Forcepoint X10G™ Quick Start Poster
READ FIRST!
This poster describes setup steps for the X10G chassis and blade system.
Plan your deployment before setting up the X10G.
You can access documentation at:
http://www.forcepoint.com
Before you begin
Contact Forcepoint Technical Support if any items are missing.
Available options include:
· X10G HA Kit
· X10G Optical Kit
· X10G Mirror Port Expansion Kit
Contact your Forcepoint account representative.
Power Cables (4)
SFP+ Cables (2)
Switch Serial Cable
Cat 5 Cables (2)
1
Verify Contents
Null Modem Cable
DVD Drive
Sliding Ready Rail Kit
Blades are in separate cartons
See the Rack Installation Instructions in the Sliding
Ready Rail Kit.
Note: 4 persons required for racking chassis.
After the chassis has been racked, slide blades into the
slots of the chassis starting in slot 1 (top left slot).
Note: Blades slide smoothly when hanging from the top rail.
Do not force.
2
Rack and Install
3
Connect to Network
Without VLAN
Supports switch high availability (HA) using Access Ports and Spanning Tree Protocol (STP).
4
See back for steps to complete your setup
10GE SFP+MODULE
Link/Act
Link/Act
B A Y 2
SFP+ Cable
QSGM1K-100-RevJ
B2
C2
A2
B1
C1
A1
4
1
7
5
2
8
6
3
9
CMC2
CMC1
KVM
1
2
3
4 5
6
Gb
STK
CMC
CONSOLE
10GE SFP+
MODULE
Link/Act
Link/Act
B
A
Y
2
BA
Y1:ST
ACKING O
R 10G
U
PLINK MODULE
XG1
M6
220
XG2
B
A
Y
1
Link
ACT
17
18
19
20
CONSOLE
10GE SFP+
MODULE
Link/Act
Link/Act
B
A
Y
2
BA
Y1:ST
ACKING O
R 10G
U
PLINK MODULE
XG1
M6
220
XG2
B
A
Y
1
Link
ACT
17
18
19
20
X10G Network Diagram
B2
C2
A2
B1
C1
A1
4
1
7
5
2
8
6
3
9
CMC2
CMC1
KVM
1
2
3
4 5
6
Gb
STK
CMC
CONSOLE
10
G
E
SFP+MODU
LE
Link
/Ac
t
Link
/Ac
t
B
A
Y
2
BA
Y1:
ST
AC
KI
NG
OR 1
0G UPL
INK
MODUL
E
XG1
M62
20
XG2
B
A
Y
1
Link
ACT
17
18
19
20
CONSOLE
10
G
E
SFP+MODU
LE
Link
/Ac
t
Link
/Ac
t
B
A
Y
2
BA
Y1:
ST
AC
KI
NG
OR 1
0G UPL
INK
MODUL
E
XG1
M62
20
XG2
B
A
Y
1
Link
ACT
17
18
19
20
A1
A2
Log Server
Log Database
Microsoft® SQL Server
End Users
Forcepoint Security Manager
Policy Broker
Policy Server
Internet
Firewall
Internal
Network(s)
With VLAN
Supports switch high availability (HA) using VLAN trunking and Spanning Tree Protocol (STP).
Mail Server
With VLAN
Switch
A1 Te1/2/1 or Te1/2/2 10G interfaces carry blade server management
and user traffic using VLAN trunking.
See the X Series Switch Configuration Guide to perform initial switch
configuration.
A1 Te1/2/1 or Te1/2/2 10G interfaces carry blade server management and user
traffic using Access Ports.
See the X Series Switch Configuration Guide to perform initial switch
configuration.
A2 Te1/2/1 or Te1/2/2 10G interfaces can also be used to carry blade
server management and user traffic using VLAN trunking.
See the X Series Switch Configuration Guide to perform initial
switch configuration.
Without VLAN
A1
A2
A2 Te1/2/1 or Te1/2/2 10G interfaces can also be used to carry blade server
management and user traffic using Access Ports.
See the X Series Switch Configuration Guide to perform initial switch
configuration.
P1 and P2 are trunked together with VLAN enabled.
A1 Te1/2/2
A1 Te1/2/1
A1 Te1/2/2
A2 Te1/2/1
A2 Te1/2/2