolts through holes. Place lock nuts on bolts.

5. Tighten all bolts and nuts.

6. Place torch into holder and tighten set screw.

7. Tighten supply hose onto torch fitting.

    (No Pipe Compound Needed)

1

2

3

4

6

7

Flame Engineering, Inc. • 

W

est Hwy 4 • 

P

.O. Box 577 • LaCrosse, KS  67548

800-255-2469 • 785-222-2873 • Fax 785-222-3619

Instruction 

Sheet

See Reverse Side

 For Operating Instructions

Squeeze Valve

Lever

Adjustable Pilot

Valve

Reviews: